Abstract
Over a four-hour period of steady plant operation samples were taken  at regular intervals from points within the grinding and flotation circuits.  Size fractions of each composite sample were analysed for lead and zinc  values and a comparison made of the behaviour of the lead, zinc and gangue  minerals, size by size throughout the whole circuit. Analysis of the breakage behaviour using dynamic mathematical models  gave the rates of breakage of each size fraction of each main component.  Simulated grinding experiments showed that the main grinding circuit had  sane reserve capacity. In the lead flotation circuit all lead values between 150 mesh (Tyler) and 5 microns had excellent flotation characteristics, and a  major proportion had a high rate of flotation which was practically the  same for all sizes. Increase in overall lead recovery would require  improvement of the flotation behaviour of ultra-fine lead minerals.  These were slow floating and were responsible for approximately half the  lead losses in the final zinc concentrate and one third of the lead  losses in the final tails.
Citation
APA: (1980) A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)
MLA: A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196). The Australasian Institute of Mining and Metallurgy, 1980.