Evaluation and Construction Effects of a 22-Story Tower on Adjacent Metro Tunnels in Los Angeles - RETC2023
By Stan Tang, Yiming Sun, S. Amir Reza Beyabanaki, N. Sathi Sathialingam
The Kurve mixed-use development project including a 22-story tower at 2801 Sunset Place was constructed on a site consisting of a roughly rectangular-shaped lot at the intersection of Wilshire Bouleva
Jun 13, 2023
-
Fire Damage Assessment of Reinforced Concrete Tunnel Linings - RETC2023
By Negar Elhami Khorasani, Anthony Tessari, Nan Hua
Fire hazards can cause severe and irrecoverable damage to reinforced concrete (RC) tunnel linings, threatening the serviceability and resilience of transportation networks. This paper first examines t
Jun 13, 2023
-
TBM Trailing Sandwich Belt High Angle Conveyor - RETC2023
By Joseph A. Dos Santos
The largest TBM (Tunnel Boring Machine) tunnels are typically along modest slopes, but not always. Occasionally high slope angles are required beyond the capabilities of conventional open trough trail
Jun 13, 2023
-
Milestone Reservoir Quarry Project: Collaborative Design Development Using CMAR - RETC2023
By Savita Schlesinger, Mike Hanna, Nathan Scalla, James O’Shaughnessy, Steve Miller
Loudoun Water’s Quarry A (Milestone Reservoir) project involves conversion of a rock quarry to a billion-gallon raw water reservoir. The project includes a new 40 MGD pump station, deep intake shaft,
Jun 13, 2023
-
-
Planning the Black Creek Tunnel Project - RETC2023
By Cary Hirner, Tony Cicchetti, Daniel G. Cressman, Jeff F. Wallace, Prapan Dave, Malcolm Sheehan
The City of Toronto is currently undertaking the design of the Black Creek Sanitary Trunk Sewer Relief Project. The Project involves the design and construction of approximately 20 kilometers of tunne
Jun 13, 2023
-
Successful Completion of LA Metro Regional Connector Transit Project - RETC2023
By Mike Harrington, Tung Vu
The Regional Connector Transit Project is a 1.9-mile-long underground light rail system that will connect LA Metro’s A (Blue), E (Expo), and L (Gold) Lines in downtown Los Angeles. This $1.75-billion
Jun 13, 2023
-
Excavation and Support of Cross Passages on Westside I - RETC2023
By Peter Dietrich, Joseph DeMello, Norbert Fuegenschuh, Kerwin Hirro, Jeff Brandt, Mike Cole
This paper presents a successful case history of the ground improvement efforts and excavation of twenty-three cross passages between twin bore tunnels driven by EPB tunneling machines in Los Angeles,
Jun 13, 2023
-
Ground Freezing Deep Shaft Excavation Shaft 17B-1 New York City Water Tunnel No. 3 New York, New York - RETC2023
By Andrew Chegwidden, Tara Wilk
Construction of Shaft 17B-1, a part of The New York City water supply system, required an excavation of approximately 38 m (123 ft) through water-bearing overburden soil and more than 152 m (500 ft) o
Jun 13, 2023
-
Gas Extraction and In-Situ Oxidation for TBM Tunneling of the Purple Line Extension, Section 1, Los Angeles - RETC2023
By James Corcoran, Richard McLane, Matt Neuner, Joseph DeMello, Hugh Davies
The Los Angeles County Metropolitan Transportation Authority (LA Metro) Purple Line Extension Section 1 (PLE1) is a $3.12 billion USD design-build, underground heavy rail project, connecting an existi
Jun 13, 2023
-
Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023
By Julia Herhold
The demand for sustainable and profitable/efficient projects within the tunneling and other underground engineering sectors grows rapidly. Construction tasks play a key role within the project conduct
Jun 13, 2023
-
Curved Microtunneling to Reduce Disruption in City Environment - RETC2023
By Allan Rocas, Aswathy Sivaram, Daniel Cressman, Tatiana Chiesa
The City of Toronto plans to construct a 1,350 mm consolidation sewer along the East Don Roadway (EDR). The project includes installation of approximately 260 meter of 1,350 mm diameter concrete press
Jun 13, 2023
-
Applying Automation and Machine Learning for Tunnel Inspections - RETC2023
By Tristan Joubert, Fabio Panella, LiLing Chen, Yung Loo, Michael Devriendt, Nasir Qureshi, Ahmad Ali
Tunnel inspections have traditionally been carried out manually by inspectors writing up observations and taking photos of defects. The results from the inspection and the defects observed are depende
Jun 13, 2023
-
Construction of Coxwell Bypass Tunnel Project in Toronto, ON - RETC2023
By Ehsan Alavi, Eren Kusdogan
The City of Toronto’s Coxwell Bypass Tunnel is currently being constructed by North Tunnel Constructors ULC, a joint venture of Jay Dee Canada, C&M McNally Tunnel Constructors and Michels Canada. This
Jun 13, 2023
-
The Versatility of Tunnelling and Trenchless Methods for Sustainable Grid Construction - RETC2023
By M. Peters, P. Schmäh
The development of renewable energies and a sustainable power grid are the challenges for future energy supply. Underground cables will replace the vulnerable overhead lines, because of their safety b
Jun 13, 2023
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023
By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023
By Jacob L. Mathis, Todd Tharpe, Jonathan Steflik, R. M. True
In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. Durin
Jun 13, 2023
-
Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023
By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere
Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho
Jun 13, 2023
-
Design Aspects of the Minneapolis Central City Parallel Tunnel - RETC2023
By Randall C. Divito, Craig R. Eckdahl, Bruce D. Wagener, Joseph Klejwa
The existing Central City Tunnel was built primarily in the 1930s with a small portion as old as the 1880s. It conveys stormwater in downtown Minneapolis. It is a 4,400-ft long tunnel located 80 feet
Jun 13, 2023
-
Gateway Program—Cut and Cover Tunnels in Manhattan - RETC2023
By Drew Bazil, David Smith, Matteo Ferrucci, David Pittman
The Gateway program will provide additional rail capacity between New Jersey and Manhattan. This paper describes how a 70-foot-deep section of cut and cover tunnel was designed to directly support fut
Jun 13, 2023