Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Effect of Aluminous Goethite on the Evaluation of Bauxite Deposits
The mineralogy of ten trihydrate bauxites and their leached residues from bomb digestion tests at 140, 180 and 2400C was investigated and the resultsòcorrelated with analytical data. It is shown th
Jan 1, 1973
-
Activity Models for Pyrometallurgical Processes Using STEPSOL
By Morris A. E
The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, th
Jan 1, 1991
-
Diveristy - A Strength for Western Mining
Diversity is a key strength for Western Mining Corporation. An international corporation with assets of about $A10 billion, WMC is engaged in both mining and downstream processing of minerals includin
Jan 1, 1996
-
Process-Data Acquisition in Hydrometallurgy
By Canterford JH
Current and future methods of data acquisition in hydrometallurgy are reviewed. Hydrometallurgical operations involve a wide range of chemical and physical processes for the recovery of metals and oth
Jan 1, 1985
-
Role of Natural Gas in New Zealand Energy Market
Natural Gas has been available in New Zealand for twenty years. During that time the gas share of the energy market has grown and now natural gas forms a significant part of New Zealand's energy
Jan 1, 1990
-
Planning and Modelling Maintenance Activities for High Effectiveness
By M Lellis
During the last decades, maintenance has changed from an ordinary repair activity to a complex function that plays an essential role contributing for the companyÆs results. The increasing level of com
Jan 1, 2003
-
Collector û Addition Point and Consumption
By D MacKay, W J. Bruckard
One of the mining worldÆs greatest challenges is to effectively use consumables (ie reagents and grinding media) to maximise metallurgical response, while minimising operating costs. It is anticipated
Jan 1, 2008
-
Database Systems Aided Improving Mine Production Reliability
By Xin J
In China, the State-run mines are currently practising an information card management system, to collect data about mine production and safety condition. Since large volumes of data will be obtained e
Jan 1, 1991
-
Technical Change - The Impending Revolution
It is a facet of modern-day life that change, even of a revolu- tionary nature, normally passes without comment. People have become so conditioned to continuous improve- ments in every aspect of their
Jan 1, 1988
-
Declining Markets - A Marketing Challenge
The annual growth in lead consumption in the Western world has declined sharply in the past ten years, as lead has suffered a wave of substitution by other materials, and has also been the object of c
Jan 1, 1985
-
The Establishment and Operation of Queensland Alumina Limited
The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r
Jan 1, 1978
-
Sampling for Anything - The Roles of Particulate and Time-Wise Material Heterogeneity in Sampling System Design
In the last 100 years, statistical sampling theory for particulate materials has developed to a stage where sampling systems can be confidently designed to provide assay results of known and controlle
Jan 1, 2002
-
Development And Operation Of Tailings Dump Retreatment Facilities At ZC/NBHC
By Bertrand D. L
Although investigations into treatment of Mt. Keast (a hill of tailing) began as early as 1940, it was not until the Imperial Smelting Furnace (I.S.F.) was installed at Cockle Creek by Sulphide Co
Jan 1, 1983
-
Modelling of Slag Blow in Copper Peirce-Smith Converters
By P Vix
A thermodynamic model of the copper Peirce-Smith (P-S) converter has been developed to predict the behaviour of magnetite in the converter slag, the amounts of slag and matte, the compositions of slag
Jan 1, 2005
-
In-Pit Crushing and Conveying System and Dexin Pit Copper Haulage Optimisation for Ore Transport
The output of Dexin Pit Copper is up to 33 million tonnes a year and the final depth is more than 500 m. As a cost reduction measure, the in-pit crushing and conveying system has was introduced to del
Jan 1, 2003
-
Special Problems of Management General Report
The papers to be presented in this Session show an interesting range of subject matter. Three discuss specific problems associated with existing mines, one deals with hydrogeological risk evaluatio
Jan 1, 1988
-
Silver Recovery at North Kalgurli (1912) Limited
During the past seven years silver recovery has been increased from 9 per cent to over 61 per cent. The changes in plant practiee which have led to this increase are described. Gold room clean-up p
Jan 1, 1964
-
The Development of an Ore Milling Traineeship
Traditionally mill operators have been employed with varying educational backgrounds with little if any formal training in aspects of mineral processing. Pasminco Mining-Rosebery, in line with other
Jan 1, 1991
-
Evaluation of Blast Furnace Slag as Base Material in Road Pavements
Graded macadam slag base has been used successfully by the Department of Main Roads, N.S.W., in the construction of Expressways. However, the use of graded macadam in urban conditions introduces p
Jan 1, 1979
-
A Case For Coal Mining Research In Australia
The Bowen Basin coal field is an important energy resource. A relatively small proportion is avail- able by open cut operations. Responsible men throughout the world have warned of the need to incr
Jan 1, 1976