Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Construction Of The Pacheco Pumping Chamber And Shafts

    By Russell Clough

    The Pacheco Pumping Plant is situated on the west end of San Luis Reservoir in western Merced County, California. It is designed to draw water from the reservoir and pump it into a 3,500,000 gallon re

    Jan 1, 1985

  • SME
    Construction of the Pergau Hydroelectric Power Project, Malaysia

    By Patrick J. Doig

    In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,

    Jan 1, 2001

  • SME
    Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021

    By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli

    The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a

    Jun 13, 2021

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Construction of the South Bay Ocean Outfall

    By Michael Jatczak, Brett Robinson

    The South Bay Ocean Outfall tunnel is located at the U.S./Mexico Border and is one link in a system designed to treat and dispose of raw sewage entering the Tijuana River Valley from Mexico. The 11 fi

    Jan 1, 1999

  • SME
    Construction Of The South Interceptor Montreal, Quebec, Canada

    By Jacques Mongrain, Serge Barbeau, Gary Brierley

    The Communaute Urbaine de Montreal is currently involved in construction of the South Interceptor which consists of 53 kilometers (33 miles) of 1,800 mm (6.0 ft) to 5,400 mm (18.0 ft) diameter tunnels

    Jan 1, 1987

  • SME
    Construction of the SR-99 recovery shaft

    By Lance Rasband, Richard Hanke, John Starcevich

    "Mining on Seattle’s SR99 tunnel began in July of 2013. Initial mining progressed slowly through a 4.5 m (14.9-ft) thick fiber-reinforced concrete headwall before immediately entering the first of thr

    Jun 1, 2016

  • SME
    Construction of the SR-99 TBM Recovery Shaft

    By Lance Rasband, Richard Hanke, John Starcevich

    "The world’s largest tunnel boring machine (TBM), at the time of her launch in 2012, the TBM locally referred to as “Bertha,” is incapacitated due to mechanical failure. Bertha’s stoppage places her 2

    Jan 1, 2016

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Construction of the Wolf Creek Upper Narrows Tunnel Waterproof Membrane—A Comparison of Tunnel Projects Utilizing the Application of Spray-on Waterproof Membrane

    By L. L. Lacerda, A. J. Blair

    The Wolf Creek Upper Narrows Tunnel (Upper Narrows Tunnel) is one of the first major highway tunnel in the United States implementing the use of spray-on membrane for purposes of constructing a double

    Jan 1, 2005

  • SME
    Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

    By P. Marcheselli, Jean-Yves Peron

    A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac

    Jan 1, 1995

  • SME
    Construction Of Tunnels In Methane Environments

    By Barry R. Doyle, James P. Rose, Marius P. Gronbeck

    This paper presents a strategy for addressing the hazards of construction of tunnels in ground containing methane. A discussion of the nature of methane includes occurrence underground, and manner of

    Jan 1, 1991

  • SME
    Construction Phase Services for Australian and North American SEM Tunneling - NAT2024

    By Yun Bai, Sarah Wilson, Michael Salcher, Mark Trim

    Over the last decade more than 62 miles (100 km) of civil transport tunnels were constructed in Sydney, Australia, using the sequential excavation method (SEM). The WestConnex motorway tunnels, each s

    Jun 23, 2024

  • SME
    Construction Problems In Cold Weather

    By G. M. Ellis

    This paper deals with some aspects of concrete construction in remote locations and/or cold climates. The writer's experience covers 25 years in construction in western and Central Canada. I will

    Jan 1, 1971

  • SME
    Construction Procedures And Equipment For Drop Shafts Metropolitan Sanitary District Of Greater Chicago

    By Joseph Lynch, John DiPonio

    This report refers to the Chicago Deep Tunnel Contract 13A, which was the first contract let in the City of Chicago requiring the construction of deep drop shafts for the transportation of high level

    Jan 1, 1997

  • SME
    Construction Progress of the Ottawa LRT Line - From Early Design Stages to Current Construction Milestones

    By Franz Wilhelmstoetter, Christian Karner

    "The Confederation Line is phase one of Ottawa’s light rail transit, which consists of 13 stops and stations. The project’s center piece is a 2.5 kilometer (1.6 miles) long tunnel with three undergrou

    Jan 1, 2016

  • SME
    Construction Project Management

    By Scott G. Britton

    Many times during the construction of a project, whether large or small, the engineer will become involved with management of the work and workforce. In some cases, mine management will turn over the

    Jan 1, 1983

  • SME
    Construction Related Markets For Silica Sand

    By M. J. Zdunczyk

    Sand is one of the most common materials on the earth’s surface. It is a naturally occurring material resulting from the physical and chemical breakdown of rocks. The definition of sand varies, as d

    Jan 1, 2001