Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Prediction of hydrocyclone performance using artificial neural networks - Synopsis
By M. Karimi
Artificial neural networks (ANNs) have found their applications in the modelling of unit operations of mineral processing plants. In this research, laboratory-scale tests were conducted, using a three
Jan 1, 2010
-
Processing researchers continue efforts to streamline US mining
By P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
The Flotation Capacity Project to Increase the Recovery in the Mount Isa Mines Copper Concentrator
By D R. Carr
The installation of the Flotation Capacity Project flow sheet in the copper concentrator at Mount Isa Mines Limited has recently been completed. The project involved increasing the flotation capacity
Jan 1, 2003
-
Reservoir Engineering – General - Pulsed Nuclear Magnetic Resonance Studies of Porosity, Movable Fluid and Permeability of Sandstones
By A. Timur
Fluid flow properties of porous media have long been of interest in such varied disciplines as geology, geophysics, soil mechanics, and chemical, civil, and mechanical engineering. This interest has r
Jan 1, 1970
-
1D Numerical Simulation of Velocity Amplification of P-Waves Travelling Through Fractured Rock Near a Free Surface
By G. Swan, E. Nordlund, P. Zhang
"SynopsisThe most widely used support design damage criterion for rockburst-prone mines is based upon kinetic energy, which is proportional to the square of the ejection velocity and is commonly expre
Jan 1, 2015
-
Laboratory Assessment Of Rock Fragmentation Process By Continuous Miners – Preprint 97-172
By V. B. Achanti, A. W. Khair
Laboratory studies were carried out at West Virginia University to investigate the rock fragmentation mechanism by continuous miners using an automated rotary cutting simulator. The primary factors in
Feb 24, 1997
-
Wireless Access To Live Data From Mining Operations - Anywhere & Anytime
By R. Heersink, C. H. Wells
Innovations in communications and real-time information systems are providing industry opportunities to improve profitability. Real-time operating data is collected from equipment across a site or ev
Jan 1, 2002
-
A Review Of Optimal Planning Of Level And Raise Spacing In Inclined Narrow Reefs
By C. Musingwini
The subject of optimal planning of level and raise spacing for inclined narrow reef deposits has received intermittent attention over the years because the subject matter is inherently complex. Previo
Jan 1, 2010
-
Improved Seepage Water Quality by Establishing a Marsh on a Pyrrhotite Tailings Pong (1987 Final Report)
By D. R. Griffiths
"Oxidation of pyrrhotite prcxiuces sulphuric acid which in turn leaches out heavy metals, resulting in acidic contaminated seepages. The establishment of a marsh on top of the pyrrhotite would result
Jan 1, 1988
-
Gold Potential of a Hidden Archean Fault Zone: The Case of the Cadillac-Larder Lake Fault
By O. Rabeau, M. Legault, A. Cheilletz, L. Z. Cheng, J. J. Royer, M. Jébrak
"By compiling geological, structural, geophysical, and geochemical information into a 3D geological model, we evaluated the orogenic gold potential in the vicinity of a hidden segment of an important
Jan 1, 2009
-
Notes on Lake Margaret Hydro-Electric Power Scheme.
LAKE MARGARET is situate high up on the West Coast Range of Tasmania, and lies in a roughly triangular valley formed by the ridge of Mount Sedgwick on the south, the ridge formed by Mounts Geikie and
Jan 1, 1915
-
Review Of The Development Work On The Mintek Thermal Magnesium Process (MTMP) - Synopsis
By M. Abdellatif
The Mintek Thermal Magnesium Process (MTMP) process is based on DC open arc metallothermic smelting of calcined dolomite at normal pressure and temperatures of 1650?1750°C. The process was demonstrate
Jan 1, 2011
-
Flint Clays of the Merrygoen-Digilah Area
The area between Merrygoen and Digilah is located on a structural high that separates the Sydney Basin from the Great Artesian Basin, and hence the stratigraphic succession of younger rocks overlying
Jan 1, 1973
-
CFD simulation and experimental measurement of nickel solids concentration distribution in a stirred tank - Synopsis
By A. Ochieng
Solids suspension influences the quality of mixing and energy requirement in a solid-liquid system, both of which determine the efficiency of industrial processes such as nickel precipitation. Nickel
Jan 1, 2010
-
The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism
The Purification of Low-Grade Quartz Ore by Flotation and its Mechanism
Sep 13, 2010
-
Support selection of mine roadways by means of a computer program
By Erdal Ünal
The computer program introduced in this paper is based on design guidelines developed for selection of support systems used in mine roadways. The support types considered include rock bolts as well as
Jan 1, 1989
-
Treatment and History of Arsenic Bearing Ores at Con Mine
By Adrian Daniel
"Dating back to 1934, Con Mine is located directly south to the city of Yellowknife in the NWT, Canada. With mill operations ceasing in 2004, a challenging surface remediation situation resulted which
Jan 1, 2009
-
Geomechanics Of Large Stone Structures: A Case History From The Washington National Cathedral
By R. Mark, R. Richards
The Washington National Cathedral is one of the largest masonry structures in the USA, and like many of its European Gothic counterparts, it required nearly a century to construct. The design was alt
-
2012 Fox Conference Turns Its Focus To International Projects
For the first time in its history, the George A. Fox Conference let its focus venture away from the friendly confines of the East Coast of the United States to spend part of the one-day conference loo
Jan 1, 2012
-
Matching numerical methods to rock engineering problems: a summary of the key issues
By J. P. Harrison, J. A. Hudson
ABSTRACT: Given the current widespread use of numerical models for rock mechanics and rock engineering, and the ‘Technology Road Map’ theme of the Congress, it is timely to consider the key issues in
Jan 1, 2003