Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Spillway Dilemma For Mine Tailings Closures

    By T. Clarkin

    This paper presents a hydrologic closure design concept to minimize the risk of water discharges from closed mine tailings facilities. It evaluates the applicability of U.S. Nuclear Regulatory Commiss

    Jan 1, 2012

  • SME
    Development of Cyanide Leaching Processs For Small High Grade Gold and Silver Deposits

    By Michael Harris, David Mosch

    The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing

    Jan 1, 1987

  • SME
    New Developments In Ground Support Technology For Open-Type Tunnel Boring Machines

    By Steve Chorley

    Open-type, or main beam, tunnel boring machines (TBMs) can achieve impressive rates of production. This type of TBM typically outperforms other types of TBMs currently in use around the world. In good

    Jan 1, 2011

  • SME
    Selective Froth Recovery (SFR) System To Increase Flotation Recovery

    The SFR system utilizes a skimmer or extractor placed at or near the slurry-froth interface where there is a higher concentration of valuable mineral particles. With assistance of hydrocyclones, it is

    Jan 1, 2012

  • SME
    Super Cycle: Past, Present And Future

    By Douglas B. Silver

    Traditional cycle theory would postulate that if you have a supply shortage relative to demand, the price will increase because buyers will incrementally increase the price they are willing to pay to

    Jan 1, 2008

  • SME
    Miners Get Defensive At 2012 Northwest Mining Association Meeting

    Smart defense: that?s what the industry needs to play for the next four years, according to panelists at the 118th Annual Meeting of the Northwest Mining Association (NWMA), which met December 2-7 in

    Jan 1, 2013

  • SME
    NATM Strategies In The U.S.?Lessons Learned From The Initial Support Design For The Caldecott 4th Bore

    By Bhaskar B. Thapa

    The design of the Caldecott 4th Bore, located along State Route 24 in Oakland, California, is based on the principles of the New Austrian Tunneling Method (NATM). Typical NATM initial support design p

  • SME
    Increased Prodcution Planned at Anshan Iron and Steel

    The Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon

    Jan 3, 1980

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009

  • SME
    Peruvian Mining Convention Focuses on Sustainable Development

    By William R. Yernberg

    The 26th Peruvian Mining Convention (Convención de Ingeneieros de Minas del Perú) was held Sept. 15 through 19, 2003, in Arequipa. The convention was sponsored by the Peruvian Institute of Mining Engi

    Jan 1, 2004

  • SME
    The value of drilling - A chance-constrained optimization approach

    By Michael Forbes, Rick Jeuken

    The challenge of managing geological uncertainty in mine planning is central to optimizing resource extraction while minimizing risks and costs. This paper introduces a novel approach to coal mine pla

    Jan 1, 2025

  • SME
    Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment

    By Galyn Rippentropp, Finn Erik Overlie

    INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura

    Jan 1, 1987

  • SME
    Comparison of the transverse load capacities of various block ventilation stoppings under arch loading conditions

    By T. M. Barczak

    Stoppings are required to resist lateral forces on the face of the structure to control pressure differentials created by ventilating air. The design criteria in other parts of the world, including Au

    Jan 1, 2009

  • SME
    Risk in ultimate pit selection

    By Edward Holloway

    The basis for the selection of the ultimate pit for an open-pit mining operation is generally opaque. Some form of value-based analysis will generally guide the final decision; however, the value will

    Jun 1, 2024

  • SME
    Maintenance Program: A Void With Penalties Or A Path To Effectiveness

    By Paul D. Tomlingson

    There are huge benefits for mining operations that have a well-defined maintenance program that is understood and followed across the total operation. But for operations lacking a quality maintenance

    Jan 1, 2008

  • SME
    Large Diameter Tunnel Boring Machine Development

    By Martin Herrenknecht

    The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula

    Jan 1, 2010

  • SME
    Northeast Interceptor Sewer Case History

    By Brett Zernich, Michael Krulc, Brett Robinson

    This paper provides an account of the efforts undertaken to construct the Northeast Interceptor Sewer (NEIS) project, which is a portion of a much larger program in Los Angeles, California to upgrade

    Jan 1, 2005

  • SME
    Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, Colorado

    By F. L. Pirkle

    A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta

    Jan 1, 2011

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • SME
    Characterization of San Diego’s Stadium Conglomerate for Tunnel Design

    By S. J. Boone, A. Poschmann, C. Pound, A. Pace

    San Diego’s Stadium Conglomerate consists of poorly cemented cobbles, gravel, sand, silt and clay. Conventional laboratory and in-situ testing is not suitable for characterizing its engineering proper

    Jan 1, 2001