Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Integrated Optimisation of Grinding and Flotation Circuits
By P Holtham, K C. Runge, E Tabosa
Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro
Sep 1, 2014
-
Overseas Research Directions
The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing
Jan 1, 1986
-
Mine Shafts – Planning, Optimising and Constructing
By D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Characterisation and Beneficiation of the Glass Sand Deposits of Bangladesh
The investigation of Noapara glass sand deposit in Sylhet district of Bangladesh is performed to beneficiate the sand for the manufacture of colourless glass. For the ease and efficient removal of the
Jan 1, 2000
-
Textural Characterisation of Manganese Minerals to Improve the Geometallurgical Characterisation of Ferromanganese and Iron Ores
By S Hapugoda, J R. Manuel, M J. Peterson, A Poliakov, E Donskoi
The occurrence and deportment of manganese in a number of ferromanganese and Mn-bearing iron ore samples from supergene-upgraded deposits, as well as from magnetite banded iron formation (BIF) and mag
Aug 12, 2013
-
Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study
By L Smith, R Beckie
An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w
Jan 1, 2003
-
Design of the West Fork Mill
The West Fork project is located in Reynolds County, Missouri, in the mineralized zone referred to as the Viburnum Trend. The West Fork orebody has a calculated ore re- serve of 13 600 000 tonne (1
Jan 1, 1978
-
Studies on the Beneficiation of Indian Iron Ore Slimes Using the Flotation Technique
By S Prakash, P S. R Reddy, S K. Biswal, V N
The beneficiation potentials of two Indian iron ore slime samples by flotation technique using both cationic and anionic collectors are investigated. The direct and reverse flotation of slimes using o
Jan 1, 2005
-
A generalised form of Gy’s equation for gold ores – empirical evidence
By R C. A Minnitt
The two methods for calibrating the parameters K and (alpha) for use in Gy’s equation for the fundamental sampling error (FSE), the duplicate sampling analysis (DSA) and the segregation fractionalised
May 9, 2017
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City
By A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
The Integration of Geometallurgy with Plant Design
By G Harbort
Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat
Aug 8, 2011
-
Newmont Tanami Operations – Tailings Storage Facilities
By S Thacker, M Noakes
The Newmont Tanami Operations (NTO), formerly the Granites Gold Mine, commenced operation in the mid-1980s with tailings deposition evolving over the past three decades as production has increased and
Jul 27, 2015
-
Public reporting – new standards or no standards?
By J Coombes, R Sterk
The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating
Sep 20, 2017
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process
By T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
Olympic Dam Operations Review
The Olympic Dam copper/uranium deposit was discovered in 1975 and subsequently commenced production in 1988 at a rate of 1.5 Mtpa using the sublevel open stoping mining method. In the following five y
Jan 1, 1998
-
Building Sustainability Into a Project
Organisations are starting to develop processes for achieving sustainability principles they have defined for their organisation. The foundation for these principles is now well accepted. The definiti
Jan 1, 2004
-
A Flotation Study for Effective Separation of the Heavy Mineral Sands
By Takiuchi T, Kurita M, Owada S
This paper describes the possibility of the application of flotation to the separation of monazite from xenotime and of columbite from ferberite, which have been said to be difficult with generally
Jan 1, 1993
-
Optimisation of Grinding Circuits at the Lead/Zinc Concentrator, Mount Isa Mines Limited
By Drinkwater DJ, Watsford RMS, Johnson NW, Munro PD
This paper describes the use of modelling and simulation techniques in the analysis and optimisation of grinding circuits at the Lead/Zinc Concentrator of Mount Isa Mines Limited.The objectives of the
Jan 1, 1985
-
Strip and Line versus Blind Sink Shaft Sinking – The Ernest Henry Decision
By C J. Carr
The Ernest Henry Mine (EHM) is owned and operated by Xstrata Copper and is located in North-West Queensland, Australia. The mine is currently undergoing a transition from an 11 Mtpa open pit mine to a
Mar 21, 2011
-
Using Dynamic Simulation Throughout a Process Plant's Life Cycle
Using Dynamic Simulation Throughout a Process Plant's Life Cycle
Sep 13, 2010