Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    Performance of the oxygen limiting cover at the LTA site, Malartic, Quebec

    By M. R. Julien, A. Maqsoud, J. Martschuk, B. Bussière

    Acid mine drainage (AMD) from mine wastes is one of the most challenging environmental problems currently facing the mining industry. When mining wastes have the potential to produce AMD, the effluent

    Jan 1, 2006

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    A New ERA Tool for State of the Art Metallurgical Balance Calculations

    By Frédéric Flament, Luc Lachance

    "The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention

    Jan 1, 2011

  • CIM
    The Importance of Efficient Mass Flow Balance in Crushing and Screening Plants

    By Fernando Romero Lage

    The purpose of this paper is to analyze detailed crushing and screening configurations and the interrelationship as they relate to mass flow balance, operating efficiency, plant availability and final

    May 1, 2010

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • CIM
    Emperical Design of Stopes for the Lower Rodeo Orebody

    By Denis Thibodeau

    The selected mining method for the Rodeo lower Zone is slot and slash. Initial design indicated that the stope height should be limited to a maximum of 18 m, thus six levels were needed to extract the

    May 1, 2002

  • CIM
    Column Flotation Operation at Mines Gaspé Molybdenum Circuit

    By V. Coffin, T. Cienski

    "(Figure 1) Reagentized pulp enters into the column at about 1/4 of the distance from the top. Inside the column it meets with a downward flowing stream of water and with an upward flowing mass of air

    Jan 1, 1981

  • CIM
    “Energy Management Program”

    By K. H. B. Wenzl

    "Since the autumn of 1973, the world's attention was captured by the startling revelation that conventional energy supplies were not inexhaustible but were in fact quickly dwindling with future shorta

    Jan 1, 1978

  • CIM
    Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Erik Bartsch, Guy Comeau

    "The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade

    Jan 1, 2008

  • CIM
    Towards Formalizing Qualitative Operations Input Data into Mine Planning (2dcf5f47-b85e-490f-8b96-c37606eb1d7d)

    By T. G. Joseph

    Mines must manage variability from within their operations as well as those imposed upon them by external forces. This paper provides a framework to manage both internal and external variability throu

    Nov 1, 2011

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • CIM
    Use of the IREDES Standard For Real-Time Information Exchange in Mining Process Optimization

    By Christoph Müller

    Information exchange for mine process optimization is essential. Today, modern mining equipment uses the IREDES standard to exchange production plans and reports for easy management and storage. To ga

    Oct 1, 2009

  • CIM
    Data Mining for Prognostic of Complex Equipment with Applications in Aerospace and Railroad

    By Sylvain Létourneau

    Help organizations maximize the benefits of the data that they collect ? perform scientific research in: machine learning, data mining, statistics, artificial intelligence, soft computing, informatio

    May 1, 2008

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone

    By Peter Dunn

    London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for

    May 1, 2011