Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Application in Design for Close Proximity Multi-Seem Mining

    Virtually all mineable Appalachian coal seams exist in a multi-seam environment. This makes it inevitable that most seams will eventually experience interaction induced ground control and mining probl

    Jan 1, 1987

  • SME-ICGCM
    An Analysis of Rock Failure Around a Deep Longwall Using Microseismics

    By Keith Heasley

    In this paper, a state-of-the-art, three-dimensional, full waveform, microseismic system was used to analyze the rock failure around a deep (> 750 in (2500 ft) of cover) bump-prone longwall panel. The

    Jan 1, 2001

  • SME-ICGCM
    Theory and Technology of Mining Subsidence Control by Grouting the Overlying Strata Separations with Fine-Coal Ash

    By Yanfa Gao

    Abstract In order to control and reduce ground subsidence due to coal mining, and to protect building, railway and other surface construction, a new subsidence control method is proposed. Ground subsi

    Jan 1, 2002

  • SME-ICGCM
    Development of a New Roof Bolt Technology to Improve Gate- Road Performance

    By Vince Caggiano

    The newly developed Hilti OneStep roof bolt combines the standard 5-step anchoring process (i.e. drilling, transfer of drill steel, insertion of resin, insertion of rod and tightening) into one easy o

    Jan 1, 2005

  • SME-ICGCM
    "Void Fill Techniques for Stabilizing Roof Conditions during LongwallShield Recovery"

    By Rusty Mchenry, Craig Dickerson, Robin L. Oldham

    "It has been proven that longwall faces can be moved safely and efficiently. However, abutment pressures and poor ground control conditions can halt operations and be hazardous to coal miners. Recentl

    Jan 1, 2015

  • SME-ICGCM
    Strata Control Advances At Jim Walter Resources, Mining Division

    By Eddie Martin

    Jim Walter Resources, Mining Division, employs the retreat longwall mining system as the primary method of coal production. The strata control aspects of developing and maintaining roadways for retrea

    Jan 1, 1988

  • SME-ICGCM
    Management of Floor Heave at Bulga Underground Operations—A Case Study

    By Kudret Tutuk, Serkan Saydam, Sungsoon Mo

    "This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience

    Jan 1, 2018

  • SME-ICGCM
    Fully Grouted Torque Tension Bolts Successfully Support Pittsburgh Seam Longwall Gate-roads

    By John Kucish

    Roof bolting in the Pittsburgh Coalbed takes many forms today: coupled partially grouted bolts, fully grouted rebar, passive cable bolts, tensioned cable bolts, and torque tension rebar. The Federal N

    Jan 1, 2005

  • SME-ICGCM
    Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor

    By Weidong Pan, Yinchao Yang, Baodong Zuo

    Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    Use of a Laser Grid System for Accurate Roof Bolt Location

    By William Kendall

    "A tremendous amount of research, analysis, and engineering time is used to design a proper roof support system including the type, length, and location of the roof bolts. Unfortunately, since the roo

    Jan 1, 2016

  • SME-ICGCM
    Change in Primary Roof Support System at Quarto Mining Company's Powhatan No. 4 Mine Results in Improved Safety, Productivity and Costs

    By Michael J. Peacock

    The Powhatan No. 4 Mine is located in southeastern Ohio along the Ohio River in Monroe County. The mine produces approximately 3.2 million tons of steam coal annually from the Pittsburgh No. 8 seam. T

    Jan 1, 1986

  • SME-ICGCM
    Design Considerations For Angle Bolters

    By Charles D. Albright

    FMC built its first angle bolter in 1969. This was a single mast unit which could drill holes for conventional bolts or angle holes for installing roof trusses. From this drill we learned very quickie

    Jan 1, 1982

  • SME-ICGCM
    Controlled Thrust And Torque Placement Of Mechanical Anchor Bolts And Their Relationship To Improved Roof Control

    By Anil Mahyera

    Under contract to the Bureau of Mines, a roofbolting machine has been developed which will: control torque on the bolthead to within 4 percent of a set point, control thrust to a low level (150 lbf),

    Jan 1, 1981

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems

    By Robert M. Cox

    Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These

    Jan 1, 1994

  • SME-ICGCM
    Shear Bond Characteristics in Grouted Cable Bolts

    By Jian Yong Chen

    The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o

    Jan 1, 2005

  • SME-ICGCM
    The Impact Of Variability In Coal Strength On Mine Planning And Design - A Case History

    By David A. Newman

    Strength and physical property testing of coal is conducted regularly by the Arch Mineral Corporation as part of reserve exploration. Pillar design and mine layout are the primary applications for the

    Jan 1, 1993

  • SME-ICGCM
    The Formation And Effects Of Transient Abutment Stress During Nonuniform Face Advance

    By George J. Karabin

    Since the inception of a qualitative pressure arch theory by Haak4 in 1911, much work has been done in an effort to apply this concept to underground mining. It has been used in both longwall and room

    Jan 1, 1982