Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne Interchange
By Travis Coleman, Elvis Ishimwe
Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic
-
Geospatial Project Information Management System At Herbert Hoover Dike
By Jamey Rosen
A Project Information Management System (PIMS) was developed to manage and analyze QC data at the Herbert Hoover Dike Rehabilitation Dam Modification Cutoff Wall (owned by the Jacksonville District of
-
Installation and Efficiency of Common Helical Pile Couplings
By Jason Herron, Joseph Brown
The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,
Jan 1, 2019
-
Nyct's 207th St Yard Floodwall
By Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled Shafts
By Alex Ryberg, Matthew L. Becker
Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to
Sep 8, 2021
-
Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.
By Jim Bruce
This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss
Jan 1, 2004
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy
By James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
Augered Pressure Grouted Piles In Complex Glacial Soils - A Case Study - 1. Introduction
By Peter J. Jancich
This paper describes the installation of high capacity Augered Pressure Grouted piles which support structural loading from a four level parking garage in west-central DuPage County, Illinois. The sub
Jan 1, 1991
-
Design And Construction Constraints Imposed By Unique Geologic Conditions In New York City - Synopsis
By George J. Tamaro
The design and construction of foundations in the New York City area are usually dictated by the widely varying geologic conditions encountered in the five boroughs, particularly along the spine of Ma
Jan 1, 2000
-
Session 22 "Compaction Grouting and Limited Mobility Grouting"
By Allen Cadden
The type of soil we had was a silty fine sand. It had been placed by hydraulic methods in 1904 so it was quite clean I would say less than 10% silt the rest of it was very loose sand. That I'm n
Feb 10, 2003
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line
By Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling
By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior
A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten
-
Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project
By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang
During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati
Jan 1, 2019
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam
By Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Innovative Design for Retaining Structures using Combined Products
By Clifford Taylor, Alexander Zöhrer
"The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such
Jan 1, 1900
-
Deep Mixing in the United States: Milestones in Evolution
By Donald A. Bruce
"The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong
Jan 1, 2015
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium
By Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Excavation Risks Adjacent to Existing Structures in Illinois and Urban Environments - Identifying and Managing Technical and Legal Issues
By James P. Chivilo, Gregory R. Meeder, Scott J. DiFiore, Matthew H. Johnson
New construction in metropolitan areas has direct impacts on immediate neighbors and abutters. While noise and dust are generally nuisance concerns, demolition, vibrations, excavation, and dewatering
Jan 1, 2019
-
Utilizing Drones to Improve Project Workflows
By Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Practice Of Arranging Drilling Piles In Subsiding Grounds
By Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002