Search Documents

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920

  • ABM
    MICROESTRUTURA, MICRODUREZA E PARÂMETROS TÉRMICOS DA LIGA DE SOLDA Sn-40%Bi-2%Ag

    By Vítor Covre Evangelista da Silva

    Esta proposta objetivou desenvolver uma análise teórico/experimental da influência de 2% Ag (em peso) em uma liga de solda Sn-40%Bi solidificada unidirecionalmente em regime transitório de fluxo de ca

    Aug 16, 2017

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • AIME
    Some Observations In Ore Search - Symposium

    By L. C. Graton

    [CONTENTS PAGE INTRODUCTION AND ACKNOWLEDGMENTS. By George M. Fowler2 Question 1-Is Structural Deformation of Some Character Always Necessary for the Migration of Mineralizing Solutions, Especial

    Jan 1, 1940

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • DFI
    Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support Slurries

    By K. Englehardt

    J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth

    Jan 1, 1991

  • CIM
    Mineral resource + engineering, economic and legal feasibility = ore reserve

    By M. Vallée

    Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio

    Jan 1, 2000

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    802.11 Wireless Site Survey Methodologies in an Underground Mine Environment

    By Mark G. Lafontaine

    Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as

    May 1, 2013

  • NIOSH
    RI 5993 Purification Of Electrolytes For The Deposition Of High-Purity Nickel ? Summary

    By J. G. Donaldson

    Nickel containing less than 0.01 percent of total metallic impurities was produced at the Rolla Metallurgy Research Center of the Bureau of Mines by electrodeposition from purified electrolytes. The f

    Jan 1, 1962

  • SME
    Coal (Coal production by coal-producing regions, 2001)

    With the dawning of a new century came the beginning of a new era in the coal industry. Instead of the traditional practice of only buying and selling produced coal in the United States, a coal futur

    Jan 1, 2002

  • SME
    Design Aspects Of Underground Rescue Chambers

    By A. D. S. Gillies

    The use of refuge chambers for use in handling underground emergencies is an issue of topical relevance within the US mining industry. Chamber design is of importance to meet some new safety requireme

    Jan 1, 2012

  • IIMP
    Computer application on exploration from project generation to the consolidation of a mining projects

    By Rogerio Castejón

    The evolution on the computer in the last 10 years have caused a big change on the way the mining companies are doing exploration. The following factors have contributed to that change: the downgrade

    Aug 25, 2002

  • AIME
    Blast-Furnace Practice

    By Chas. B. Dudley

    A Discussion of the papers of Mr. James Gayley, on "The Application of the Dry-Air Blast to the Manufacture of Iron," and of Mr. J. E. Johnson, Jr., on "The Physical Action of the Blast-Furnace," by M

    Sep 1, 1905

  • SAIMM
    Research on visual simulation of coupled solid deformation and gas leak flow in parallel coal seams

    By P. Sun

    Abstract: From the viewpoint of interaction mechanics of solid and gas, a coupled mathematical model is presented for coal/rock mass deformation and gas leak flow in parallel deformable coal seams. Nu

    Jan 1, 2003

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • AUSIMM
    Circored« and Circofer« Two New Fine Ore Reduction Processes

    By Weber P, Sneyd S

    The total world steel production in 1998 amounted to approximately 780 000 000 t. The share of electric steelmaking was in the range of 35 per cent and is expected to increase further to over 40 pe

    Jan 1, 1999

  • SME
    Large-Diameter Tunneling Collapses: Recovery Design and Execution

    By Bradford F. Townsend

    A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed

    Jan 1, 2008

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008