Crusher for critical size material at Los Bronces semiautogenous grinding plant, Chile
By O. Fernandez, M. Vesely
Abrasive grinding, leading to ultrafine product and "critical size" material buildup inside the mill, is proposed as the cause of high power consumption and low capacity in many fully autogenous grind
Jan 1, 1987
-
Crusher Vision Automation System: Closed Side Setting Measurement and Mainshaft Installation
By T. Shumka, M. J. Druckenmiller
"INTRODUCTION As we push further into the 21st century and closer to a more efficient mine, safety and operational enhancements are the two major keys towards attaining success. The Crusher Vision Aut
Jan 1, 2015
-
-
Crushing & Grinding - Autogenous Mill Curved Pulp Dischargers - Experience At Pickands Mather Operations, Primary Milling Iron Ore
By A. M. McKim
6, 7.3 meter diameter autogenous mills at Wabush Mines are undergoing conversion from a radial configuration of pulp discharger to a curved design. Improved discharging efficiency has effectively lowe
Jan 1, 1982
-
Crushing & Grinding Controls In The Iron Ore Industry
By W. F. McDermott
The Iron Ore Industry has perhaps seen more varied and drastic changes in its approach to crushing and grinding in the last 5 years than any of the other mineral industries, Multimillion ton per year
Jan 1, 1970
-
Crushing -The Headache of the Small Miner
By S. J. Chadwick
The majority of small gold plants constructed around Western Australia were designed for short lives and treatment of oxide ores. The crushing plant frequently bore the brunt of capital cost savings r
Jan 1, 1991
-
Crushing and grinding at Amax's Sleeper gold mine
By J. J. DeMull, B. A. Boster
Amax's Sleeper mine uses conventional cyanidation milling and heap leaching techniques to produce gold. Since milling operations commenced in March 1986, average ore processing rates have improve
Jan 1, 1990
-
Crushing And Grinding At AMAX's Sleeper Mine
By T. J. DeMull
AMAX's Sleeper Mine uses conventional cyanidation milling and heap leaching techniques to produce gold. Since milling operations commenced in March 1986, average ore processing rates have improve
Jan 1, 1988
-
Crushing and grinding at Bond Gold’s Colosseum mine : An update
By R. L. Beatty
Bond International Gold's Colosseum gold mine was discovered in 1865. No recorded production occurred, however, until the 1930s, with production of about 19 kg (615 oz) of gold. The mine was clos
Jan 1, 1989
-
Crushing And Grinding At The New Sar Cheshmeh Concentrator In Iran ? Foreword
By Larry S. Diaz
It is felt that prior to the presentation of the technical portion of this paper, some general information would be of interest. The Sar Cheshmeh Copper Mining Company was founded by the Iranian G
Jan 1, 1976
-
Crushing and Grinding Circuit Availability: Why Is It Important in Design, and How Can We Increase It Cost-Effectively? - SME Annual Meeting 2025
By Phil Dakin, Rajiv Chandramohan, John Lo Grande, Greg Lane
Crushing and grinding circuit availability is a critical design factor defining the installed equipment selection and the process buffers required to maintain throughput during maintenance. The commin
Feb 1, 2025
-
Crushing And Grinding Practice In Sweden (PRIPRINT 68 - B - 329)
By B. Fagerberg
Crushing and grinding practice in Sweden follows largely the international pattern. Certain special circumstances, however, have had an influence on the development. Most mines are worked underground
Jan 1, 1968
-
Crushing Control At Kennecotts?s Ray Mines Division - Introduction
By Scott A. Norby
Kennecott's Ray Mines Division (RMD) is located in central Arizona. The pit and silicate plants are located at Ray while the 27,500 tpd concentrating facilities are located at Hayden, approximate
Jan 1, 1986
-
Crushing Grinding And Concentrating At Mount Wright
By David Runnels
In September 1970, the Quebec Cartier Mining Company, started development of the Mount; Fright iron ore mine. The estimated ore reserve is in excess of 1,000,000,000 long tons with an average grade of
Jan 1, 1977
-
Crushing In The Aggregate Industry
By I. L. Jennings
In most industrialized countries, the largest element of the mining industry in physical volume is that devoted to the extraction and processing of materials for use as construction aggregates. Requir
Jan 1, 1968
-
Crushing In The Pit - Ore Fracture and Transportation
By S. D. Michaelson
Open pits and quarries are the major sources of all "hard rock" tonnage mined today. Normally, ore is fractured from the pit face by blasting and then truck-hauled to a primary crusher where processin
Jan 1, 1968
-
Crushing Practice At Reserve Mining Company
By A. S. Henderson
Eastern Mesabi taconite is one of the hardest rocks known, but fortunately it shows little tendency to pack in the crushers, when the minus 5/16 inch material is removed. The crushing circuit is essen
Jan 1, 1959
-
Cryogenic Air A Potential Solution 'Io The Problem Of Respirable Mine Dust
By L. K. Eigenbrod
Throughout the mining industry, pneumoconiosis is one of the most severe occupational health problems being faced. The goal of completely eliminating pneumoconiosis as an occupational health hazard wa
Jan 1, 1971
-
Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration
By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer
Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph
-
Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer
By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer
Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph