Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Evolution of In-Seam Drilling for Gas Drainage

    By F Hungerford

    "In-seam drilling has been undertaken for the past 30 years for gas drainage to reduce the risk ofoutburst and lower the concentrations of seam gas in the underground ventilation. The drillingpractice

    Jun 1, 2012

  • AUSIMM
    Water Issues in DOZ Block Cave Mine, PT Freeport Indonesia

    By E Widijanto, A Srikant

    PT Freeport Indonesia operates a copper-gold mine located in the remote highlands of Papua, Indonesia, about 3500 km east of Jakarta. Currently, the district produces about 240 000 tonnes per day (tpd

    Jan 1, 2006

  • AUSIMM
    Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment

    By A Keogh, P Allen, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an

    Mar 18, 2015

  • AUSIMM
    What Happens If?-Some Remarks on Useful Geostatistical Concepts in the Design of Sampling Patterns

    Answers to many questions arising in the different phases of exploration, estimation and production of a mineral deposit, can be found in the geostatistical theory of G. Matheron. It is shown that

    Jan 1, 1976

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Application of Mineral Processing in Waste Treatment and Scrap Recycling

    Proceeding from statistical data on the development of waste volume, an endeavour was made to characterise waste materials with regard to the applicability of treatments based on mineral processing.

    Jan 1, 1993

  • AUSIMM
    Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated Landforms

    By T Leidich, M Van Zyl, H Lacy

    Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof

    Jul 16, 2014

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    The Practical Design of a Hydraulic Hoist

    The intention of this work was to con struct a machine on a pilot scale which could hoist a mixture of ore and water through a height of 300 metres and to operate the mach- ine to determine the para

    Jan 1, 1973

  • AUSIMM
    The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and Crushing

    By J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo

    Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in

    Aug 24, 2015

  • AUSIMM
    Prediction of Strata Caving Characteristics and its Impact on Longwall Operation

    By Nemick JA

    Recent advances in computer simulation together with field measurements of caving and microseismic activity about longwall panels, has allowed a much better understanding of the caving process and the

    Jan 1, 1998

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Blast Furnace Aerodynamics

    By Petersen V, Potke W, Polthier K

    The paper reviews some of the aerodynamic factors in the blast furnace process and outlines the areas requiring further study. Detailed discussion is given to the pressure drop in both the dry and th

    Jan 1, 1975

  • AUSIMM
    Mine Development Optimisation – An Evolutionary Process

    By J Kovacs

    Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ

    Mar 24, 2014

  • AUSIMM
    Diamond drilling at Efemçukuru gold mine, Turkey – a case study on the benefits of timely and cost-effective drilling to short-term planning

    By M Ozkayhan, N Arslan

    "The Efemçukuru underground mine in western Turkey is an intermediate sulfidation, epithermal gold deposit. The bulk of the mineral resources and all of the mineral reserves lie within the Kestanebele

    Sep 20, 2017

  • AUSIMM
    In-Pit Crushing and Conveying Bench Operations

    By T Atchison

    In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v

    Jul 11, 2011

  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    Conveying of Paste Backfill ù Focusing on Zero Harm on the Environment at Cannington

    The BHP Billiton Cannington Mine uses paste as the principal method of backfill. The paste consists of mine tailings and cement. The pastefill process at Cannington includes a surface plant where the

    Jan 1, 2002

  • AUSIMM
    Application of Artificial Neural Network in Estimation of Hydrocyclone Parameters

    By Gupta A, Fung C. C

    The hydrocyclone parameter d5Oc is estimated by the application of Artificial Neural Network (ANN). Results indicate that ANN performs equally well as compared to statically derived analytical formu

    Jan 1, 1996