Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • SME
    Haul Truck Safety And Virtual Environments Training

    By A. Schaum

    On average, there are approximately 10 fatal haul truck accidents per year. The most common causes for haul truck accidents include mechanical problems, inadequate training and insufficient road/berm

    Jan 1, 2008

  • SME
    Evaluating Ground Conditions Ahead of a TBM Using Probe Drill Data

    By Steven K. Duke, Jay Arabshahi

    An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system

    Jan 1, 2007

  • SME
    Technology News – Excavators Designed for Use in Confined Spaces

    Komatsu America International has introduced two new hydraulic excavators. They can work in congested and confined areas. The tight tail swing radius of the PC128US-2 and PC22-8USLC-2 enables the exc

    Jan 1, 2000

  • SME
    Geochemical types of sulfide ore as indicators of mineral evolution at the hydrothermal vent field Jubileynoye (MAR)

    By Anna Sukhanova, Svetlana Babaeva, Sergey Andreev, Victor Beltenev

    "The Zenith-Victoria /1/ and Jubileynoye /2/ hydrothermal fields have symmetrical structural position on the Mid Atlantic Ridge (Fig. 1). In order to compare the evolution of hydrothermal systems, we

    Sep 1, 2014

  • SME
    New York Subway Caverns and Crossovers—A Tale of Trials and Tribulations

    By Charles Stone, Madan Naik, Drupad Desai, Karel Rossler

    Planning of New York’s new subway line dictated the location of shallow underground station caverns and track crossovers. Clear span openings ranging from70 feet to 100 feet and lengths in excess of 1

    Jan 1, 2005

  • SME
    Waste Dump Site Selection By Using Fuzzy Vikor

    By A. Yazadni-Chamzini

    Considering the nature of open pit mines, harvest volume, it usually is required to remove a lot of waste to access to mineral planned grade. So, one of the most important part of open pit mines desig

    Jan 1, 2012

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001

  • SME
    New Miner Training for the 21st Century

    By Daniel H. McClain

    A unique partnership between the Colorado Mine Safety and Training Program (CMSTP), the Colorado Rock Products Association (CRPA) and the Higher Education and Advanced Technology (HEAT)Center resulted

    Jan 1, 2003

  • SME
    Palygorskite (Attapulgite) In Central China - Preprint 09-035

    By H. H. Murray

    The largest reserves of palygorskite in the world are located in Anhui and Jiangsu Provinces in East Central China. The deposits are Middle Miocene in age and range from 3 to 6 m in thickness. The d

    Jan 1, 2009

  • SME
    A Review Of The Analysis Of Amphibole Fibers

    By K. A. Allison, D. R. Van Orden, R. J. Lee

    Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici

    Jan 1, 2005

  • SME
    An Analysis Method For Modeling Compensation Of Settlements Due To Tunnel Driving BY Grouting Cement Suspensions

    By Christian Wawrzyniak

    An analysis method for modeling compensation grouting based on the finite element method is presented. By this method the design parameters of compensation grouting, grouting pressure and grouting vol

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • SME
    Banning Cyanide Use at McDonald – An Attack on Open-Pit Mining

    By Richard H. De Voto

    The McDonald gold project and two satellite gold deposits near Lincoln, MT were discovered in the early 1990s. They contain at least 307.9 t (9.9 million oz) of gold and 933 t (30 million oz)of silve

    Jan 1, 2000

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • SME
    State-of-Art Grouting Remedy for Ground Improvement

    By Faruk Oksuz, Cary Hirner, William A. Rochford

    Grouting is a frequently utilized remedy in the planning and implementation of ground improvement and tunnel rehabilitation practice. The state-of-art grouting application used for Chicago’s McCook Re

    Jan 1, 2005

  • SME
    Discussion - Development of the Screen Bowl Centrifuge for Dewatering Coal Fines Technical Papers, MINING ENGINEERING, Vol. 35, No. 4 April 1983, PP. 333-336

    By N. D. Policow, J. S. Orphanos

    D.A. Dahlstrom In the paper, a comparison was made between flowsheets using the screen bowl centrifuge and disc filters, respectively, as the primary dewatering device. The authors very effectively

    Jan 12, 1983

  • SME
    Urban Blasting Essential to Schedule Driven West Area CSO Tunnel and Pumping Station Project

    By James McNally, Adam Stremcha, John MacGregor

    With 13.7km of TBM tunneling in Atlanta’s hard gneiss well under way, drill and shoot work continues on several sites throughout the city. In order for the City of Atlanta to meet the consent decree i

    Jan 1, 2007

  • SME
    Capillary Cover Design For Leach Pad Closure

    By K. Burke, G. Zhan, A. Mayer

    A cover with capillary barrier effects (CCBE) is being constructed on the AA Leach Pad at the Barrick Goldstrike Mine site near Carlin, Nevada. The purpose of the cover is to eliminate/minimize infil

    Jan 1, 2001