Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation
By J. Kang
To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium
Jan 1, 2008
-
California High Speed Rail: Driving the Next Level in Dynamic Tunnel Design - Project Description
By Carrie Pourvahidi
The California High Speed Rail Authority (Authority) was created by the State of California through legislation in 1996. The purpose of the Authority is to plan, construct, finance and operate a state
Jan 1, 2008
-
Failure Risk Assessment For The Romanian Uranium Mining Waste Dumps
By St. E. Deák
Mining activities involve excavation from underground to the surface of large quantities of ore (e.g. uranium and its disintegration products) (Dumitrescu, 2002, 2007). Material with limited content
Jan 1, 2008
-
Caldecott Improvement Project
By William W. Edgerton
The California Department of Transportation (Caltrans), the Contra Costa Transportation Authority (CCTA), and the Alameda County Congestion Management Agency (Alameda CMA) are involved in a unique par
Jan 1, 2008
-
Shaft Sinking at the Seymour?Capilano Filtration Plant
By Andreas Prucker
The Greater Vancouver Water District (GVWD) is currently constructing the largest water treatment plant in Canada. As part of this treatment scheme twin water transfer tunnels are being constructed. W
Jan 1, 2008
-
Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station
By Klaus Rieker
The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil
Jan 1, 2008
-
Final Tunnel Liner At The Mill Creek 3 Project
By M. Schafer
The 6-m- (20-ft-) diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT3) has been completed. This article summarizes aspects of liner design and ad-dresses the construction a
Jan 1, 2008
-
A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects
By Lei Fu
In the wake of the collapse of the ceiling panels in the I-90 section of the Central Artery/Tunnel (CA/T) Project in 2006, the long term performance of tunnels became the focus of the tunneling indust
Jan 1, 2008
-
Allegheny River Tunnel Crossing Project
By Paul A. Roy
The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narro
Jan 1, 2008
-
Alternative Contracting Methods?An Update
By John Reilly
The author?s paper at RETC 2007, ?Alternative Contracting Methods? addressed strengths and weaknesses of DBB+DB and introduced Construction Manager/General Contractor (Portland model) and Alliancing (
Jan 1, 2008
-
Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner
By John Rudolf
Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen
Jan 1, 2008
-
The Current State of Disc Cutter Design and Development Directions
By Joe Roby
Rolling disc cutters are the business end of hard rock and mixed face tunnel boring machines (TBMs). Since their first successful employment on a TBM over fifty years ago, disc cutter technology has c
Jan 1, 2008
-
Devil?s Slide Tunnels - Unique Challenges
By Y. Nien Wang
The Devil?s Slide portion of Highway 1 between Pacifica and Montara is often closed due to the instability of the adjacent slopes. Following many years of public input and careful evaluation of altern
Jan 1, 2008
-
The Fallacy of Tunnel Formwork Removal
By Wern-ping (Nick) Chen
In concrete lined tunnels, formwork removal timing may be controversial. Contractors seek to strip the form as soon as possible, and designers seek to keep the formwork in place as long as practical t
Jan 1, 2008
-
Renewables: An Inconvenient Energy Reality
By L. Alan Weakly
Global warming is a political reality in the United States today. The actual impact of the continued utilization of fossil fuels is not known and is open to debate. However, the growing concern abou
Jan 1, 2008
-
Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.
By Seal. Thom
Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest
Jan 1, 2008
-
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor
By Samuel J. Gambino
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p
Jan 1, 2008
-
Overview of NFPA 502 Standard for Road Tunnels, Bridges and Other Limited Access Highways, 2008 Edition
By William Connell
NFPA 502, Standard for Road Tunnels, Bridges and Other Limited Access Highways establishes minimum fire protection and fire life safety requirements for road tunnels, bridges and other roadways where
Jan 1, 2008
-
Mine Development
By Mike Tracy
This section of the Handbook deals with general principles to be evaluated in the development of a mining operation. It addresses the major issues that must be examined to fully evaluate a mining vent
Jan 1, 2008
-
Jet Grout Ground Modifications for the Brightwater Conveyance System
By Richard Hanke
Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,
Jan 1, 2008