Pressure Distribution along the TBM Body in EPB Tunneling
By Ehsan Alavi, Brian Hagan, Glen Frank, Michael A. DiPonio, Michael Mooney, Lisa Mori
"The data from EPB cells located inside the pressurized chamber of EPB TBMs and also the data from the pressure sensors in grout lines are quite important in controlling the EPB operation. However, th
Jan 1, 2016
-
Observed Loading Behavior During Cross Passage Construction - Brisbane Airport Link Project
By John Kuyt, Zili Li, Michael Mooney, Michele Mangione
"INTRODUCTIONTwin bored tunnels are commonly used for a variety of road and tunnel projects throughout the world. A major component of these twin tunnel projects is the construction of connecting cros
Jan 1, 2016
-
Laboratory Test on the Effect of Risk Mitigation Measures against Earthquake for Existing Rock Tunnel
By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata
"Strong earthquakes occur frequently in Japan, and some rock tunnels have sustained severe damages on their permanent lining. Many road tunnels, which were constructed by conventional steel arch suppo
Jan 1, 2016
-
Experimental Study on the Effects of High-Concentrated Loads Exerted by TBM Hydraulic Jacks
By Sandro Moro, Giuseppe Tiberti, Giovanni Plizzari, Antonio Conforti
"During TBM operations, thrust jacks apply high-concentrated forces to the last installed precast segment. These loads generate a disturbed region in the precast segment under the thrust jacks, in whi
Jan 1, 2016
-
Economical Approach to Engineering Fire Durability of Structures
By Sean Cassady, Jason Liu, Sanja Zlatanic, Taehyun Moon, Chris Devery
"For the Hollywood International Airport Runway Expansion Project at Fort Lauderdale, Florida, the structural fire durability analysis was completed for a series of tunnels formed by roadway and railr
Jan 1, 2016
-
DSU TBM for Vishnugad Pipalkoti - TBM Design Development for Large Diameter Rock Tunnels under the High Covers of the Himalaya
By Remo Grandori
"INTRODUCTIONDouble Shield TBMs were introduced in the market in the early seventies with three main targets:• Increase the TBM performances in term of advance per day thanks to the ability to erect a
Jan 1, 2016
-
Metro Rome Line “C”: Artificial Ground Freezing Application for the Underpass of the Existing Metro Station San Giovanni, Line “A” (88718b03-9244-4135-bce5-d10b55d2684f)
By Salvatore Fancello, Ferruccio Cribari, Amerigo Tanzi, Mauro D’Angelo, Massimo Lodico, Alessandro Bertero, Eliano Romani, Tommaso Gondolini, Fabio Giannelli
"The new metro line “C” entails the construction and rehabilitation of 24 stations and 21,5 km of metro line, 13 of which carried out underground; the new metro line will improve the transportation sy
Jan 1, 2016
-
The Brenner Base Tunnel
By Michael Rehbock-Sander, Romed Insam
"INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun
Jan 1, 2016
-
Use of Numerical Modelling and GIS to Analyse and Share the Risks Related to Urban Tunnelling - Greater Paris - Red Line – South Section
By Fatima-Zahra Houmymid, Elena Chiriotti, Mahdi, Samy
"The Greater Paris projects involves the creation of a 200km extension of the actual public transport network on the close outskirt of Paris. In 2011, SYSTRA has been awarded the Engineering studies o
Jan 1, 2016
-
Unexpected Post-Excavation Damage to a 28"-Thick Segment Lining - Failure Mechanism and Rehabilitation Measures
By Jens Classen, Martino Gatti
"GENERAL PROJECT DATAThe Sparvo Tunnel is part of the “Variante di Valico” project, a new 65km (40mi) highway link between Bologna and Florence, designed to renew the existing A1 route which connects
Jan 1, 2016
-
The Widening of the “Montedomini” A14 Motorway Tunnel in the Presence of Traffic
By Saverio Agresti, Giuseppe Lunardi, Donato Basta, Roberto Trapasso
"At a distance of 10 years from the first application of the Nazzano Method, the widening under traffic of a tube of an existing motorway tunnel was realized near Ancona, along the A14 Motorway in Ita
Jan 1, 2016
-
The 3D Geological Model of the Karavanke Tunnel, Using Leapfrog Geo
By Tina Živec, Žibertm Marko
"Civil design has changed in many ways using BIM (Building Information Modelling) technology in its most recent form. Such a technological breakthrough has not been successful so far in traditional or
Jan 1, 2016
-
"Key Technologies of Large RectangularPipe Jacking Machine"
By Lianhui Jia, Yali Han
"The key technologies of a large rectangular pipe jacking machine with dimensions of 10.12m × 7.27m (width x height) include selection of rectangular cross-section cutting modes, analysis on the stren
Jan 1, 2016
-
ACI Guideline on Design and Construction of Precast Concrete Tunnel Segmental Lining
By Verya Nasri, Mehdi Bakhshi
"Fiber reinforcement has emerged as an alternative to steel bars in precast concrete segments due to advantages such as saving cost and reducing production time while developing a more robust product
Jan 1, 2016
-
Recursive Refinement of Geotechnical Design for Copenhagen Cityring Metro
By Georgios Kafantaris, Carsten Bonde, Nataša Katic
Within the investigation works for the Copenhagen Cityring metro, Geo/CMT have carried out 90 geotechnical boreholes. Together with the previously available investigation, this resulted in more than
Jan 1, 2016
-
Ground Freezing for Construction at the Port of Miami Tunnel
By Roger Storry, Arnaud Hochart, David Harris, Olivier Martin
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
Ground Freezing to Repair Leaks in a Slurry Wall Shaft
By Shawn P. Coughlin, Michael A. Schimmenti, Juan Leonardo Tello del Pino
"PROJECT OVERVIEWThe Sistema de Potabilización Área Norte project (Northern Area Purification System) was a major expansion of the potable water system in Buenos Aires Province, Argentina. The aim of
Jan 1, 2016
-
Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated Works
By Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson
"PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)
Jan 1, 2016
-
Effects of Tunnel Excavation on Historical Buildings by a Fully Coupled Soil-Structure Interaction 3D Analysis - A Case Study From Copenhagen “Cityringen” Metro Line
By Luisa Alfieri, Giorgio Fantauzzi, Sergio Notarianni, Spencer Cavagnet, Alessandro Damiani
"The new tunnels of the Copenhagen ""Cityringen"" will be excavated, at Kongens Nytorv square, crossing over the existing M1 and M2 metro lines. After the crossing, the tunnels will underpass the hist
Jan 1, 2016
-
Evaluation of Settlement Monitoring Over 6.75 Miles of Tunneling - Updating Prediction Methods and Designing Better Monitoring Programs
By Lynn Salvati, Colin LaVassar, Loic Galisson, Joel Theodore, Lynette Sla
"Sound Transit’s University Link and Northgate Link projects will add 6.75 miles (10.9 km) of twin-bored tunnel to Seattle’s light rail system, extending the route north from downtown Seattle. The tun
Jan 1, 2016