    Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel

    By Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay

    "Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are

    Jan 1, 2016

  • SME
    Reliability of Swelling Pressure Testing for Tunnel Support Evaluation

    By Bjørn Nilsen

    "INTRODUCTION/BACKGROUND Weakness zones or faults containing clay-rich gouge represent one of the most challenging rock mass conditions to be encountered during tunneling. In Norway, such conditions c

    Jan 1, 2016

  • SME
    A Breakthrough in the Mining Sector: Pre-Concentration by Automatic Sorting

    By C. Sampaio, C. Petter, M. Veras

    "INTRODUCTION Use of sensor technology applied to the gravimetric beneficiation is intended for the selective preconcentration or separation of various minerals. Sensor Based Sorting (SBS) uses sensor

    Jan 1, 2016

  • SME
    Underpinning and Instrumentation—Temporary Structures for Critical Solutions

    By Jon “Ike” Isaacson, Frank Perrone, Eric Prantil

    "Tunneling through an urban environment carries many inherent risks to the immediate local infrastructure and subsequently to the project stakeholders. On the CQ031 Contract of the East Side Access Pr

    Jan 1, 2016

  • SME
    Istanbul Strait Road Tunnel Project – From Concept to Operation

    By Basar Arioglu, Mustafa Tanriverdi, Seok Jae Seo

    "INTRODUCTION Istanbul is a unique megalopolis connecting two continents. Population growth and economic development require permanent solutions and continuous investments on the transportation infras

    Jan 1, 2016

  • SME
    TBM Technology for an Australian Coal Drift: The Grosvenor Project

    By Robert Marks, Enrico Dal Negro, Richard Schulkins

    "In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th

    Jan 1, 2016

  • SME
    Crack Width Reduction in Reinforced Concrete Members Using Barchip Macro-Synthetic Fibers

    By Erik S. Bernard

    "INTRODUCTION Conventional steel bar reinforcement is used in many tunnel linings to provide high flexural and tensile load resistance. These Reinforced Concrete (RC) tunnel linings may suffer flexura

    Jan 1, 2016

  • SME
    Quality Management System on Sound Transit Underground Construction Projects

    By Jim Salley, Mohammad Saleem, Indra Banerjee, Kevin Sapp

    "On underground construction projects, effective Quality Management is essential for ensuring facility durability, life cycle performance and low maintainability. Furthermore, follow on contracts also

    Jan 1, 2016

  • SME
    The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction Phase

    By John Greenhalgh, Benoit De Rivaz

    "1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro

    Jan 1, 2016

  • SME
    Development and Testing of an Advanced Cryogenic Breathing Apparatus for Mine Escape

    By D. F. Doerr, E. Blalock, D. R. Bush, K. D. Cohen

    "INTRODUCTION The design, development, fabrication, and test of cryogenic breathing apparatus is part of a much larger effort funded by the National Institute for Occupational Safety and Health (NIOSH

    Jan 1, 2016

  • SME
    The “Big Picture” Approach to Surface Mining

    By L. Widdifield, R. Riggle

    "In today’s challenging mining environment the “Big Picture” (Caterpillar, 2013) approach to mining is often neglected. With haulage costs approaching up to 45 % of the overall mining costs, all too o

    Jan 1, 2016

  • SME
    CFD Modeling of a Novel Wet Scrubber for Capture of Respirable Dust in an Underground Coal Mine

    "Controlling dust generation and keeping it below permissible limits at the working face of a room and pillar mine is a challenge for mine operators. With the recent changes in the respirable-dust reg

    Jan 1, 2016

  • SME
    Innovative Support of Cross-Passage Openings in Segmented Liner

    By Karel Rössler, Petr Vítek

    "The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi

    Jan 1, 2016

  • SME
    Preparing the Next Generation of Operators for Advances in Leaching

    By Z. Sample

    "INTRODUCTION This past year commodity prices continued their dip with increased volatility causing market values to slide another 16% putting increased pressure on even the largest companies to impro

    Jan 1, 2016

  • SME
    Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFD

    By A. Jolly, A. R. Kumar, T. Novak

    "Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und

    Jan 1, 2016

  • SME
    Examination of Copper Electrowinning Smoothing Agents. Part IV: Nucleation and Growth of Copper on Stainless Steel

    By C. Heckman, M. S. Moats, A. Luyima, W. Cui

    "Nucleation and growth of copper on 316L stainless steel from synthetic acidified copper sulfate was studied in the absence and presence of chloride ions and/or organic additives – HydroStar® 4208, DX

    Jan 1, 2016

  • SME
    Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel

    "The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an

    Jan 1, 2016

  • SME
    Adaption of Protective Linings for Sewer Tunnels to Project Needs

    By Gilles Recher, Jörg Riechers, Albert Lueghamer

    "INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c

    Jan 1, 2016

  • SME
    Analysis of Heat Loss Mechanisms for Mobile Tent-Type Refuge Alternatives

    By P. T. Bissert, L. Yan, M. D. Klein

    "Federal regulations require that refuge alternatives (RAs) are located within 305-m (1000-ft) of the working face and spaced at one-hour travel distances in the outby area in underground coal mines i

    Jan 1, 2016

  • SME
    Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions

    By Ergin Arioglu, Werner Burger

    "SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp

    Jan 1, 2016