Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Environmental Management of Mineral Exploration and Production

    Environmental and amenity factors have introduced a new dimension to the technical problems of the mining industry in finding, extracting and processing the mineral and energy products on which we

    Jan 1, 1979

  • AUSIMM
    A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)

    By Restarick C. J & Stewart P S B, Kelsall D. P

    Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse

    Jan 1, 1980

  • AUSIMM
    Occurrence of Tellurides at Vatukoula, Fiji

    The Mineragraphic Section of the Council for Scientific and Industrial Research has had occasion from time to time to examine rocks, ores and concentrates from the Yatukoula goldfield, Fiji. The resul

    Jan 1, 1949

  • AUSIMM
    The Sepon Copper Deposits (Laos) and Their Relation to Carlin-like Gold Mineralisation

    By B Davis, M Wallace, J Stewart, C F Burrett, J B. Cannell

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Sepon district in Lao PDR contains 1.8 Mt of JORC (2012) compliant contained Cu resourc

    Mar 18, 2015

  • AUSIMM
    The use of Conditional Simulation for Drill Hole Spacing Evaluation and Decision-Making in Telégrafo Project, Northern Chile

    By O Rojas

    The Telégrafo copper – gold deposit is located in the Centinela district of the Antofagasta region in northern Chile. Telégrafo is a porphyry copper deposit of Eocene – Oligocene age which h

    Aug 22, 2011

  • AUSIMM
    Open the Matrices Wear and Self-Sharpening of Impregnated Diamond Drill Bits

    By Hll J. K, Zhang Y. G

    The wear mechanisms of impregnated diamond drill bit matrices are complex and believed to be the key point in solving drill bit self-sharpening problems. A method has been developed to find the chan

    Jan 1, 1989

  • AUSIMM
    The Relationship Between Mining and Socio-Economic Well-Being in AustraliaÆs Regions

    By R R. J McAllister, K Moffat, S Heyenga

    This paper examines the statistical relationship between quality of life indicators and the gross value of mineral production from Australian regions. We used quality of life indicators, aggregated fo

    Jan 1, 2009

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    Commissioning the Cannington Project ù Creating Success

    By C Torrisi, J Andreatidis, M Duffy

    BHPÆs Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to pro

    Jan 1, 2000

  • AUSIMM
    Findings and Conclusions Following ‘Long-term’ Cover System Monitoring – Refinement of the Conceptual Design for Tailings Storage Facility Closure

    By R Barritt, P Scott, K Albano

    Successful closure of tailings storage facilities (TSFs) is an environmental issue faced globally by metalliferous mines. During the initial feasibility and design phase of the mine life importance is

    Jun 28, 2016

  • AUSIMM
    High ?Magmatic Gold Abundances in Unaltered High-Titanium Ferrobasalts fro the Hermit Islands, Papua New Guinea

    By Till M, McGee WA

    The Hermit Islands are situated at 145¦ E 1 30'S in the Bismarck Sea approximately 200km WNW of Manus Island. They are dominated by basalt flows, one of which yielded a K/Ar isotopic date of 3.4

    Jan 1, 1990

  • AUSIMM
    Commissioning ù The Interface Between Construction and Operations

    This paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing

    Jan 1, 2005

  • AUSIMM
    An Application of Linear Programming for Block Cave Draw Control

    By A von Johannides, G J. van Hout, L F

    In the past various systems have been used to plan the extraction of ore from block cave operations. These systems have varied from rather sophisticated models with empirical ægravity flowÆ rules appl

    Jan 1, 2000

  • AUSIMM
    Simulation Modelling of Mining Systems

    This paper discusses the requirements for a successful simulation modelling study, and the steps involved in the modelling process. Advantages and disadvantages of simulation are described, and a case

    Jan 1, 2000

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • AUSIMM
    Neutralisation and Partial Sulfate Removal of Acid Leachate in a Heavy Minerals Processing Plant With Limestone and Lime

    By B, G Strobos, J P. Maree, N Smit

    In mining and processing operations where minerals, high in pyrite and low in calcite/dolomite are processed, acid is generated, which needs to be neutralised. Ticor at Empangeni in South Africa (SA)

    Jan 1, 2003

  • AUSIMM
    Production Scheduling Using Linear and Integer Programming

    By T GRAHAM-TAYLOR

    A trend towards mining more complex and economically marginal orebodies, often combined with increasingly tight product specifications, increases the number of variables which need to be considered

    Jan 1, 1992

  • AUSIMM
    Research on Recovery of Phosphate Minerals from the Mount Weld Deposit by Froth Flotation

    By Warren L. J

    The recovery of phosphate minerals from the Mt Weld deposit by froth flotation has been studied by many researchers. Most of the flotation experiments were carried out with a tall oil fatty acid as

    Jan 1, 1991

  • AUSIMM
    Iron Ore Genesis and Post-Ore Metasomatism at Mount Tom Price

    About 90 per cent of the pre-mining BIF-hosted iron ore resource of the Hamersley Province of Western Australia is of the Phanerozoic supergene martite-goethite type. The remaining ten per cent formed

    Jan 1, 2002

  • AUSIMM
    Misima Mines milling operation: one of the World's lowest cost conventional gold extraction plants

    Milling operations at Misima Mine are discussed, with specific reference to the application of energy and cost saving concepts. Design stage innovations and post-commissioning developments are covered

    Jan 1, 1994