Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Methods Of Dewatering And Ground Water Control ? Synopsis
By J. P. Powers
Methods for dewatering and the control of ground water for construction and mining are discussed, including open pumping; predrainage with deep wells, wellpoints or other systems; cutoff or exclusion
Jan 1, 2010
-
A Numerical Model For Load Transfer And Settlement Of Bored Cast In-Situ Piles
By Joshua R. Omer
A numerical model is developed for predicting the load transfer and settlement behaviour of vertically loaded, bored cast in-situ piles. Based on analysis of full-scale pile tests, closed-form equatio
Jan 1, 2010
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To Scour
By Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Hybrid Excavation Support System for the Union Station Revitalization Project
By Charles G. Crans, Naresh Gurpersaud
"Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni
Jan 1, 2017
-
Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float Technique
By Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka
The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi
Jan 1, 2015
-
Unique Foundation Solution For The Shriners Burns Institute Building Expansion - I. Introduction
By Edmund Cardoza
In the spring of 1993, construction began on an ambitious building project in Boston, Massachusetts. The Shriners organization committed to offer state-of-the-art adolescent burn treatment and rehabil
Jan 1, 1994
-
Stabilization of Materials – Upgrading Of Soils and Sediments to Use in Geo-Constructions
By Helene Kennedy, Josef Macsik, Yvonne Rogbeck, Gregory Makusa, Göran Holm
"Constructions activities in cities often imply large volumes of surplus material which could be treated by stabilization for re-use in new geotechnical constructions. Modification of dredged sediment
Jan 1, 2015
-
Unusual Geology At Brooklyn's Edge And Its Influence On Design And Installation Of Piles
By Hiren J. Shah
Across much of New York City, the geology of glacially deposited soils follows a common sequence. Outwash sands generally overlie varved silts and clays, which lie above a basal till deposit underlai
Jan 1, 2008
-
Rehabilitation of the Kölnbrein Dam / Austria
By Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck Bridge
By Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017
-
Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case Studies
By Daniel Ruffing, Charlie Krug
In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher
-
Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional Perspective
By Kaushik Mukherjee
"Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and
Jan 1, 2015
-
Resonance Pile Driving with Zero Ground Vibration
By Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Excavation Construction for the Transbay Transit Center
By Nick O’Riordan, Kaitlyn L. Fleming, Michael Riemer, Youssef M. A. Hashash, Stephen McLandrich, Mohamad Jammoul, Pierre Gouvin, Andrew Yeskoo
"To accommodate urbanization, cities are developing more underground space as a means to house public transportation systems and other entities. Underground developments often require construction of
Jan 1, 2015
-
Confined Space And Inner-City Projects – Future Challenge And Opportunity For Diaphragm Walling
By Alexander Blatt, Franz-Werner Gerressen
Diaphragm walls are known as underground structural elements commonly used as retention systems for excavation pits and shafts and permanent foundation walls or elements. One can anticipate that globa
Nov 1, 2022
-
Pile Foundations for the San Francisco 49ers NFL Stadium
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - Introduction
By Ernest Naesgaard
Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c
Jan 1, 2004
-
Sunrise Powerlink: An Innovation in Foundation Design
By Steve Davidow, Nick Salisbury
"The Sunrise Powerlink project received numerous industry awards for excellence. The DFI C. William Bermingham Innovation Award recognized the innovative use of prefabricated steel micropile caps to i
Jan 1, 2014
-
Evaluating Installation Disturbance of Helical Anchors in Clay from Field Vane Tests
By John Erikson, Alan J. Lutenegger, Nicholas Williams
"In order to evaluate the level of disturbance produced in clays during installation, a series of single-helix and multi-helix anchors were installed at a test site consisting of a stiff overconsolida
Jan 1, 2017
-
Installing And Testing Multi-bar High Capacity Rock Tiedowns
By Andrew Pontecorvo, Steven Lowe, David Sposito
Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a