Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Quantitative Model for Gravity Separation Unit Operations that rely on Stratification
By R. P. King
A class of gravity separation unit operations in ore-dressing relies for its operation on the production of a stratified bed. Heavier material gravitates downwards, and separation is achieved by split
Jan 1, 1987
-
The Role Of Simulation Modelling In Project Evaluation (a4b73ae2-ef8e-4c24-a304-40977e83102c)
By R. Hoare
TSG Consulting works with many of the major global mining companies using simulation modelling as an integral component in their development team's processes to determine which combination of inf
Jan 1, 2007
-
Old Tricks For New Dogs Areas For Focus In Mineral Sand Processing
By S. K. Gilman, P. S. Marcos
There are basic areas of importance within a concentrator or mineral separation plant, which require focus to ensure acceptable recoveries, throughputs remain at an acceptable level and product grades
Jan 1, 2007
-
Nationalization: An Analysis Of The Competing Interests Of Capital, Labour, And Government - Synopsis
By B. Sergeant
Any study of the contentious subject of nationalization can ultimately be reduced to a sombre analysis of the simultaneous, and very different, interests of capital, labour, and government. Each of th
Jan 1, 2013
-
Simulation Of Fouling In Membrane Processes With Cellular Automata
By A. M. Engelbrecht
Paper written on project work carried out in partial fulfilment of B Eng. (Chemical) Membrane processes are vital to a diverse range of technical and biological systems, which also feature in miner
Jan 1, 2007
-
A Managed Approach To Project Insurance
By N. Watson
Historically the insurance industry's involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure th
Jan 1, 2007
-
Use of Continuous Flotation Operation Data from Plant Surveys to Characterise Ore for Scale-Up Purposes
By R. B. Khumalo, F. K. Mulenga
Sampling in a continuous flotation plant is always a challenge as these plants are meant for production and not research work. The continuous flotation operation used in this work produced three sets
Jan 1, 2023
-
Validation Of The AMIRA P9 Flotation Model Using The Floatability Characterisation Test Rig (FCTR) (42de3f2a-5b83-478d-9e10-9fa673cd825a)
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit
Jan 1, 2007
-
Naturally Occurring Radioactive Materials and the Regulatory Challenges to the Zircon Industry
By K. Harlow
"Zircon is a naturally occurring radioactive material (NORM) and as such is subject to a variety of regulations around the world. The regulatory processes and their implementation are summarized and t
Jan 1, 2017
-
Flotation Of Oxide Minerals By Sulphidization - The Development Of A Sulphidization Control System For Laboratory Testwork
By J. C. D. Gush
Paper written on project work carried out in partial fulfilment of Laboratory-scale testwork was undertaken to recover oxidic copper-cobalt minerals by froth flotation, which requires maintaining
Jan 1, 2005
-
A Spatial Mine-to-Plan Compliance Approach to Improve Alignment of Shortand Long-Term Mine Planning at Open Pit Mines
By T. J. Otto, C. Musingwini
"The objective of any mining company is to sustainably maximize the net present value (NPV) throughout the life-of-mine (LOM). The expected NPV over the LOM is calculated based on a mine plan, yet the
Mar 1, 2019
-
Reply To The Comments Made By F.S.A. De Frey On The Paper 'Design Of Merensky Reef Crush Pillar'
By B. P. Watson
The discussion written by Dr de Frey suggests that mine design should be based on closely spaced stability pillars. However, this concept leads to low extraction ratios at depth. The concept of `crush
Jan 1, 2011
-
Turning mineral processing tailings into an Asset: A programmatic approach for the development of valorization opportunities, J.L. Broadhurst, A. Kotsiopoulos, J.R. Amaral Filho, and S.T.L. Harrison
By S. T. L. Harrison, A. Kotsiopoulos, J. R. Amaral Filho, J. L. Broadhurst
The land disposal of voluminous fine-grained tailings from the processing of mined ore bodies poses a long-term risk to the surrounding environment and local communities, while also representing a los
Jan 1, 2020
-
A Comparison of Slope Stability Analyses in Two and Three Dimensions
By D. Wines
"Slope stability analyses have traditionally been undertaken in two dimensions assuming plane strain conditions. Although three-dimensional analysis techniques are widely available and used routinely
Jan 1, 2016
-
3D modelling for mineral resource estimation of the Darreh-Zereshk copper deposit using the indicator kriging approach APCOM 2021
By Z Bagheri, E Moosavi
Identifying the exact borders of geological domains and assessing the uncertainty of these borders are crucial steps in resource estimation. This potential field method was designed to build 3D geolog
Sep 1, 2021
-
Resource Estimation for Deep Tabular Orebodies the Anglogold Ashanti Way
By T. Flitton, R. Peattie
"The extreme depths and consequent expense of drilling and sampling the gold-bearing reefs of the Witwatersrand Basin have resulted in limited data being available for estimation of grade ahead of the
Jan 1, 2016
-
Optimum versus maximum recovery of gold
By P. R. Jochens
It is interesting to note that, when the Technical Programme Committee-Mining first decided on this particular topic for a colloquium, the proposed title was different in that it used the words '
Jan 1, 1981
-
2.1 van der Linde - Determination Of Correct Sample Size And Preperation Method
By G. P. L. van der Linde
EVERY OREBODY IS UNIQUE [ ] GEOLOGY AND MINERALIZATION DIFFERENT [ ]
Jan 1, 2005
-
Progress in the development of mechanized stoping methods
By N. C. Joughin
Progress during the last two years in the Chamber of Mines programme for the development of mechanized stoping methods is reviewed, and advances in the basic technology are outlined. Specifically. adv
Jan 1, 1978
-
The basic tendencies of raising the fire safety of the conveyor belts for coal mines
By L. S. Belyayeva, A. S. Chumak, N. N. Boyko, A. V. Bondarenko
Analysis of results of many years concerned study of the fire hazard parameters of the material of the mine conveyor belts come in for use at the mines of the Ukraine in 1984-2002 that was carried out
Jan 1, 2003