Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Novel Separation Process for Detoxifying Cadmium-Containing Residues from Zinc Purification Plants

    By Diankun Lu, Ganfeng Tu, Edouard Asselin, Feng Xie

    A novel separation process for detoxifying cadmium-containing residues arising from zinc hydrometallurgical processes has been developed. An initial investigation indicated that a high concentration o

    Jan 1, 2014

  • CIM
    Economic Analysis of Waste Crushing in Semi-Mobile In-Pit Crushing and Conveying Systems

    By M. Kumral, E. Dilhuydy, B. Ozdemir

    "In-pit crushing and conveyor (IPCC) systems have become increasingly popular in the mining industry as an alternative to truck-and-shovel systems. Deciding whether to haul waste rock by truck or IPCC

    Jan 1, 2017

  • CIM
    The Aurora Super Pump – Part II: Field Performance of a New Hydrotransport Pump

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The hydrotransport systems at Aurora experience high rates of wear,

    Jan 1, 2014

  • CIM
    Géologie Des Dépots Persévérance, Équinoxe Et P-Ouest Camp Minier De Matagami, Matagami Québec

    By Grant Arnold

    Le Camp Minier de Matagami est situé dans la ceinture volcano-sédimentaire Harricana- Turgeon appartenant à la Province du Supérieur, sous-province de l?Abitibi, au Québec. Les gisements de métaux de

    May 1, 2001

  • CIM
    Iron Control in Hydrometallurgy: The Positive Side of the Coin

    During the hydrometallurgical processing of the major base metals Cu, Zn, Ni and Co, the presence of iron is normally a serious complication, and iron separation from the pay metals usually constitute

    Jan 1, 2006

  • CIM
    Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation

    By Paul Krivokuca

    Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??

    May 1, 2008

  • CIM
    Restauration Du Site Minier Poirier (Joutel) - Expériences Acquises Et Suivi Des Travaux

    By Richard Maurice

    RÉSUMÉ La restauration du site minier Poirier, à Joutel s?est déroulée entre 1998 et 2001. Le principal élément des travaux a été la restauration du parc à résidus et des zones d?épanchement qui tot

    Nov 1, 2002

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    The Origins of Pressure Hydrometallurgy

    By F. Habashi

    The pioneer work on pressure hydrometallurgy was conducted in Russia at the end of the nineteenth, and the beginning of the twentieth centuries, by Karl Josef Bayer (1847-1904) and Vladimir Nikolyevit

    Jan 1, 2004

  • CIM
    Behaviour of Iron at the Ambatovy Nickel Operation in Madagascar

    By B. Haugrud, E. McConaghy, M. Collins, G. Smith

    "Laterite ore processed by the Ambatovy joint venture in Madagascar is primarily limonitic in nature, containing approximately 40–45 wt.% Fe and 1.1 wt.% Ni. The process selected for treatment of this

    Jan 1, 2017

  • CIM
    Precious-metal-bearing Volcanogenic Massive Sulfide Deposits, Campo Morado, Guerrero, Mexico

    By Mark Rebagliati, John Payne, Jim Oliver

    Abstract-The Campo Morado precious-metal-bearing, volcanogenic massive sulfide deposits occur in a lower Cretaceous, bimodal, calc-alkaline volcanic sequence in a major northerly trending belt in the

    Jan 1, 1997

  • CIM
    Precious-metal-bearing Volcanogenic Massive Sulfide Deposits, Campo Morado, Guerrero,Mexico (63b48013-4318-466b-b2d9-966e31151f49)

    By Mark Rebagliati, John Payne, Jim Oliver

    The Campo Morado precious-metal-bearing, volcanogenic massive sul?de deposits occurin a lower Cretaceous, bimodal, calc-alkaline volcanic sequence in a major northerly trending belt inthe Guerrero Ter

    Jan 1, 1997

  • CIM
    Mudrush Risk Evaluation

    By A. R. Guest, R. Clayton, J. Jakubec

    "The potential for mudrushes is a potential hazard that should be evaluated during cave mining studies. Mudrushes are a phenomenon that can have very different origins, but produce the same results: i

    Jan 1, 2016

  • CIM
    Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation

    By Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora

    "This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support

    Jan 1, 2010

  • CIM
    Pressure Filtration at Falconbridge Limited Strathcona Concentrator

    By J. F. Jackson, R. W. Mau

    "The first commercial installation in the mineral industry of the ""Verti-Press"" pressure filter was made by Falconbridge Limited at the Strathcona Concentrator to filter copper concentrate. The filt

    Jan 1, 1990

  • CIM
    Cost of Occupational Injuries and Diseases in the Mining Industry in Quebec

    By Lebeau M., P. Duguay

    "The cost of occupational injuries and diseases in the mining industry in Quebec was estimated for the period of 2010 to 2012. The method used takes into account the financial and human costs assumed

    Jan 1, 2018

  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Influence of the Extraction Process on the Characteristics of Oil Sands Fine Tailings

    By W. G. Miller, J. D. Scott, D. C. Sego

    ABSTRACT An overall study was conducted to evaluate the properties and processes influencing the rate and magnitude of consolidation for oil sands fine tailings produced using different extraction pro

    Jan 1, 2010

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007

  • CIM
    Asbestos in asphalt

    By M. Cossette, V. H. Tran

    "How can the durability of asphalt pavement be doubled without increasing highway budgets? Asphalt containing asbestos can provide the desired performance with additional costs being made up by longer

    Jan 1, 1991