Search Documents

Sort by

  • DFI
    Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled Shafts

    By Alex Ryberg, Matthew L. Becker

    Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to

    Sep 8, 2021

  • SAIMM
    Comparing different methods of sampling to estimate the mineral resource in the Elizabeth Bay aeolian diamond placer

    By J. U. Burger

    The Elizabeth Bay aeolian deposit in Namibia comprises a sedimentary package of diamondiferous grits that have been deposited, reworked and concentrated to various degrees by dominant southerly winds.

    Jan 1, 2009

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • AUSIMM
    Comparing Drilling Patterns for Coal Reserve Assessment

    The criterion for assessing the accuracy of coal reserve estimates proposed by Philip and Watson (1982) is criticized.Following Royle (1977), it is suggested that the global estimation variance found

    Jan 1, 1983

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects

    By R. E. Mitchell

    Environmental Impact Assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible devel

    Jan 1, 2012

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects (dae23bc9-3905-422e-864b-fd90283ea9ed)

    By R. E. Mitchell

    The environmental impact assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible d

    Jan 1, 2012

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits

    Comparing Energy Efficiency of Multi-Pass High Pressure Grinding Roll (HPGR) Circuits With increased emphasis on reducing costs and carbon emissions in mineral processing, it is becoming essential to

    Sep 13, 2010

  • SME
    Comparing Investment Options In A Lignite Deposit Exploitation Project

    The modelling process described in this paper was developed in order to assess the feasibility of various investments options for the exploitation of a lignite deposit located in the Prefecture of Flo

    Jan 1, 2005

  • NIOSH
    Comparing Measurements of Carbon in Diesel Exhaust Aerosols Using the Aethalometer, NIOSH Method 5040, and SMPS

    By Iam Pou Ng

    Combustion aerosols consist mainly of elemental and organic carbon (EC and OC). Since EC strongly absorbs light and thus affects atmospheric visibility and radiation balance, there is great interest i

    Jan 1, 2008

  • IMPC
    Comparing Power Draw Predictions In Experimental Scale Tumbling Mills Using Pept And Dem

    By L. Bbosa

    Positron Emission Particle Tracking (PEPT) and the Discrete Element Method (DEM) are used to investigate Power Draw in a laboratory scale tumbling mill. The mill is run dry in batch mode at different

    Sep 1, 2012

  • CIM
    Comparing Prediction and Measurement of the Quality Index in Sand, Permanent Mould and Investment Castings Poured in A1Si7Mg03 (A356)

    By G. Morin, F. Chiesa, B. Duchesne

    The Quality index is a useful tool allowing to assess the metallurgical quality of aluminium AlSiMg foundry alloys (A356/357). Its value is calculated from the ultimate tensile strength and elongation

    Jan 1, 2006

  • SME
    Comparing Processes For The Resloution Of Environmental Conflict: Intervention, Issues And Timing

    By Gerald W. Cormick

    In a complex society such as ours, the range of "negotiating" relationships is constantly increasing. These negotiating relationships have emerged as a direct result of the diffusion of power or influ

    Jan 1, 1979

  • CIM
    Comparing Refractory Gold Ore Pre-Oxidation Using Mintek's Advanced Leach Facility

    By S. J. van Rensburg

    Competition for resources, including water and arable land, refocused attention on water and gold tailings management with respect to quantity and quality. MINTEK established and validated an "Advance

    Jan 1, 2011

  • SME
    Comparing Robinson And Tintaya

    By K. L. Browne

    After a decade of high copper prices, major mining companies are renewing their interest in purchasing operating properties and/or developing ore bodies. An existing operation carries with it a histor

    Jan 1, 1997

  • SME
    Comparing Simulated And Interpreted Geologic Models

    By M. Rossi

    Geologic ore controls are usually interpreted and modeled from cross sections and plans, as they are critical to construct meaningful and accurate ore reserves models. The geologic boundaries are oft

    Jan 1, 2004

  • CIM
    Comparing Technologies for Sulphate Removal from Mine Waters

    By V. A. Leão, A. M. Silva, S. M. Bertolino, B. C. S. Ferreira, D. Guimarães

    Although not considered a high risk pollutant as compared to toxic metals and acidity, environmental agencies worldwide are proposing regulations to control sulphate in effluents and drainages by sett

    Jan 1, 2014

  • SME
    Comparing the Air Quality inside Enclosed Cabs of Underground Mining Equipment with MERV 16aAnd HEPA Filters

    By J. Noll, J. A. Organiscak, A. B. Cecala

    "In recent years, significant strides have been made to optimize the design of filtration and pressurization systems used on enclosed cabs of mobile mining equipment to reduce respirable dust and othe

    Jan 1, 2016

  • CIM
    Comparing the Behaviour of Modeled Paste in 2D and 3D, using Both Simplified and Complex Stope Geometries

    By Ryan L. Veenstra

    This paper presents a modelling study of a cemented paste backfill in an underground stope. The model was developed to help provide a better understanding of what is happening in the stope during the

    Jun 1, 2012

  • DFI
    Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PR

    By Filippo Maria Leoni, Wesley Schmutzler

    "Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s

    Jan 1, 2015