Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Non-Linear Geostatistics for Geometallurgical Optimisation

    By K G. van den Boogaart, S Konsulke, R Tolosana Delgado

    Adaptive mineral processing has to rely on spatially predicted information on primary geometallurgical parameters, like phase composition, size and shape distributions of grains from various phases, p

    Sep 29, 2013

  • AUSIMM
    The Influence of Physical Parameters on Viscosity Measurement in Dense Media Separation

    By Wills BA, Barley RW

    A brief description of viscosity measuring devices used in Dense Media Separation (DMS) plants is given, including a new On-line viscometer system. The various factors which affect suspension visc

    Jan 1, 1987

  • AUSIMM
    Mining of the Southern 1900 Orebody at Mount Isa

    By Li T

    Mining of the southern 1900 copper Orebody presented a challenge due to the complex geology, geometry and simultaneous extraction of the nearby lead/zinc/silver orebody. An integrated and co-operati

    Jan 1, 1995

  • AUSIMM
    Development of a Coal Seam Water Jet Longhole Drill

    By Just GD, Phillips R

    The application of high pressure water jet technology to the drilling of longholes in coal has resulted in the development of a system currently capable of drilling to lengths greater than 200m. Field

    Jan 1, 1991

  • AUSIMM
    Cyanide Biodetoxification in Spent Ore, Tailings and Process Solutions

    By I R. F MacCulloch, K Jones

    Pintail Systems, Inc, a Colorado USA based company has developed and commercially applied bioremediation processes for biological detoxification of cyanide compounds in mine waste. Site-specific micro

    Jan 1, 2004

  • AUSIMM
    The Broken Hill Lode û Its Geological Structure

    Perhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the

    Jan 1, 1932

  • AUSIMM
    Benefication of chrysotile by wet processing-the resource without the hazard

    By Andrews JRG

    Chrysotile asbestos is a valuable resource. Used as a reinforcement in asbestos cement, products are obtained which are cheap, are not attacked by vermin, do not rot or support growth of fungi and

    Jan 1, 1986

  • AUSIMM
    Dioxin Emissions from Metallurgical Processes and Their Reduction

    The Japanese Government promulgated the æLaw Concerning Special Measures Against DioxinsÆ on 16 July 1999 and it was enforced on 15 January 2000. This is a unique law specialised to protect the enviro

    Jan 1, 2002

  • AUSIMM
    Geology and Mineralogy of the Brolga Laterite Deposit, Central Queensland

    By Rivers CJ

    The Brolga deposit is a Ni-Co enriched laterite, formed over intensly serpentinised peridotites of the Marlborough Block. Basement lithologies at Brolga consist predominantly of serpentinised dunite

    Jan 1, 1996

  • AUSIMM
    The Development and Implementation of a Three Dimensional Model of Blast Fragmentation and Damage

    By Cocker A, Kavetsky A

    A numerical model describing blast fragmentation and damage in three dimensions has been developed at the Julius Kruuschnitt Mineral Research Centre (JKMRC) and applied to numerous blasting operatio

    Jan 1, 1990

  • AUSIMM
    Experiences eith the Electric Overhead Trolley System at the CSA Mine, Cobar

    By Roberts M. L

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Mine Sequencing for High Recovery in Western Australian Mines

    By M P. Sandy

    Some Western Australian underground mines are challenged by very high stress gradients. This environment frequently results in poor induced ground conditions and damaging seismic activity. In some cas

    Jan 1, 2003

  • AUSIMM
    Case Study of Installation of Compact Bucket Wheel Excavators on Ironsands at N.Z. Steel

    By Hogan C. J

    The compact BWE system set up in 1984 to mine ironsand dunes and the underlying ironsand-clay has been an effective high volume produc- tion unit for New Zealand Steel Mining Ltd at the Waikato North

    Jan 1, 1989

  • AUSIMM
    The Batch Phase Disengagement Test

    By Pollard D. M

    In the batch phase disengagement test, an organic and an aqueous phase are mixed together for a known period to produce a dispersion which may be either organic continuous (aqueous phase droplets)

    Jan 1, 1987

  • AUSIMM
    Mine Planning in a Phosphate Deposit

    By Muge F, Pereira H

    In the early stages of the planning of a new exploitation, the error in ore reserve estimation is an important factor that must not be disregarded. As this error can be computed by geostatistical m

    Jan 1, 1977

  • AUSIMM
    High temperature amphiboles in the metamorphic aureole of the Papuan Ophiolite, Papua New Guinea

    A narrow (200-300m) zone of amphibolite facies metamorphic rocks underlies the Papuan ophiolite near the Musa-Kumusi divide, SW of Popondetta, Oro Province. The amphibolite rocks are bounded up-sectio

    Jan 1, 1994

  • AUSIMM
    Sir Henry Ayers, First President of the Institute, and the Burra Burra Mines

    The occurrence of metallic minerals in Australia to the time of the proclamation of South Australia as a Colony in 1836 was unknown. It is, therefore, perhaps, surprising that British settlers arrivin

    Jan 1, 1993

  • AUSIMM
    Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western Australia

    Current problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r

    Jan 1, 1988

  • AUSIMM
    Modelling of Shaft Displacement Due to Nearby Mining - Dome Gold Mine, Canada

    By Mandzic E. H

    The Dome Mine of Timmins Mining company is located in South Porcupine, N.W. Ontario. The orebody being mined partially lies in the No. 3 shaft pillar. Stability analysis has been carried out to est

    Jan 1, 1986

  • AUSIMM
    Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling Equipment

    The process of refurbishment is not a precisely defined one. It is under- stood to mean an upgrading of a plant which is normally performed only once. The application of refurbishment in the field of

    Jan 1, 1989