Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • AUSIMM
    The Network Centric Mine

    By G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly

    To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T

    Nov 20, 2012

  • AUSIMM
    Blast Design Parameters and Their Impact on Rock Fragmentation

    By B Prasad, M P. Roy, P K. Singh, C Drebenstedt

    Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper

    Aug 24, 2015

  • AUSIMM
    Exploration advances – MinEx CRC’s mission

    By D Giles, A C. Bailey

    In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus

    Nov 8, 2021

  • AUSIMM
    High-speed Video – An Essential Blasting Tool

    By S Wellink, D Chalmers, D Adermann, C Martin

    The practice of recording blasts for quality control purposes has been conducted for several decades. However, at the low frame rates of a standard video camera, essential data is frequently missed as

    Aug 24, 2015

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Ore Shoot Targeting by Recognition of Upflow and Outflow, Low Sulphidation Epithermal Gold Deposits

    By J V. Lawless

    Two types of low sulphidation epithermal deposits that have different gangue mineralogies and ore shoot geometries are recognised. One has laterally near-continuous ore shoots over a significant verti

    Jan 1, 1999

  • AUSIMM
    The Medium-Term Performance of Waste Rock Covers ù Rum Jungle as a Case Study

    By J Benn, V Kuznetsov, G Timms, A Spain

    Earthen covers are now widely used in the mining industry to control the generation rate and/or release rate of low quality drainage from piles of sulfidic minewastes. Covers are usually designed to r

    Jan 1, 2003

  • AUSIMM
    Dust Mitigation - Changing the Paradigm

    By J Visser

    Dust mitigation has long been seen as nothing more than managing a nuisance issue, but the reality is that poor dust management can lead to one or more of the following negative consequences: an incre

    Aug 12, 2013

  • AUSIMM
    A Review of BHP - Utah Coal Limited's Dragline Stripping Operations

    BHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut

    Jan 1, 1989

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Application of an Integrated Liberation Leach Model for Process Optimisation

    By T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen

    "The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model

    Oct 10, 2016

  • AUSIMM
    Resources and Reserve Assurance Processes – a Framework for Improved Governance

    By L J. de Lange

    As a material asset for mining entities, the resources and reserves (RR) estimation processes are surprisingly underrepresented in the assurance landscape. When press reports expose them being inaccur

    Jun 22, 2016

  • AUSIMM
    Successful Risk Management Through Project Life Cycle for Removal of the Crown Pillar at the Marvel Loch Underground Mine

    By S C. Barrie

    St BarbaraÆs Marvel Loch operations have successfully used longhole open stoping as the primary mining method for a number of years. A transition to Core and Shell mining was implemented in 2009 to re

    Nov 20, 2012

  • AUSIMM
    Quartz and Fluid Inclusions from Porphyry Deposits û Were Hydrosilicate Liquids Involved?

    By O V. Vasyukova

    Formation of porphyry-style ore deposits starts with the metal extraction from magmas at so-called magmatic-hydrothermal transition (MHT). The processes and compositions at MHT are difficult to study

    Jan 1, 2008

  • AUSIMM
    Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron Ore

    By A E. Petts

    Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro

    Jul 11, 2011

  • AUSIMM
    Value Impacts of Truck Limited Scheduling

    By P G. Doig

    Recent drops in commodity prices and economic uncertainty have seen many businesses re-evaluate their operational expenditure to ensure mine profitability. The high capital and operational cost of tru

    Jul 16, 2014

  • AUSIMM
    Building Sustainability Into a Project

    Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti

    Jan 1, 2004

  • AUSIMM
    Decoppering of Lead and Hard Lead by Stirring with Sulfur and Pyrites

    By Segnit ER, Jensen G

    The decoppering of soft and hard leads was investigated by stirring in an open pot, using sulfur or sulfur plus pyrites, or sulfur plus pyrrhotite, as reagents. Lead samples taken during the proce

    Jan 1, 1980