Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Developments in the measurement of stress in rock

    By I Gray

    Other than being reasonably certain of the average vertical stress being lithostatic, there can be little certainty about stress in the ground. The stresses and strains in rock are a function of gravi

    Nov 29, 2022

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    Application of Infrared Spectral Data for Predictive Modelling of Alteration-Mineralisation Systems

    By S Pontual

    The use of spectral data has traditionally been for obtaining mineral information and for mapping out alteration systems. The output from these data is typically in the form of mineral assemblages and

    Aug 22, 2011

  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987

  • AUSIMM
    Mine Life Cycle Planning – Creating Lasting Value for Communities

    By S Robertson, I Buitrago

    Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in

    Jul 16, 2014

  • AUSIMM
    The Re-Opening of the Morning Star Gold Mine: A Case Study of the Ongoing Environmental Monitoring and Planning

    By E Hogan, M Goodz, R Wright

    The planning, permitting and monitoring procedures of the re-opening and rehabilitation of mine sites is an ongoing process which must continue throughout and beyond the life of the project. Both indu

    Jan 1, 1992

  • AUSIMM
    Exploration and Mining – The Need for Innovation

    By J F. H Thompson

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Mineral exploration and mining are challenging businesses. Remote and at times harsh condit

    Mar 18, 2015

  • AUSIMM
    The Future of the Global Mining Sector

    By T Goldsmith

    The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph

    Aug 18, 2014

  • AUSIMM
    The Circum-Pacific Map Project: Status Update, 1987

    By George G

    The Circum-Pacific Map Project is a cooperative international effort to prepare and publish geological, geophysical and mineral resource maps of the Pacific Basin and adjacent land areas. Earth sc

    Jan 1, 1987

  • AUSIMM
    Justification for Integrating Mechanical Sampling with Online Analysis

    By D W. Stevens

    Mechanical sampling provides a definitive value for the product sampled but the results are not instantaneous, meaning that decisions on process control can only be made hours after the sample is take

    Jul 29, 2014

  • AUSIMM
    Standardisation of Mine Control at Newmont Australia Underground Sites

    By B Ascott

    As a prerequisite to achieving integrated regional production reporting across multiple sites, Newmont Australia initiated a project to standardise the configuration and use of mine control systems at

    Jan 1, 2008

  • AUSIMM
    Machine learning for predicting chemical system behaviour of CaO-MgO-SiO2-Al2O3 steelmaking slags case study

    By B Laidens, D Souza, W Bielefeldt

    The CaO-MgO-SiO2-Al2O3 system, characterised by its intricate phases and thermodynamic properties, plays a pivotal role in steel secondary refining processes, encompassing desulfurisation, non-metalli

    Jun 19, 2024

  • AUSIMM
    The Hydrolysis of Iron in Acid Solutions

    A process was developed based on the thermal hydrolysis and precipitation of iron from solutions resulting from the leaching of zinc plant residue. A study was made of the hydrolysis of iron, at tempe

    Jan 1, 1967

  • AUSIMM
    Ventilation Considerations for the New Level Mine Project Access Tunnels

    By E Acu±a, B Prosser, R Alvarez, K Wallace

    This paper describes the ventilation analyses performed for the access tunnels at the New Level Mine project (NLMP) at CodelcoÆs El Teniente operation outside of Rancagua, Chile. This new mine is anti

    Jul 1, 2013

  • AUSIMM
    Environmental Assessment Of Derelict Mined Land, Emmaville, N.S.W.

    A survey of derelict and active alluvial tin and sapphire mines in the Emmaville area of northern N.S.W. as the first step in a pro- gramme of similar surveys to be undertaken throughout the State

    Jan 1, 1976

  • AUSIMM
    Lode Structures and Ore Shoots at Vatukoula, Fiji

    Vatukoula is a gold mining township situated at the south-west periphery of a Tertiary caldera which measures 3 miles by 4 miles. Erosion of the caldera resulted in the formation of a topographic depr

    Jan 1, 1967

  • AUSIMM
    Water Management at Capcoal Mine - Past, Present and Future Drivers for Sustainable Change

    By J C. Macintosh

    Capcoal Mine has modified its water use practices over the past 15 years. Two issues have changed the way water was managed:an economic review of water supply options for a planned expansion of the co

    Jan 1, 2006

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Tunnel Construction by TBM Sand Bar Hydroelectric Project

    This paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the S

    Jan 1, 1987

  • AUSIMM
    Grade Estimation for Short-Term Planning in Block Caving Mines

    By M Scoble, W S. Dunbar

    This paper reviews methods for grade estimation in short-term mine planning for block caving. Two particular tools are used: Ordinary Kriging and Simple Kriging with moving averages. It is also consid

    Jan 1, 2000