The Impact of Explosive Performance on Quarry FragmentationBy Cox N
Fragmentation control is perhaps the most critical aspect of quarrying operations, potentially impacting on the costs of all down stream processes, and sometimes even on the economic viability of an
Jan 1, 1995
-
Development in Elevated Temperature Ground of the 500 Orebody Mount Isa MinesBy T Davis
The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si
Jan 1, 2008
-
Precious Metals in the Rosebery North-End Orebody, Tasmania, AustraliaBy Large RR
Precious metals in the Rosebery north-end orebody occur predominantly in sphalerite- galena-pyrite ore and to a lesser extent in massive barite mineralisation. Gold may also occur in the upper part
Jan 1, 1987
-
Pressure Cyanidation of Pyrite ConcentratesBy Rowe P, Rogers D, Warren M
Pressure cyanidation of the minus 10 micron slimes fraction of the Fimiston flotation concentrates for the recovery of gold values has been evaluated as an alternative processing route to the roasti
Jan 1, 1996
-
Water Jet Drilling for Large Diameter Stress Relief Borehole in Cole SeamBy Higuchi K, Sekimoto Y
In this report,the results of the large diameter drilling tests in coal seams assisted with water jet are described. The stress relief in coal seams by this new method is as effective as by the co
Jan 1, 1987
-
Selective Depression in Complex Sulphide FlotationBy Beattie MJV
Widely diverse mechanisms exist for the action of a range of selective sulphide flotation depressants. Collector desorp- tion, leaching, competitive adsorption, formation of hydrophilic reaction-pr
Jan 1, 1984
-
The Depositional Setting of Ohai Coals as Inferred from Coal PetrographyUpper Cretaceous and Eocene coal measures of the Ohai Coalfield are stratigraphically complex, and coal seam geometry and quality are influenced by washouts and partings resulting from accumulation in
Jan 1, 1983
-
Iron Mineralisation Related to the South Ghorveh and Almoughlagh Batholiths, Western IranThe South Ghorveh Batholith (SGB) and the Almoughlagh Batholith (AB) intruded the volcanosedimentary sequence of Songhor Series (Triassic-Jurassic), during the Oligo-Miocene orogenic phase. The granit
Jan 1, 2005
-
The Effects of A Change from Parallel to Series Grinding at Broken Hill SouthBy Weller KR, Restarick CJ, Stewart PSB
Following a detailed assessment of concen trator performance at Broken Hill South Limited which was reported in a previous paper, the fine grinding section was changed from a parallel arrangement o
Jan 1, 1972
-
Testing Rig for Fracture GroutingBy Shuqing L
The application of single liquid cement for fracture grouting in base rock may have history more than 120 years. The disadvantage of it is difficult to increase the grouting efficiency, because the
Jan 1, 1988
-
Developments in Equipment Used for Overburden Removal and Coal Winning in the Brown Coal Industry Part 2 Utilization of Belt ConveyorsOn the 18th November, 19'58, the first coal was delivered to the Morwell Power Station from the adjacent Open Cut using conveyors for the transport of the coal from the working face to the boiler
Jan 1, 1960
-
Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed
Jan 1, 1995
-
Notes on the Delayed Method of Stope Filling at Mount Isa Mines LimitedIntroduction.History of Stope Filling at Mount Isa.The Need for a Systematic Fill Programme.Reasons for Filling.Fill Materials and Tonnages.Rough Mullock Fill.Quantities Readily Available.Fill Pass De
Jan 1, 1953
-
A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)By Restarick C. J & Stewart P S B, Kelsall D. P
Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse
Jan 1, 1980
-
No. 3 Ventilation Shaft: Shaft-Sinking EquipmentWith the sinking of the new No. 3 Shaft and the increasing depth and northward movement of the mining operations, improved ventilation of the mine workings became necessary and it was decided to sink
Jan 1, 1957
-
Contract Mining: Optimising Mining Performance and EfficienciesNew Zealand contract mining has been well established for close to 50 years. The opencast industry has grown from mining quantities of less than 1 million bcm per year in the 1950s to around 20 millio
Jan 1, 1997
-
Computer Modelling Techniques and their Application to mine Evaluation and OperationBy Stokes WPC
The capital requirements to develop a new mining venture are becoming very large; amounts of the order of US$1,000 million are not now unusual among estimates to bring new mining complexes into pr
Jan 1, 1980
-
Understanding the Structural Controls on Arsenic Mineralisation and Ore Distribution at the Miitel Nickel Mine,Widgiemooltha, Western AustraliaBy A W. Bewsher, T C. McCu, D B. Mapleson
The Miitel nickel sulfide deposit has been overprinted by a family of late stage structures that have acted as conduits for fluids that have contaminated the orebody with arsenic minerals. This has re
Jan 1, 2003
-
Geological and Grade Risk at the Golden Gift and Magdala Gold Deposits Stawell, Victoria, AustraliaBy M Stewart, J Vann, A Bu, D Frederickson
The Golden Gift is a recently discovered deep deposit below the main operating areas of the Stawell Gold Mine. At an early stage of the project, diamond drilling was used to define the mineralisation
Jan 1, 2003
-
Estimating the Remaining Fatigue Life of Stockyard MachinesBy S Rice, A Midlin
Many of the stacking and reclaiming machines employed in the mining industry today are operating in ways that were never envisaged in the days before they were commissioned, with greater throughput, i
Jan 1, 2007