    Cape Wind Offshore Wind Farm – Electrical Service Platform – Substructure Jacket Design

    By S. Chilka, I. Maloney, J. Brady

    "The purpose of this project was to design the Electrical Service Platform (ESP) for the Cape Wind Offshore Wind Farm. The ESP structure comprises two primary parts: the topside platform housing the e

    Jan 1, 2017

  • DFI
    Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In Turkey

    By Alp Gokalp

    The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p

    Jan 1, 2002

  • DFI
    Practical Construction Considerations for Runway Extension and Taxiway Expansion over Soft/Organic Soil Using a Column Supported Load Transfer Platform

    By Brian T. Nereson, Michael C. Penney

    "This technical paper was prepared to describe the general process by which the authors designed a column-supported load transfer platform (LTP) for support of asphalt-paved runway and taxiway embankm

    Jan 1, 2016

  • DFI
    Blast Densification Of Fine Tailings

    By Brian W. Wilson

    A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a

    Jan 1, 2010

  • DFI
    Mansueto Library: Drama below Ground and Above

    By Patrick J. Lydon, Gregory A. Terri

    "The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The

    Jan 1, 2013

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • DFI
    The Use of Advanced Electronic Features in Foundation Equipment Help or Hype for the User?

    By Manfred Schoepf

    "Construction projects using the most advanced technologies and organizational structures demand intelligent construction machinery. In this process, automation technology plays an increasingly import

    Jan 1, 2015

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • DFI
    Towards a Performance-Based Design of Drilled Shafts

    By Kam Ng

    For bridges or buildings that may be subjected to large vertical and lateral loads, drilled shafts offer an economic foundation solution. While the current drilled shaft design practice is considered

    Jan 1, 2013

  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    Errata (5268ac87-18a9-458e-b334-4f72060324e3)

    Volume 1 pages 665-671 Title should read as Dynamic pile testing of H-piles at HDB sites J.Wei, Y. S. Heng, C. S. Lok, M. K.Chong Housing and Development Board, Singapore 'tons'

    Jan 1, 1994

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Behavior Of Friction Piles In Soft Clays

    By Safwan Labanieh

    An experimental set-up is specially designed to study the behavior of a friction pile of 3 cm diameter in contact with the soft clay of Mexico City in a small calibration chamber (CC) of 30 cm diamete

    Jan 1, 2002

  • DFI
    Role of Probabilistic Methods in Sustainable Geotechnical Levee Integrity Analysis

    By Juan M. Pestana-Nascimento, Robert G. Bea, Hamed Hamedifar, Emery M. Roe

    The current State-of-the-Practice is grounded heavily on deterministic characterization and assessment of the performance of civil engineering infrastructure. In particular, flood defense systems, suc

    Jan 1, 2017

  • DFI
    The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown Calgary

    By Matthew Janes

    The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d

    Jan 1, 2008

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Session 22 "Compaction Grouting and Limited Mobility Grouting"

    By Allen Cadden

    The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n

    Feb 10, 2003

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    DFI Model Piledriving Contractor Proposal

    With respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o