Organization
  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • CIM
    Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter

    By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi

    This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel

    Jan 1, 2019

  • CIM
    Properties of Some High Aluminum Zinc Base Die Casting Alloys

    By O. A. Carson

    "IntroductionTHE ZINC-BASE die casting alloys in common usage contain approximately 4 per cent aluminum as the major alloy element. In addition, they contain about 0.05 per cent Mg .and may• have a sm

    Jan 1, 1953

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Characterization and Empirical Analysis of Block Caving Induced Surface Subsidence and Macro Deformations

    By K. Woo

    The increasing move to block cave mining methods (including sublevel and panel caving) to access deeper and lower grade ore deposits as near surface sources become exhausted raises questions as to the

    May 1, 2009

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • CIM
    Suitability of PEM Fuelcells for Underground Mining Vehicles

    By Marc C. Bétournay

    Hydrogen fuelcells are a known technology, having been applied to stationary (e.g equipment, buildings, power plants) and vehicle applications (e.g transit buses, space shuttles). There is currently a

    May 1, 2003

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Abstract Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queu

    Oct 1, 2009

  • CIM
    A Queuing Network Model for Shovel-Truck-Crusher Systems in Open-pit Mining

    By Jiwen Zhang

    Due to the blocking nature at the crusher station, straightforward application of queuing theory cannot give realistic results on the performance of a shovel-truck-crusher system. A new queuing networ

    Oct 1, 2009

  • CIM
    Enhanced Gravity Recovery of Base Metal and Industrial Minerals

    "Mineral separation by exploiting the differences in mineral or metal specific gravities (sg) has been used since antiquity. In the modern era, this is most commonly seen in the recovery of gold by t

    Jan 1, 2017

  • CIM
    Long-Range Terrestrial Digital Photogrammetry for Discontinuity Characterization at Palabora Open-Pit Mine

    By M. Sturzenegger

    This paper documents a field survey using long-range terrestrial digital photogrammetry at the Palabora open-pit mine, South Africa, for multi-scale characterization of rock mass discontinuities. Ster

    May 1, 2009

  • CIM
    Leaching of a Gold Ore Using the Hydrogen Sulfide-Bisulfide-Sulfur System

    By P. West-Sells, B. Wassink, N. Fisher

    Gold leaching from a commercial cyanide-amenable gold ore was studied at 25°C using sodium bisulfide-hydrogen sulfide solutions containing elemental sulfur. Gold extraction from the ore using 0.55 M N

    Jan 1, 2005

  • CIM
    Application of On-Line Visualization To Flotation Systems

    By Jacob Masliyah, Zhiang Zhou, Dharamdat Christendat, Tshitende Kasongo, Kevin Hyland, Zhenghe Xu, Ted Kizior, Douglas Cox

    "A novel on-line visualization system, previously developed at Syncrude Canada Ltd., has been modified to characterize rising bubbles, particles and particle-bubble aggregates in a flotation process.

    Jan 1, 2000

  • CIM
    Froth Based Indicators as a Tool for Flotation Diagnosis

    By Patrick Pelletier Jr., Pierre-Alexandre Bossé, Gianni Bartolacci, Ian Orford, Steve Parent

    "Over the last decades, many authors have shown the importance of froth in the flotation process. Mineral recovery is related to froth recovery and flotation. Selectivity is affected by froth characte

    Jan 1, 2006

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case History

    By E. Bongajum

    We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical

    May 1, 2009

  • CIM
    Rotating equipment reliability for surface operation. Part I: Vibration analysis for rotating equipment

    By D. Prince, G. Nollet

    "Since 1994, Aur Ressources has operated Louvicourt mine, a zinc and copper mine close to Val d’Or, at a rate of 4300 t/d. Ever since the start-up of the plant, management has encouraged innovative ap

    Jan 1, 2002

  • CIM
    Fluid Inclusion and Stable Isotope Study of the Buffalo Gold Deposit, Red Lake Greenstone Belt, Northwestern Ontario, Canada

    By G. Chi, A. Solomon, J. Lai

    "The Buffalo gold deposit is a small deposit consisting of auriferous quartz-tourmaline veins within a granodiorite stock in the Red Lake greenstone belt. This study aims to characterize the mineraliz

    Jan 1, 2009

  • CIM
    An Open Platform for Underground Vehicle Monitoring

    By Lorrie Fava

    Two needs in the mining industry, to enable overall process improvements, are open systems and network connectivity in underground mines. The Pando project, a collaboration between Symboticware, Vale

    Oct 1, 2010

  • CIM
    The Outlook For Zinc

    By H. M. Lewis

    The current status of the international zinc market is summarized, and a supply /demand outlook is presented for the next five years. A number of technical problems facing the industry are outlined.

    Jan 1, 1978