Minimising The Environmental Impact Of Construction Dewatering
By Peter Jackson
The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater
Jan 1, 2000
-
Case History: Foundations For The New Mississippi River Bridge, St. Louis
By Paul J. Axtell
This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c
Jan 1, 2011
-
Improved Pile Economics: High Design Stresses And Remote Pile Testing
By Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Material Properties for Analysis of Deep Mixing Support Systems
By Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh
"This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine
Jan 1, 2015
-
The Analysis Of Results From Routine Pile Load Tests
By Bengt H. Fellenius
THIS PAPER deals with the analysis of results from axial testing of vertical single piles, i.e. the most common field test per-formed. Despite the numerous tests which have been carried out and the ma
Jan 1, 1988
-
Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia
By Mario Terceros H, Bengt H. Fellenius
"ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su
Jan 1, 2014
-
Hybrid Shoring Solutions for a Challenging Excavation Project Adjacent to a Subway – 21 Avenue Road, Toronto
By Graeme Smart, Thomas Fiala
"Yorkville Plaza II, a 40-storey signature condominium residence, is scheduled to open on Avenue Road in Toronto’s prestigious Bloor-Yorkville neighbourhood in spring 2017. In close proximity to Toron
Jan 1, 2015
-
High Risk Control For Piling And Deep Foundations - A Systematic Approach
By Martin van Staveren
In today's rapid changing construction world, the business pressures on piling and deep foundations reach sky-high levels. Ever increasing complexity of construction projects do severely contribu
Jan 1, 2006
-
Drilled Shaft Difficulties and a Micropile Solution
By Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Lateral Load Tests On Drilled Piers In San Diego Area Residual And Formational Soils
By Kul Bhushan
This paper presents the results of lateral load tests on 0.61-m to 1.27-m (24 to 50-inch) diameter drilled and cast-in-place piers in San Diego area residual/formational soils. The test piers were ins
Jan 1, 2002
-
Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction
By Hessam Yazdani
In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations
Jan 1, 2013
-
Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With Defects
By Khamis Y. Haramy
Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled
Jan 1, 2007
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary
By Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
The Effect Of Drilling Fluid On Axial Capacity, Cape Fear River, NC
By Dan Brown
Two drilled shaft foundations were subjected to axial load tests in order to measure the influence of drilling fluid on performance. Other than the differing drilling fluids, the shafts were construct
Jan 1, 2002
-
Pile Load Testing Of Helical Piles And Driven Steel Piles In Anchorage, Alaska
By Mohammed Sakr
The use of helical piles for permanent foundation applications has become a practical and feasible alternative to the traditional cast-in-place concrete or driven steel piles. Research and development
Jan 1, 2009
-
A Need To Reevaluate Attitudes In Engineering And Construction
By d&apos, E. Appolonia
A construction project is successful when all parties contributing to it are winners. It is not a success when there are winners and losers. Contractors, engineers, suppliers and equipment developers
Jan 1, 1985
-
Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.
By Alexander J. Verstraeten
The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev
Jan 1, 1987
-
Use of Porous Concrete in Secant Bored Pile Walls
By Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen
"Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to
Jan 1, 2017
-
Unusual Dolphin Monopile Structure
By C. T. Christensen
The paper gives an outline of the design, installation and performance of a series of mooring and berthing dolphins for a major ferry berth outside the port of Elsinore, Denmark. The Dolphins are larg
Jan 1, 1989
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits
By Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992