    Performance of fully mechanised rock reinforcement using self-drilling anchors with pumpable resin technology

    By P Jere

    Mechanically coupled rock bolts encapsulated in cementitious or polyester cartridge resin grouts have been widely adopted for various underground rock reinforcement applications. Resin grouts are cons

    Mar 29, 2023

  • AUSIMM
    Operational readiness – what is it and how to get it done?

    By A G. L Pratt

    Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f

    Mar 29, 2023

  • AUSIMM
    The design and implementation of the Kibali gold mine off-shaft development

    By T Peters

    The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with

    Mar 29, 2023

  • AUSIMM
    Integrated multi-disciplinary auditing and benchmarking of catastrophic hazards for underground mining operations

    By A R. Penney

    Safety management, both personal and that associated with catastrophic hazard, helps to define the success of mining companies. Personal safety management, often categorised by slips, trips and falls,

    Mar 29, 2023

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    Challenges and solutions for deformation management of Cannington’s hoisting shaft

    By A Clarkson

    Cannington Mine is an underground silver lead zinc operation located in north-west Queensland which has been in production since 1997. Ore is primarily moved through an underground material handling s

    Mar 29, 2023

  • AUSIMM
    A global review of productivity and operational performance in sublevel caving mines

    By A D. Campbell

    The sublevel caving (SLC) mining method is becoming more widely adopted as an underground mining method as mines become deeper and target lower grade mineralisation. SLC has been successfully adopted

    Mar 29, 2023

  • AUSIMM
    Management of dilution and mining recovery to maximise value

    By R Urie

    Dilution and loss of ore during the mining process invariably occur in all underground mining operations. This dilution and ore loss can have a significant effect on the performance and value generate

    Mar 29, 2023

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023

  • AUSIMM
    Friction rock stabiliser QAQC and a process to investigate high pull test failure rates

    By R Varden

    Friction rock stabilisers, commonly termed ‘Split Sets’, friction rock bolts, or continuous friction coupled bolts are the most widely used rock bolt in the Australian underground metalliferous indust

    Mar 29, 2023

  • AUSIMM
    Intersection reinforcement with self-drilling anchors for improved productivity at Kanmantoo

    By J Jardine

    An improved ground support method for development intersections, wide spans and stope brows was implemented at Kanmantoo mine. The method uses a jumbo to simultaneously drill and install self-drilling

    Mar 29, 2023

  • AUSIMM
    Dashboards, data sources and a modern data platform

    By D Bruce

    OZ Minerals’ Carrapateena mine is a Sublevel cave mine located in South Australia, approximately 160 km north of the regional centre of Port Augusta. Carrapateena commenced underground development in

    Mar 29, 2023

  • AUSIMM
    Reverse stoping using wireless initiation at CSA Mine

    By B Small

    CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca

    Mar 29, 2023

  • AUSIMM
    Near field blast vibration monitoring for slot or winze blast analysis

    By E Wargem

    The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is

    Mar 29, 2023

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    The future is electrifying – introduction of a battery electric loader to CSA Mine

    By M Ireland

    Extensive use of diesel-powered mobile equipment in modern mines for materials handling, such as load-haul-dump machines, constitute a significant source of heat, exhaust gases and diesel particulate

    Mar 29, 2023

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared