Double Disc Cutter Consumption of an EPB TBM in Tuzla Wastewater Tunnel
By Utku Gumus, Ertan Bostanci, Hanifi Copur, Ahmet Rüfai Bilgin, Ugur Altay
"Field observations on replacements of 12-inch constant cross-section double disc cutters in Tuzla Wastewater Tunnel excavated by an EPB TBM with 3.151 mm excavation diameter excavating hard rock are
Jan 1, 2016
-
Reliability of Swelling Pressure Testing for Tunnel Support Evaluation
By Bjørn Nilsen
"INTRODUCTION/BACKGROUND Weakness zones or faults containing clay-rich gouge represent one of the most challenging rock mass conditions to be encountered during tunneling. In Norway, such conditions c
Jan 1, 2016
-
A Breakthrough in the Mining Sector: Pre-Concentration by Automatic Sorting
By C. Sampaio, C. Petter, M. Veras
"INTRODUCTION Use of sensor technology applied to the gravimetric beneficiation is intended for the selective preconcentration or separation of various minerals. Sensor Based Sorting (SBS) uses sensor
Jan 1, 2016
-
Underpinning and Instrumentation—Temporary Structures for Critical Solutions
By Jon “Ike” Isaacson, Frank Perrone, Eric Prantil
"Tunneling through an urban environment carries many inherent risks to the immediate local infrastructure and subsequently to the project stakeholders. On the CQ031 Contract of the East Side Access Pr
Jan 1, 2016
-
Istanbul Strait Road Tunnel Project – From Concept to Operation
By Basar Arioglu, Mustafa Tanriverdi, Seok Jae Seo
"INTRODUCTION Istanbul is a unique megalopolis connecting two continents. Population growth and economic development require permanent solutions and continuous investments on the transportation infras
Jan 1, 2016
-
TBM Technology for an Australian Coal Drift: The Grosvenor Project
By Robert Marks, Enrico Dal Negro, Richard Schulkins
"In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th
Jan 1, 2016
-
Crack Width Reduction in Reinforced Concrete Members Using Barchip Macro-Synthetic Fibers
By Erik S. Bernard
"INTRODUCTION Conventional steel bar reinforcement is used in many tunnel linings to provide high flexural and tensile load resistance. These Reinforced Concrete (RC) tunnel linings may suffer flexura
Jan 1, 2016
-
Quality Management System on Sound Transit Underground Construction Projects
By Jim Salley, Mohammad Saleem, Indra Banerjee, Kevin Sapp
"On underground construction projects, effective Quality Management is essential for ensuring facility durability, life cycle performance and low maintainability. Furthermore, follow on contracts also
Jan 1, 2016
-
The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction Phase
By John Greenhalgh, Benoit De Rivaz
"1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro
Jan 1, 2016
-
Development and Testing of an Advanced Cryogenic Breathing Apparatus for Mine Escape
By D. F. Doerr, E. Blalock, D. R. Bush, K. D. Cohen
"INTRODUCTION The design, development, fabrication, and test of cryogenic breathing apparatus is part of a much larger effort funded by the National Institute for Occupational Safety and Health (NIOSH
Jan 1, 2016
-
The “Big Picture” Approach to Surface Mining
By L. Widdifield, R. Riggle
"In today’s challenging mining environment the “Big Picture” (Caterpillar, 2013) approach to mining is often neglected. With haulage costs approaching up to 45 % of the overall mining costs, all too o
Jan 1, 2016
-
CFD Modeling of a Novel Wet Scrubber for Capture of Respirable Dust in an Underground Coal Mine
"Controlling dust generation and keeping it below permissible limits at the working face of a room and pillar mine is a challenge for mine operators. With the recent changes in the respirable-dust reg
Jan 1, 2016
-
Innovative Support of Cross-Passage Openings in Segmented Liner
By Karel Rössler, Petr Vítek
"The Ejpovice tunnels in Czech Republic were built by EPBM in soft Clyashale, and in weathered profile with low soil overburden. The segmented liner at the cross-passage openings required support, whi
Jan 1, 2016
-
Preparing the Next Generation of Operators for Advances in Leaching
By Z. Sample
"INTRODUCTION This past year commodity prices continued their dip with increased volatility causing market values to slide another 16% putting increased pressure on even the largest companies to impro
Jan 1, 2016
-
Modeling Capture Efficiency for a Flooded Bed Dust Scrubber Incorporated into a Longwall Shearer using a Small Scale Physical Model and CFD
By A. Jolly, A. R. Kumar, T. Novak
"Coal dust in an underground mining environment has always been a health and safety issue, especially with longwall faces. Efforts to integrate a flooded bed scrubber within a longwall shearer are und
Jan 1, 2016
-
Examination of Copper Electrowinning Smoothing Agents. Part IV: Nucleation and Growth of Copper on Stainless Steel
By C. Heckman, M. S. Moats, A. Luyima, W. Cui
"Nucleation and growth of copper on 316L stainless steel from synthetic acidified copper sulfate was studied in the absence and presence of chloride ions and/or organic additives – HydroStar® 4208, DX
Jan 1, 2016
-
Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel
"The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an
Jan 1, 2016
-
Adaption of Protective Linings for Sewer Tunnels to Project Needs
By Gilles Recher, Jörg Riechers, Albert Lueghamer
"INTRODUCTIONIn view of a global trend towards urbanization, more and more trunk sewers and combined sewer overflow tunnels (CSO) with medium to large diameters and the corresponding link sewers are c
Jan 1, 2016
-
Analysis of Heat Loss Mechanisms for Mobile Tent-Type Refuge Alternatives
By P. T. Bissert, L. Yan, M. D. Klein
"Federal regulations require that refuge alternatives (RAs) are located within 305-m (1000-ft) of the working face and spaced at one-hour travel distances in the outby area in underground coal mines i
Jan 1, 2016
-
Istanbul Strait Road Crossing Tunnel - Project Challenges and TBM Solutions
By Ergin Arioglu, Werner Burger
"SUMMARY The Istanbul Strait Road Crossing Project includes a 3.34 kilometer subsea tunnel excavated by TBM with an excavation diameter of 13.71 m. The tunnel will incorporate two road decks, each emp
Jan 1, 2016