Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    "What do Geostatistics and Cut-Off Grade Optimisation have to do with Real Options Applied to Mine Project Evaluation?"

    By J Araya, O Leiva

    The mine evaluation process, composed of the designing, planning and valuation of a mine project, is, among other variables, based on an estimated orebody model. However, as the information from the d

    Sep 26, 2011

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    Ignition of Elura Lead Concentrate Under Flash Drying Conditions

    By Turner T. M, Jorgensen F. R A

    The tendency of the concentrate to ignite was studied using four techniques, namely, laminar flow furnace, fluid bed, thermal analysis and boat-in-furnace. Exothermic activity occurred at two temp

    Jan 1, 1987

  • AUSIMM
    Construction of A Sewer Pipeline of 1 200 MM Internal Diameter by A Pipe Jacking Method Using A Small Tunnel Boring Machine

    This is a brief introduction of a sewer pipeline constructed with a pipe jacking method in combination with a 1 200 mm finished inner diameter tunnel boring machine developed for the first time in

    Jan 1, 1987

  • AUSIMM
    An Approach to the Evaluation and Control of Blast Induced Damage

    By Scott A

    The object of most blasting operations is to destroy the insitu structure of the rock mass so that mechanical equipment can efficiently excavate the rock fragments. In achieving this objective the b

    Jan 1, 1990

  • AUSIMM
    Geodynamics of Giant Porphyry Ore Deposits

    By D Giles

    We present plate tectonic reconstructions, showing that porphyry-type ore deposits are spatially and temporally linked to ridge subduction. A reconstruction of the Peruvian subduction system reveals a

    Jan 1, 2008

  • AUSIMM
    Design of a Large-Scale Concentrator for Treatment of a Copper Skarn Orebody

    By T Hayward, G Lane, M Phillips

    In December 2004 Phu Bia Mining Ltd commissioned Ausenco International Limited to conduct a feasibility study for its Phu Kham copper-gold project located in Laos. The feasibility study for a mining a

    Jan 1, 2007

  • AUSIMM
    Solution and Precipitate Equilibria in Oleate-Alkaline Earth Cation Mineral Systems

    By R O. James

    The usual focus of papers on fatty acid collector action in non-sulfide flotation is on the adsorption of the carboxylate and/or neutral molecule species at the mineral-solution interface. Little atte

    Jan 1, 2005

  • AUSIMM
    Three-Dimensional and Numerical Modelling û Tools for Assessing Mineral Resource Potential Under Cover

    By D Purdy, K Wilkinson, P Blake, M Fitzell, J McLellan, L Feltrin, O Dixon

    The northern Drummond and Bowen basins region represents one of AustraliaÆs most prospective areas for epithermal vein and stockwork style gold deposits, with both low and high sulfidation epithermal

    Jan 1, 2008

  • AUSIMM
    Grade Control Sampling Methods in Underground Gold Mines

    Grade control aims to deliver quality tonnes to the mill via accurate definition of ore and waste. It comprises data collection and interpretation; local reserve estimation; supervision of development

    Mar 1, 2010

  • AUSIMM
    Estimating the Remaining Fatigue Life of Stockyard Machines

    By S Rice, A Midlin

    Many of the stacking and reclaiming machines employed in the mining industry today are operating in ways that were never envisaged in the days before they were commissioned, with greater throughput, i

    Jan 1, 2007

  • AUSIMM
    Horizontal Cyclone Plant Trials at Bouganville Copper Limited

    By Noreen D

    At Bougainville Copper Limited comparison testwork was conducted between "horizontal" cycloning and conventional vertical cycloning. Horizontal cycloning reduces circulating load and allows increase

    Jan 1, 1988

  • AUSIMM
    A Design Approach for a Swelling Rock in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    The swelling process is an impor- tant problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of t

    Jan 1, 1992

  • AUSIMM
    Maintaining and Improving the Economics of Open Pit Mining

    Maintaining and improving the economics of open pit mining in the future requires understanding of the characteristics of open pit mining that are different to other mining or business activities, des

    Jan 1, 1992

  • AUSIMM
    Sub-Surface Cracks due to Disc Cutter Spacing for Improved Rock Breakage and Ground Control

    By Guo H

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in

    Jan 1, 1992

  • AUSIMM
    Silica Control During Zinc Calcine Leacing at Cominco's Trail Operations

    By Jankola W. A, Delong O. J

    Historically, the silica content of zinc concentrates treated at Cominco's Trail Operations has been low. Silica in the roaster calcine seldom exceeded 1.5 per cent because of the low silica co

    Jan 1, 1993

  • AUSIMM
    Dewatering and Subsequent Dragline Operations in Grevillea Pit - Saraji Mine

    By Toomey P. T

    In many open cut coal mines, rivers and large creeks can cause planning and operating difficulties, both in the terms of the more obvious location of the current watercourse, but, and sometimes more i

    Jan 1, 1992

  • AUSIMM
    Study of the Impact of Mining Under Massive Roof at datong Coal Mines, China

    By Sheng X. L

    The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts.

    Jan 1, 1992

  • AUSIMM
    The Melbourne Underground Rail Loop Overall Tasks and Organisation

    By Watson F. G

    As an introductory paper of a series on the Melbourne (Australia) Underground Rail Loop extension to the extensive electrified suburban railway system the paper outlines the need for the Loop, leg

    Jan 1, 1981

  • AUSIMM
    Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, Alaska

    By Caivin JS, Freeman CJ

    The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton

    Jan 1, 1987