Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Fluxing of Iron Ore Gangue By Dolomitic Limestones

    By P. D. S. St. Pierre

    IN REGENT YEARS, blast furnace operators have found it necessary to improve their technology in order to handle increasingly low-grade feed and yet satisfy the demands for greater tonnages of metal. S

    Jan 1, 1956

  • CIM
    Trace Copper and Zinc 1n the Coronation Mine Overburden

    By B P. Scott

    Podsol soil horizons developed on Pleistocene glacial sediments overlying the Coronation Mine orebody were analyzed for copper and zinc spectro-photometrically, using biquinoline-isoamyl alcohol and d

    Jan 1, 1965

  • CIM
    Sinking of a Circular Air Shaft to No. 12 Colliery at New Waterford, N.S.

    By W. C. Risley

    IN the year 1933, workings at the No. 12 colliery, New Waterford, of the Dominion Coal Company, Limited, had advanced to a point where additional ventilation would soon be required. Furthermore, devel

    Jan 1, 1936

  • CIM
    Full-Face Boring by the Undercutting Method

    By P. O. Sandstrom

    "Atlas Copco is introducing a new patented method for full-face boring. This paper presents the basic principles of the boring action and discusses the present experience regarding performance and cos

    Jan 1, 1971

  • CIM
    Study on the Large Industrial Bioreactor

    By Q. F. Wang, M. H. Lai, T. Q. Liu, G. G. Dong

    Compared with the traditional pre-treatment process, biological oxidation process has many advantages including higher gold recovery, less cost, easier operation. The bio-oxidation reactor is the most

    Jan 1, 2015

  • CIM
    Elk River Colliery

    By W. C. Whittaker

    COMPLETED in November, 1943, at a cost of over $1,500,000, Elk River colliery of the Crow's Nest Pass Coal Company, Limited, has been laid out and equipped for an ultimate annual production of 1,

    Jan 1, 1944

  • CIM
    Televigile - An Automated System for Remote Surveillance and Information Gathering in Mines

    By R. Tervo, G. Ellie

    "Automated information systems are being developed very rapidly in Europe. In France, Belgium and West Germany, more than 70% of the coal production is controlled by these installations. Information o

    Jan 1, 1973

  • CIM
    Non-Oxidative Acidic Treatment of Copper Sulfide Concentrates in the Flotation Circuit

    By A. Luszczkiewicz

    This paper presents the beneficial effects of non-oxidative leaching of final and intermediate copper sulfide concentrates with sulfuric acid prior to the final cleaning stage of flotation. This uniqu

    Jan 1, 2007

  • CIM
    Industrial Conditions In The Crow's Nest Pass Coal-Field

    By Robert Strachanm

    The East Kootenay coal-field, situated close to the boundary between the provinces of Alberta and British Columbia, is composed of four small areas locally called the Crow's Nest Pass, the Upper

    Jan 1, 1924

  • CIM
    Estimating Thermodynamic Properties of Slags by Empirical Methods

    By J. W. Matousek

    The heat content of the waste slag from a typical smelting operation methods for estimating the thermodynamic properties of smelting slags, to include: -- heats of formation -- heat capacities (sp

    Jan 1, 2007

  • CIM
    Mechanical Strength of Green Iron Ore Pellets ? A New Approach

    By Mathieu Dubé

    Good mechanical strength of green iron ore pellets is required to avoid breakage and excessive deformation during their handling and further processing. However, green balls with good resistance to ha

    May 1, 2007

  • CIM
    The Mobilization and Potential “In-Autoclave” Recovery of Gold during Pressure Oxidation and Leaching of Auriferous Sulfide Materials

    By J. -C. Parisien-La Salle, D. Blais, G. P. Demopoulos

    "In this work the dissolution, precipitation and adsorption behaviour of gold in acidic iron sulphate media containing small amounts of chloride ions is investigated via batch laboratory tests and OLI

    Jan 1, 2012

  • CIM
    Risk Identification Expert System for Metro Construction Based on BIM

    By Limao Zhang

    This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk ident

    Aug 1, 2013

  • CIM
    Petroleum Possibilities? in Mackenzie River Valley, N.W.T .

    By J. S. Stewart

    THE Mackenzie River Valley proper extends from Great Slave lake to the Arctic ocean (see map, Figure 1). From Fort Providence, near Great Slave lake, to Aklavik, near the Arctic coast, the distance

    Jan 1, 1944

  • CIM
    Review of High Pressure Tuyere Injection

    By A. E. M. Warner, I. E. Hills, C. L. Harris

    Since the late Dr. Keith Brimacombe, et al, performed tests at the now-closed Asarco Tacoma smelter and the Inco Copper Cliff Smelter on Peirce-Smith copper converters almost thirty years ago, many Py

    Jan 1, 2007

  • CIM
    Mechanical properties of 3XX aluminum alloy test bars from the ASTM B108 and a modified mould in as-cast and heat-treated conditions

    By D. Emadi

    The ASTM B108 Mould and a Modified Mould were used to cast test bars under a variety of conditions: mould and pouring temperatures, mould coating and tilt. Mechanical properties were determined in the

    Jan 1, 2004

  • CIM
    Lithogeochemical patterns associated with the Darrehzar porphyry Cudeposit, Pariz area, Iran

    By H. Ranjbar

    The Darrehzar porphyry Cu deposit is situated in the Urumieh-Dokhtar magmatic suite of Central Iran. The REE and trace element data suggest that the deposit lies within a continental margin setting. P

    Jan 1, 1997

  • CIM
    The Engineer and the Diamond Drill in Northern Ontario

    By C. H. Hopper

    DIAMOND drills have played an important part in the development of mines for many years. Recently. they have also entered the production field arid the use of diamond drills m the primary breaking of

    Jan 1, 1943

  • CIM
    Design Methods for DC Arc Furnaces to Enhance Furnace Integrity

    By Q. G. Reynolds, R. T. Jones

    The choice of furnace design parameters has a marked effect on the integrity of the furnace that is constructed. The design methodology for DC arc furnaces typically begins with the chemical reactions

    Jan 1, 2015

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019