Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • SME-ICGCM
    Application Of Computer Programs For Rock Pressure Control

    By V. M. Shick

    For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr

    Jan 1, 1996

  • SME-ICGCM
    Ground Control for Muliple Seam Mining in German Coal Mines

    By Holger Witthaus

    There is more than a century of experience in multiple seam mining in Germany. In several mines up to 20 seams had been excavated within the last decades. Due to the nature of the deposit and the hist

    Jan 1, 2007

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • SME-ICGCM
    Reflections on the Application of Geophysics to Ground Control

    By Peter Hatherly

    As a discipline, geophysics covers an enormous range of scales and applications - from planetary geophysics through to the monitoring of acoustic emissions of rock samples. Although it is not a core d

    Jan 1, 2006

  • SME-ICGCM
    Subsidence Control Over Abandoned Mines

    By Victor V. Nazimko

    Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for

    Jan 1, 1996

  • SME-ICGCM
    Towards a Real Time Response to Changing Strata Conditions on a Longwall

    By P. Trueman

    A project is underway to convert a validated methodology to a system that will permit the near real time interpretation of loading data from longwall powered supports, allowing rapid adaptation of min

    Jan 1, 2006

  • SME-ICGCM
    The Influence Of Massive Sandstones In The Main Roof On Longwall Support Loading

    By A. M. Richardson

    The significance of a massive sandstone unit in the immediate roof to longwall support weighting is well known. If the unit lies in the main roof above the zone of caving, its influence becomes more d

    Jan 1, 1996

  • SME-ICGCM
    Surface Fracture Development From Mine Subsidence In Eastern Kentucky

    By Clyde DeRossett

    Surface fractures, sometimes of significant size, are observed in eastern Kentucky over high extraction areas. Field observations were correlated with mine maps and a regional subsidence prediction co

    Jan 1, 1993

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    Hydraulic stowing - A solution for subsidence due to underground mining in the USA

    By Kausik M. Sinha

    Hydraulic stowing, which is being practiced in several major coal producing countries to deal with adverse mining conditions, usually permits almost 100% coal recovery from underground mines with mini

    Jan 1, 1989

  • SME-ICGCM
    Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining

    By Victor V. Nazimko

    Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Geostatistical Methods For Hazard Assessment And Site Characterization In Mining

    By Jennifer Riefenberg

    Ground control hazards, coal quality, ore reserve estimation, and pollution modeling seem unrelated topics from most mining perspectives. However, geostatistical methods can be used to characterize ea

    Jan 1, 1996

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • SME-ICGCM
    Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern Appalachia

    By H. J. Siriwardane

    This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element

    Jan 1, 1988

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Roof Control In Longwall Faces - Geological And Geotechnical Characteristics And IT Solution For Prediction (50d59152-95b6-444a-a8f2-4ae0c4262f3f)

    By Holger Witthaus

    Various seam conditions had been examined during longwall production at RAG German hard coal mines. Based on the field data a prediction method was developed considering separation planes as influenci

    Jan 1, 2009

  • SME-ICGCM
    Surface damage due to longwall mining - A case study

    By P. M. Lin

    A subsidence monitoring program over a longwall panel was established (1) to explore the impacts of dynamic subsidence on the ground surface and structures and (2) to correlate the movements between t

    Jan 1, 1989

  • SME-ICGCM
    Coal Mine Bumps: Case Histories of Analysis and Avoidance

    By David Newman

    In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea

    Jan 1, 2008