    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • SME
    Rock Mass Characterization for the WSSC Bi-County Water Tunnel

    By Paul Headland

    The Washington Suburban Sanitary Commission (WSSC) has recently completed design for the Bi-County Water Tunnel Project. The project will include a 10-foot diameter, 5.3-mile long hard rock tunnel loc

    Jan 1, 2008

  • SME
    Recreating a Headwater Stream System on a Head-of-Hollow Fill

    By C. T. Agouridis

    Head-of-hollow fills or valley fills have gained national attention due to increasing environmental concerns, particularly with regards to headwater stream loss. Researchers at the University of Kent

    Jan 1, 2008

  • SME
    Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of Design

    By Jimmy Thompson

    The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const

    Jan 1, 2008

  • SME
    Geotechnical Program At Bridger Coal Company

    By H. Maleki

    Interwest Mining Company has been collecting geologic data within the last decade in preparation for underground mining of extensive coal reserves in its Bridger Coal property in southwestern Wyoming.

    Jan 1, 2008

  • SME
    Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas

    By Greg Wieland

    Deep sewer tunnels are required to meet future growth demands of the City of Austin?s down-town redevelopment. The tunnel is 18,000 ft long and varies in finished diameter from 54 inches to 96 inches.

    Jan 1, 2008

  • SME
    Raw Water Tunnel Condition Assessment

    By Rafael C. Castro

    As part of its risk management plan, the South Central Connecticut Regional Water Authority (RWA) is assessing the condition of its system of raw water conveyance tunnels and connecting pipelines. In

    Jan 1, 2008

  • SME
    High-Sulfidation Submarine Hydrothermal Systems Of The Mariana Arc

    By Robert G. Ditchburn

    The Mariana arc is an ~1,400-km-long intraoceanic arc that marks the southern extension of the Izu-Bonin arc, and is host to 62 ?volcanic centers? of which at least 27 (21 submarine) are hydrothermall

    Jan 1, 2008

  • SME
    Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine Drainage

    By M. Nehdi

    Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati

    Jan 1, 2008

  • SME
    Auxiliary Operations

    By Christopher J. Vise

    Although production operations at mines, representing the extraction and removal of the mined material, often appear to receive the greatest amount of attention, the emphasis given to auxiliary operat

    Jan 1, 2008

  • SME
    Pre-conditioning/Pre-excavation Grouting of the Soils Prior to Tunneling Below Highways and Railways: Case Histories from the Past Decade

    By Alex Naudts

    Pre-excavation grouting is a predictable and reliable technique performed to prevent or minimize settlement in advance of, or during the tunneling operation. It safeguards the infrastructure above the

    Jan 1, 2008

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008

  • SME
    Engineering Geology and Cavern Design for New York City

    By Christopher Snee

    ??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999

    Jan 1, 2008

  • SME
    SIU-Sim: A Novel Coal Preparation Plant Simulator

    Coal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S

    Jan 1, 2008

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    The Debate Over The Impact Of Mining On The Environment And Sustainability In The Local Community

    By G. A. Campbell

    Mining companies have been very interested in the presence of a number of small but high-grade ore bodies of base metals in northern Wisconsin and the west/central section of the Upper Peninsula (UP)

    Jan 1, 2008

  • SME
    The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

    By Faruk Oksuz

    The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a

    Jan 1, 2008

  • SME
    NAT Attendees Get A Glimpse Of The Future Of Underground Space Use

    In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi

    Jan 1, 2008

  • SME
    The Construction of the Manhattan Water Tunnel, New York City ? Introduction

    By Edward (Ted) Dowey

    City Water Tunnel No. 3 is being built in order to provide a redundant system for delivering 4,542,500 m3 (1.2 billion gallons) of water per day throughout the five boroughs of New York City. The pres

    Jan 1, 2008

  • SME
    Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City

    By Dean Workman

    Located in downtown New York City, this project necessitated an innovative conveyor design for successful muck removal. This paper will discuss the technical challenges and engineering solutions of th

    Jan 1, 2008