Quantitative Risk Assessment Tools to Assist with Waste Management and Placement Guidelines
By S Lehane, S Pearce
The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these
Jul 27, 2015
-
The Computer Modelling of Surface Mining Operation
The Canada Centre for Mineral and Energy Technology (CANMET) /Calgary Coal Research Laboratory and the National Research Council in Ottawa established a joint working research group with industry to d
Jan 1, 1985
-
A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit
By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott
"Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or
Oct 10, 2016
-
Tube bundle analyser flow rate, why it is important
By M Tsai
Tube bundle gas monitoring systems have been used in the mining industry for over 50 years. The initial design was based on four individual gas analysers along with a series of solenoid valves, gas sa
Oct 12, 2022
-
Owner-Operator versus Contractor Production Scheduling - A Vision for the Effective Exploitation of Australian Gold Resources by Surface Mining
By R Halatchev
Production scheduling optimisation in open pit gold mining is a complex problem as it is driven by economic criteria reflecting particular economic interests of the concerned parties in the mining bus
Sep 26, 2013
-
Modelling the Initial Pit Design - The First Step for Project Valuation
By R Wolff
One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric
Jan 1, 2006
-
Pillar Extraction at the Doe Run Company, 1991-1998
By W L. Lane, T R. Yanske
The Doe Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining
Jan 1, 1998
-
A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysis
By S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen
Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result
Jul 1, 2021
-
Open Stoping with Associated Caving at Mount Lyell
Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce
Jan 1, 1982
-
A Remotely Operated Robotic Rock-breaker with Collision Avoidance for the Mining Industry
By A Boeing
Rock-breaker automation and remote operation improves the safety and efficiency of mining operations. This paper presents an overview of the Rocklogic rock-breaker automation system architecture that
Mar 24, 2014
-
Dredger drop impact on slope stability – Hazelwood Mine
By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
Twenty-five Years of Mine Filling: Developments and Directions
The sixth international symposium on mining with fill nearly coincides with the 25th anniversary of the Jubilee Symposium on Mine Filling. That symposium, held in August 1973 in Mount Isa, in part to
Jan 1, 1998
-
The Financing and Development of the Nagamble Gold Mine, Victoria
The Nagambie heap leach gold mine commenced production of gold in September, 1989. The mine,120km north of Melbourne in Victoria, Australia, was developed by Perseverance Mining Cor- poration Ltd, a
Jan 1, 1991
-
Specularitic Iron Ores and Shear Zones in the Quadrilßtero Ferrffero District
By F J. Rios
In the eastern high-strain domain of the Quadrilßtero Ferrffero, Brazil, hard and soft high-grade hematite ore may occur as schistose bodies in shear zones mainly related to the Cambotas-Fundpo thrust
Jan 1, 2005
-
The Dynamic Modelling of Caustic Concentration in the Bayer Process
By Blair J. R
In the Bayer process, bauxite is leached with caustic soda, forming a solution of sodium aluminate, from which hydrated alumina is precipitated. The efficient operation of the continuous form of th
Jan 1, 1977
-
Improved iron ore processing through digitalising conveyed ore flowsusing representative real time multi-elemental analysis
By H Kurth
High specification Prompt Gamma Neutron Activation Analysis (PGNAA) has been successfully applied to conveyed flows at iron ore operations since 2002 to representatively measure ore quality for improv
Sep 18, 2023
-
Design of raise caving operations in LKAB mines
By T Ladinig
Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st
Mar 29, 2023
-
Application of Time Series Methods for Smelter Furnace Modelling and Control
By Kam KM, Tran B
Statistical techniques of Box and Jenkins (1976) have been used to assess the existing control schemes and determine the dynamics of flash smelting furnace at the Kalgoorlie Nickel Smelter. Pertinen
Jan 1, 1996
-
Opportunities and Constraints for Regional Resource Synergies in Minerals Processing Regions
By S Harris, A Bossilkov
The Kwinana (Western Australia) and Gladstone (Queensland) industrial areas are among the few dozens of heavy industrial areas globally that demonstrate significant levels of regional resource synergi
Jan 1, 2006
-
The Murrin Murrin Nickel Cobalt Project
By Fazakerley VW
The Murrin Murrin deposit is located about 210 km NNE of Kalgoorlie and 50 km E of Leonora in the North Eastern Goldfields region of Western Australia at latitude 28¦ 50'S. longitude 121¦ 54&a
Jan 1, 1996