Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Spillway Dilemma For Mine Tailings ClosuresBy T. Clarkin
This paper presents a hydrologic closure design concept to minimize the risk of water discharges from closed mine tailings facilities. It evaluates the applicability of U.S. Nuclear Regulatory Commiss
Jan 1, 2012
-
Development of Cyanide Leaching Processs For Small High Grade Gold and Silver DepositsBy Michael Harris, David Mosch
The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing
Jan 1, 1987
-
New Developments In Ground Support Technology For Open-Type Tunnel Boring MachinesBy Steve Chorley
Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good
Jan 1, 2011
-
Selective Froth Recovery (SFR) System To Increase Flotation RecoveryThe SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is
Jan 1, 2012
-
Super Cycle: Past, Present And FutureBy Douglas B. Silver
Traditional cycle theory would postulate that if you have a supply shortage relative to demand, the price will increase because buyers will incrementally increase the price they are willing to pay to
Jan 1, 2008
-
Miners Get Defensive At 2012 Northwest Mining Association MeetingSmart defense: that?s what the industry needs to play for the next four years, according to panelists at the 118th Annual Meeting of the Northwest Mining Association (NWMA), which met December 2-7 in
Jan 1, 2013
-
NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th BoreBy Bhaskar B. Thapa
The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p
-
Increased Prodcution Planned at Anshan Iron and SteelThe Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon
Jan 3, 1980
-
Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
Peruvian Mining Convention Focuses on Sustainable DevelopmentBy William R. Yernberg
The 26th Peruvian Mining Convention (Convención de Ingeneieros de Minas del Perú) was held Sept. 15 through 19, 2003, in Arequipa. The convention was sponsored by the Peruvian Institute of Mining Engi
Jan 1, 2004
-
The value of drilling - A chance-constrained optimization approachBy Michael Forbes, Rick Jeuken
The challenge of managing geological uncertainty in mine planning is central to optimizing resource extraction while minimizing risks and costs. This paper introduces a novel approach to coal mine pla
Jan 1, 2025
-
Steel Fiber Microsilica Shotcrete With Remote Controlled EquipmentBy Galyn Rippentropp, Finn Erik Overlie
INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura
Jan 1, 1987
-
Comparison of the transverse load capacities of various block ventilation stoppings under arch loading conditionsBy T. M. Barczak
Stoppings are required to resist lateral forces on the face of the structure to control pressure differentials created by ventilating air. The design criteria in other parts of the world, including Au
Jan 1, 2009
-
Risk in ultimate pit selectionBy Edward Holloway
The basis for the selection of the ultimate pit for an open-pit mining operation is generally opaque. Some form of value-based analysis will generally guide the final decision; however, the value will
Jun 1, 2024
-
Maintenance Program: A Void With Penalties Or A Path To EffectivenessBy Paul D. Tomlingson
There are huge benefits for mining operations that have a well-defined maintenance program that is understood and followed across the total operation. But for operations lacking a quality maintenance
Jan 1, 2008
-
Large Diameter Tunnel Boring Machine DevelopmentBy Martin Herrenknecht
The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula
Jan 1, 2010
-
Northeast Interceptor Sewer Case HistoryBy Brett Zernich, Michael Krulc, Brett Robinson
This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade
Jan 1, 2005
-
Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, ColoradoBy F. L. Pirkle
A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta
Jan 1, 2011
-
Challenges Of Conveyors In TunnelingBy Marco Sonnenschein
As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if
Jan 1, 2012
-
Characterization of San Diego’s Stadium Conglomerate for Tunnel DesignBy S. J. Boone, A. Poschmann, C. Pound, A. Pace
San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper
Jan 1, 2001