Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Vibration Isolation at the Dana-Farber Yawkey Center: OPA Finalist

    By David R. Shields, Michael T. Bracher

    "The $330 million (U.S.) Dana-Farber Cancer Institute’s Yawkey Center for Cancer Care (Yawkey Center) sits in the heart of Boston’s Longwood Medical Area. The Yawkey Center is a cutting-edge cancer ca

    Jan 1, 2012

  • DFI
    Installation Effects of Drilled Screw Pile In Soft Clay

    By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen

    "Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h

    Jan 1, 2015

  • DFI
    Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, Turkey

    By Carlandrea Albonico, Salvatore Miranda

    The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc

    Nov 1, 2022

  • DFI
    Micropile Transmission Foundations In Environmentally Sensitive, Challenging Terrain

    By Esam Abraham

    A 13.6 mile portion of the 500 kV Tehachapi Renewable Transmission Project crosses the mountains of the Angeles National Forest. Access and environmental constraints precluded road development for mo

    Jan 1, 2010

  • DFI
    Evaluation Of Causes Of Bleeding Of Free Water From A Bentonite Slurry

    By Tony P. Suckling

    This paper describes an investigation into the bleeding behaviour of bentonite slurry observed on a trial diaphragm wall panel. The bleeding is thought to be due to the bentonite experiencing a chemi

    Jan 1, 2011

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Construction Of Cast-In-Place Piles With Enlarged Bases

    By H. Mori

    Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding

    Jan 1, 1989

  • DFI
    Remedial Drilling and Grouting at Abiquiu Dam, Nm and Fluid Losses in the Embankment, A Case History

    By Suzanne R. Hess-Brittelle, Sharon L. Schulz, Tyler J. Quick, Amy F. Ebnet

    "Abiquiu Dam is a rolled earth fill dam with impermeable core located on the Rio Chama in New Mexico. Abiquiu has had a history of excessive seepage through the fractured sandstone abutments since wat

    Jan 1, 2016

  • DFI
    Approximate Assessment Of Basement Wall Effects On Foundation Performance

    By Helen S. W. Chow, Harry G. Poulos

    Most modern buildings involve the construction of a basement, often of several levels, to maximize the floor area ratio. The basement walls are generally designed for excavation retention purposes onl

    Nov 1, 2022

  • DFI
    Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, California

    By Michael Forrest, John Roadifer, Glen Gorski

    "The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d

    Jan 1, 2015

  • DFI
    Jet Grout For Soil Mass Stabilisation To Support Power Plant Foundation

    By Vishal Pathak, Shailesh A. Godhuly

    Ground Modification System in terms of Jet Grouting for soil strengthening and mass stabilization was engaged for a power plant project in an international power project, engineered by L&T-S&L. The si

    Sep 1, 2022

  • DFI
    Interpretation and Evaluation of Thermal Integrity Profiling Measurements

    By Seth Robertson, Daniel Belardo, Travis Coleman

    Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust

    Sep 8, 2021

  • DFI
    Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison

    By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL

    Sep 8, 2021

  • DFI
    Investigation Of Recycled Plastic Piles For Support Of Structures In Expansive Shale Environments

    By Eric Brandner

    Expansive soil formations can be found throughout the United States. When subjected to wetting, many of these formations have the potential to swell and exert large uplift forces which can significan

    Jan 1, 2009

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Experience-Based Value Engineering of Foundations & Deep Excavation Support Systems

    By Abdulazeez Rotimi, Barry Sheppard, Abid Adekunte

    Good engineering practice is a function of sound theoretical knowledge, first-hand experience on previous projects of similar scope and scale, good acquaintance with case histories of similar projects

    Sep 8, 2021

  • DFI
    Pile Set-Up to Optimize High-Rise Bridge Design

    By Charles Winter

    The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a

    May 1, 2022