Search Documents

Sort by

  • AIME
    Buick Concentrator - A Joint Venture Of: Amax Lead Company Of Missouri - Homestake Lead Company Of Missouri

    By Frank M. Randall

    The Buick mill is located at the site of the old Buick general store, approximately 4 miles south of Bixby, Missouri on route KK. It is a part of the operations in the area now called the "New Lead Be

    Jan 1, 1970

  • SME
    Buick concentrator process control development

    By R. D. Deister

    The Buick concentrator represents state-of-the-art technology in automated digital process control operation utilizing a centralized computer. The process control strategies implemented at Buick are n

    Jan 1, 1987

  • SME
    Buick Concentrator Process Control Development ? Introduction

    By Robert D. Deister

    The Buick Concentrator represents state-of- the-art technology in automated digital process control operation utilizing a centralized computer. The process control strategies implemented at Buick are

    Jan 1, 1985

  • CIM
    Building A Business Case for Acid Prevention

    By T. D. Chatwin

    Acid rock drainage (ARD) is one of the most serious and potentially enduring environmental problems of the mining industry. High liability costs carried by many mining companies to cover potential obl

    Jan 1, 2011

  • TMS
    Building a Cloud-Based Operator Training Simulation Software for Pressure Oxidation Process

    By Mikko Loponen

    Outotec has developed an operator training simulator (OTS) platformsuitable for various hydrometallurgical processes. The complete solution is run in the cloud, where virtual client instances can be m

  • SAIMM
    Building A Database For The Prediction Of Phases In Pt-Based Superalloys

    By L. A. Cornish, S. N. Prins, R. Süss

    The work is being done using the Thermo-CalcTM software, and the database is being built up by obtaining good thermodynamic descriptions of all of the possible phases in the system. The database suppl

    Jan 1, 2006

  • AUSIMM
    Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru

    By R Baumgartner

    The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic

    Sep 5, 2011

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation Data

    By F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz

    A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical

    Sep 29, 2013

  • DFI
    Building A High-Rise Adjacent To Transit Tunnels In San Francisco

    By Lori A. Simpson

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.

  • DFI
    Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)

    By Lori A. Simpson, Linda H. Liang

    A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T

    Jan 1, 2017

  • IIMP
    Building a Stockpile Model for Modeling Gold Grade, Increasing Confidence and Reducing the Risk in Short Term Mine Planning at Akyem Mine

    By Benito Perez

    Newmont Akyem mine in Ghana is committed with continuous improving results. A new environment where the price varies rapidly requires of better understanding of the deposits and the gold contained in

    Sep 1, 2017

  • TMS
    Building a Sustainability Strategy into a Consumer Products Business

    By Leon H. Bruner

    This paper presents a case study describing how a global consumer products company with 138,000 employees that markets over 300 brands in 180 countries is building sustainability into the rhythm of it

    Jan 1, 2010

  • SME
    Building a University and Center For Energy in Sumatra, Indonesia

    By Tony Szwilski

    Indonesia has enormous mineral resources. Its population of more than 180 million people inhabit most of the more than 13,000 islands. The country is becoming a significant economic power in Southeast

    Jan 1, 1991

  • CIM
    Building Aboriginal Relationships to Achieve Project Success

    Presentation Overview ?? Project Setting ? Project Context ? Challenges ?? Managing Commitments ?? Project Update ?? Maximizing Aboriginal Economic Participation in Resource Development P

    May 1, 2004

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • SME
    Building An Industrial Mineral Plant Outside The United States Or Canada - A Case Study In Mexico

    By Joseph P. Nugent

    The new combination gypsum plaster and gypsum wallboard plant of Compania Industrial Kaiser S.A., the first of its kind in Mexico went into production in April of 1969. This was approximately fourteen

    Jan 1, 1969

  • SME
    Building An Intelligent Mining System – Morenci’s Approach

    By J. A. Flinn

    Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y

    Jan 1, 2000

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • SME
    Building and executing an effective risk system for the mining industry

    By Ewan Alexander

    "As human beings, we have managed risk since the dawn of the ages and have been adept at doing so. In order to survive, we hunted or gathered. If we did not take enough risk, we died. If we took much

    Oct 1, 2016