Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Three-Dimensional Model of MuckpileFormation and Grade Boundary Movement in Open Pit Blasting
By Kavetsky A
In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits, this is largely dependent on muckpile shape and looseness with
Jan 1, 1989
-
Upstream Raising of Laterite Nickel Tailings Storage Facilities
By D A. Williams, J C. J Boshoff
The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad
Jul 27, 2015
-
Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia
By A Wanninayake, E Novello, I Gillani
A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western
Aug 12, 2013
-
Canada's Mineral Policy Since 1945 - Forty Years of Evolution
Responsibility for the administration of mineral resources is divided between federal and provincial governments. The paper traces the evolution of mineral policies at both levels of government, f
Jan 1, 1986
-
Wallaby - The Horizontally Challenged Opportunity
Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme
Jan 1, 2008
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fill
By D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Ernest Henry Underground Mine – Access and Support Infrastructure Design
By P Christen
The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in
Mar 21, 2011
-
Dynamic Simulation of Size Reduction Operations from Mine to Mill
By Pate W. T
This paper describes the development of a dynamic flowsheet simulator for comminution operations. Object oriented software design allows the handling of multiple ore types, blended into multicompone
Jan 1, 1998
-
A Tracer Study of Discharge Segregation from a Paul Wurth Hopper
By Jones JJ
A laboratory study of size segregation is described using a model of a Paul Wurth hopper industrailly employed for blast furnace charg- ing purposes. Experimental charge materials used in the study
Jan 1, 1984
-
A Seismic Source Wavelet with Applications to the Modelling of Blast Vibrations
The blasting process involves a complex interaction of a delayed sequence of moving sources of seismic energy which produce nonlinear behaviour near the blast holes. A deterministic description of t
Jan 1, 1990
-
Transforming dust control – lessons from tunnelling
By A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Fundamental Study on Granulation of Sinter Raw Material Mixture
By Sato S, Kawaguchi T
The granulation and bed-permeability of sinter raw materials depend on interactions between the properties of various iron ores and water. The properties of individual iron ores are controlled by
Jan 1, 1980
-
Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)
By D Audeyev
The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op
Oct 5, 2011
-
This Life of Mine - Personal Reflections on The Well-Being of the Contracted Fly-In, Fly-Out Workforce
By R Goater, P Kirsch, S Goater, I Goater
With staff productivity and retention a crucial factor in the longevity of AustraliaÆs mining industry, some mining companies are increasing their focus on the health and well-being of their people, t
Sep 18, 2012
-
Building a Geometallurgical Model for Early-Stage Project Development – A Case Study from the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru
By R Baumgartner
The Canahuire deposit is a recently discovered Au-Cu-Ag epithermal deposit in Southern Peru. A geometallurgy program is a key study element of the project Feasibility study. Metallurgical, mineralogic
Sep 5, 2011
-
Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources
By A J. Ryan
The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti
Jan 1, 1998
-
A New Technique to Combat Methane Gas Hazards
By Forrester P. I, Richardson W
Methane in coal mines is an ever present hazard resulting in loss of lives and serious economic consequences. For effective control of methane, ventilation alone may not be totally adequate in som
Jan 1, 1988
-
Productivity improvement through collaborative shift planning and tracking
By E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Adaptation of an Open Pit Optimiser for Underground Strategic Planning
By M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
A Review of Sublevel Stoping
A review of the factors controlling stope wall behaviour such as excavation geometry, rockmass strength, induced stress, ground support, blast damage and drill drive layout is undertaken. In addition,
Jan 1, 2000