Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Aspects of CSO Tunnel and Pump Station Systems
By Verya Nasri, James Sullivan, Alex Varas
"INTRODUCTION Many major cities in the United States have a combined storm water and sanitary sewer network. Regular rainfall overwhelms the system capacity and results in millions of cubic meters of
Jan 1, 2016
-
Design and Construction Aspects of Pneumatically Applied Concrete Final Tunnel Linings - Recent Experience at the East Side Access (ESA) Project in New York
By Alfredo Valdivia, Jesus Schabib, Vojtech Gall, William Cao, Curt Cicileo, Andrew J. Thompson
"The East Side Access Project (ESA) involves the construction of geometrically complex underground structures including a large number of caverns and bifurcations. Initially conceived as dual lined st
Jan 1, 2016
-
Design And Construction Challenges At The Gualcamayo Mine
By N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese
Jan 1, 2011
-
Design And Construction Challenges At The Gualcamayo Mine ? Introduction
By N. Ward
The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re
Jan 1, 2011
-
Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024
By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor
The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage
Jun 23, 2024
-
Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021
By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray
The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und
Jun 13, 2021
-
Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022
By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck
Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti
Dec 1, 2022
-
Design and Construction Challenges for the North Temple Tunnel - NAT2022
By Todd Kilduff, Michael Tinney
The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En
Dec 1, 2022
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel
By Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021
By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023
By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland
By Keith Jones, Martin Knights, Timothy Watson
In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a
Jan 1, 2003
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur Mine
By C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By J. F. Able, F. Djahanguiri
The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m
Jan 1, 1998
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv
Jan 1, 1995
-
Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope
By F. Djahanguiri
The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would
Jan 1, 1997
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021
By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground
By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna
This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los
Jan 1, 2003
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project
By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Design And Construction Of A New Mine - The Design Of Mimosa #2 Mine ? Introduction
By Ulises Deveze T.
The coal company Minerales Monclova, S.A. (MIMOSA), the owner of the Mimosa R Line, is a subsidiary company of Altos Hornos de Mexico, S.A., the largest steel plant in Mexico with an annual capacity o
Jan 1, 1974