Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical Methods

    By A Garvie, D Kentwell, J Chapman

    "Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi

    Jul 10, 2012

  • AUSIMM
    Comparison of Semi-autogenous Mills Operations in Andean Countries

    By J Rayo

    Andean countries (Chile, Peru, Bolivia and Argentina) have 42 semi-autogenous mills (SAG) in operation and there are more than 30 projects in the pipeline that consider SAG mills. At the end of the ne

    Sep 1, 2014

  • AUSIMM
    Exploration and Mining Unified through Seismic Imaging

    By J Dwyer, G Turner, D Pridmore, M Urosevic

    Due to their ability to produce high-resolution images of the subsurface to great depths, seismic surveys provide critical inputs to almost all oil and gas exploration projects. However, with some not

    Nov 4, 2015

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    PC-BC: A Block Cave Design and Draw Control System

    This paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the

    Jan 1, 2000

  • AUSIMM
    Comparison of bubble coalescence time and thin film balance techniques in studying the interaction of flotation reagents and salt

    By G Bournival, Y Pan, S Ata

    A custom-made set-up that measures bubble coalescence time and the thin film balance (TFB) technique were used to explore the role of residual xanthate (potassium amyl xanthate, PAX) and salt (NaCl) o

    Aug 24, 2022

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    Practicalities of the use of fayalite slags for recovery of metals from urban wastes

    By E Jak, J Chen, B Hogg, S Nikolic, S Nicol

    The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge

    Jun 19, 2024

  • AUSIMM
    Use of alternative drilling technologies during diamond drilling activities at Ernest Henry Mine – a fractured aquifer case study

    By E Philippa, J Vitanza, C Hawtin, B Miller

    B Miller , E Philippa , C Hawtin and J Vitanza

    Mar 22, 2022

  • AUSIMM
    Vibration control blasting for low stability final walls

    By G Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Nov 30, 2018

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    Through Seam Blasting – Leighton Wahana Experience

    By S Agdaca

    Leightons is the sole contractor at the Wahana Coal Mine Project (part of the Bayan Group), a multi-seam thermal deposit consisting of 13 coal seams with thicknesses ranging from 20 cm to 500&#16

    Nov 8, 2011

  • AUSIMM
    Eco Underground Coal Mining Systems for Ultra-Thick Coal Seam – Utilisation of Flyash and CO2 Storage

    By A Hamanaka

    EGAT Mae Moh Lignite Mine in Thailand produces about 16 Mt of lignite annually from open-cut mining. The coal is used to generate 2400 MW of electricity. In the near future, however, the coal must be

    Nov 22, 2011

  • AUSIMM
    Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine

    It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic inv

    Jan 1, 1995

  • AUSIMM
    Unlocking Plant Capability through Targeted Debottlenecking of Arrium’s Magnetite Concentrator

    By C Jenkins, M Mativenga, C Stanton, J Gerber

    In 2014, Arrium completed an optimisation program on its magnetite concentrator, enabling a reduction in the overall cost base of producing concentrate through an increased ability to treat a wider ra

    Jul 13, 2015

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Investing in new process improvement technology: reducing the risk of implementation – a way forward

    By S H. Algie, E J. Knoblauch, I A. Lovatt, S G. Doig

    Mill operating teams are expected to engage in a perpetual quest for process improvement – pushing the boundaries of practical process limits and testing new technology to achieve the next step-change

    Aug 29, 2018

  • AUSIMM
    Case Study – Engineering Design for a Slurry Preparation Plant for a Paste Application in West Africa

    By G du Toit, P L. Gillot, M Swanepoel

    Randgold Resources’ Loulo-Gounkoto Complex is one of the largest gold mining operations in Mali, West Africa. The mine, which is situated on the western border with Senegal, treats more than 4 Mt/a of

    Sep 1, 2014