Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    System behavior analysis of the ground movement around a longwall

    By Jian Wu

    In this paper, the surrounding rocks and the supports in a longwall are taken as an integral, i.e. a system. The structural characteristics and behavior of the system are discussed based on in-situ ob

    Jan 1, 1989

  • SME-ICGCM
    Modal Testing and Dynamic Finite Element Analysis of a Roof Bolter?s Drilling Boom

    By Youzhen Zhang

    The drilling boom is the key component of a roof bolter, and it has significant impact on the performance, safety, and reliability of the overall working device. In this paper, the experimental modal

    Jan 1, 2012

  • SME-ICGCM
    Geotechnical Assessment Of Skin Reinforcement In Underground Mines (f05de68f-e8c8-43ca-aab9-9a65452cc10f)

    By Jan A. Nemcik

    Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati

    Jan 1, 2009

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • SME-ICGCM
    Roof Falls: An Inherent Risk In Underground Coal Mining (656e7541-42e3-48b1-8edc-4e23e6c7b7b1)

    By Kourosh Shahriar

    The occurrence of rock falls in underground coal mines entails detrimental effects as fatal or non-fatal injuries on workers, stoppages in mining operations and breakdown of equipment. In this paper,

    Jan 1, 2009

  • SME-ICGCM
    Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga Mine

    By David C. Oyler

    The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i

    Jan 1, 1987

  • SME-ICGCM
    Complex Seismic Trace Attributes In Coal Exploration

    By Lawrence M. Gochioco

    The interpretation of coal seismic data requires a certain precision and accuracy to make the results more reliable. The signature of the seismic wavelet provides a host of valuable geologic informati

    Jan 1, 1989

  • SME-ICGCM
    Ground Control Design Challenges At The El Boleo Copper Project (fe854eab-fde5-445c-8a43-3f4fce2f58ca)

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME-ICGCM
    Application Of Hilti Onestep Bolts For Roadway Support In German Deep Coal Mines

    By Michael Bayerl

    The HILTI OneStep rockbolt was implemented for roadway development in German deep coal mines in 2004. The development by HILTI Company is based on a technical joint venture with RAG Deutsche Steinkoh

    Jan 1, 2009

  • SME-ICGCM
    Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study

    By P. Tsang

    The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different

    Jan 1, 1989

  • SME-ICGCM
    Drainage Of Water From Abandoned Mines By Horizontal Drilling

    By Alan J. Zeni

    Drainage of water from abandoned underground mines has become important in recent years because of safety concerns when mining near abandoned works or reentering abandoned mines for further developmen

    Jan 1, 1990

  • SME-ICGCM
    Roof Pressure Monitoring Using The Integrated Longwalt Automation System By WESTFALIA

    By Ulrich Paschedag

    The WESTFALIA group of companies developer and manufactures underground mining machinery for complete high-performance longwalls. WESTFALIA uses a state of the art electrohydraulic system as the most

    Jan 1, 1994

  • SME-ICGCM
    Comparison of the Mark-Bieniawski and Wilson Pillar Equations Using Site Specific Data

    By Vincent Scovazzo

    This paper compares the two most common pillar design equations used worldwide by John T. Boyd Company; the Mark-Bieniawski Equation, an empirical approach, and the Wilson Equation, an analytical appr

    Jan 1, 2008

  • SME-ICGCM
    Field Monitoring of Rock Bolting Performance in Weak Roof Strata

    By Tingkan Lu

    To understand the reinforcing mechanisms of the fully grouted resin bolt and clarify its performance in weak roof strata, the field monitoring investigation using instrumented bolts has been conducted

    Jan 1, 1998

  • SME-ICGCM
    Deformation and failure-time prediction in rock mechanics

    By Barry Voight

    The law [ ] where [ ] is a measurable quantity such as strain and A and cu are empirical constants, describes the behavior of materials in terminal stages of failure under conditions of approximately

    Jan 1, 1989

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou

    Jan 1, 1984

  • SME-ICGCM
    A Case Study of Longwall Roof-Supports Interaction

    By Y. H. Wang

    During the last two decades many research projects were conducted to study the load requirements for the powered supported longwall faces (1-6). Significant results had been achieved by these research

    Jan 1, 1986

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Proposed Criteria For Subsidence Damage To Buildings (d2ee0f1e-295b-4fb1-ab17-d19f1e17df4a)

    By Swapan Bhattacharya

    United States federal and state regulatory authorities require underground mine operators to adopt adequate measures to minimize material damage to the surface caused by nine subsidence. This paper pr

    Jan 1, 1984

  • SME-ICGCM
    Multiple Seam Mining Interactions ? A Case Study

    By Khaled Morsy

    The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t

    Jan 1, 2006