Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Distinguishing Monolayer and Multilayer Adsorption of Thiol Collectors With ToF-SIMS and XPS

    By R N. Lamb, A N. Buckley

    Experiments have been carried out to establish whether time-of-flight secondary ion mass spectrometry (ToF-SIMS) is able to differentiate monolayer and multilayer coverage of thiol collectors on sulfi

    Jan 1, 2005

  • AUSIMM
    Internalising Ecological Costs in Evaluating and Planning a Mining Project

    By Q Wang

    Net present value (NPV) has been the main criterion in mining project evaluation and production plan optimisation. It is a common practice in NPV calculations to take into account only the tangible co

    Sep 26, 2011

  • AUSIMM
    The Geology and Mineralisation of the Carina Iron Deposit, Yilgarn Mineral Field,Western Australia

    By J Lea, D C. Kettlewell

    The Carina iron ore deposit lies 105 km northeast of Southern Cross, WA. The area designated the Yilgarn Iron Ore Project (YIOP) is comprised of five prospects along an east-southeast trending greenst

    Jan 1, 2009

  • AUSIMM
    Adding Value in Hydrometallurgy

    In this paper, three types of value-adding in the minerals industry are discussed: downstream processing, improving the efficiency of existing processing and increasing the knowledge base and expert

    Jan 1, 1995

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Using a Coal Mine Safety Regime Approach to the Management of High-Voltage Electrical Isolation

    By J Joy, D Griffiths, A Bye, G V. Kizil

    Poor standards of electrical installation and maintenance continue to contribute to electrical related fatalities and injury risk in the mining industry. Electrical isolation has the potential to init

    Nov 20, 2012

  • AUSIMM
    Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA

    By W L. Daniels, C Stilson, C Zimmerman

    Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car

    Jul 10, 2012

  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, Australia

    By S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c

    Jan 1, 2005

  • AUSIMM
    Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, Victoria

    By D J. Clark, R F. Wright, M D. Goodz

    The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8

    Jan 1, 2009

  • AUSIMM
    Effect of mill-scale and calcined dolomite on high Al2O3 sinter and its reduction behaviour

    By S J. Kim, S W. Kim, L Tomas da Rocha, S Jung

    Al2O3 has been regarded as a harmful gangue component in iron ore, especially causing reduction degradation in industrial sintering of iron ore. The current study aimed to utilise low-grade iron ore c

    Jun 19, 2024

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010

  • AUSIMM
    Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold Concentrator

    By A Murphy, D Lauder, J Miranda

    Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro

    Jan 1, 2000

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016

  • AUSIMM
    The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and Provenance

    By N Donnellan

    The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t

    Jan 1, 1994

  • AUSIMM
    Advanced Customisable Leach Columns – A New Kinetic Testing Method to Simulate Site-specific Conditions

    By J Pearce, M Barteaux, S Pearce

    The prediction of how waste materials will evolve geochemically within waste storage facilities has been the subject of hundreds of thousands of hours researched by geoscientists globally. Despite the

    Jul 27, 2015

  • AUSIMM
    Environmental Impact of the Imperial Smelting Process

    By Bishop D. J

    The Imperial Smelting Process for the simultaneous production of zinc and lead is probably regarded by the ecologist as a necessary evil with the benefits of its products marginally outweighing the

    Jan 1, 1993

  • AUSIMM
    Reconstruction of Morphetts Enginehouse, Burra

    Burra was the largest metalliferous mine in Aus- tralia between 1845 and 1860 and employed as many as 1000 men and boys. The workforce was predominantly Cornish, Burra being the first con- centratio

    Jan 1, 1987

  • AUSIMM
    The dynamic behaviour of the load in a pilot ball mill as a function of axial position and design and operating variables

    By Montini A

    The dynamic behaviour of the load in a pilot-scale ball mill has been measured as a function of axial position within the mill, end plate lifter design, load volume J (percent of mill volume), per

    Jan 1, 1986