Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs Extension
By Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Micro Tunneling 1.2-Mile, 72-In RCP With Crossings Of NJ Turnpike And CSX Railroads
By Zhenqi Cai
The ongoing Overpeck Valley Parallel Sewer Project of Bergen County Utilities Authority (BCUA), New Jersey, is a US $65 million CSO improvement program to meet a State DEP consent order by 2010. One m
-
Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO
By Carl Johnson, D. R. Todd
The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie
Jan 1, 2005
-
Analysis of Rheological Characteristics of Deep-sea Mining Robot’s Roller
By Hyung-woo Kim, Kiyoung Sung, Sup Hong, Jung-Yeul Jung
Many concepts for the commercial production of deep-seabed manganese nodules have been studied since the 1970s. However, the bearing capacity of the deep seabed is not strong because it is composed of
Sep 1, 2014
-
Atmospheric monitoring systems for very large mines
By A. E. Ketler
Conventional Atmospheric Monitoring System (AMS) installations for monitoring CO, CH4, O2 and air-velocity throughout underground mines are usually relegated to a modest 3-5 mile extent and with data
Jan 1, 2009
-
bauma ’04 Attracts More Than 410,000 Visitors
More than 410,000 visitors from 171 countries helped bauma ’04 set new attendance records at the world’s largest construction machinery and mining technology show. The show, held in Munich, Germany M
Jan 1, 2004
-
Tunneling Under Glaciers Galore Creek Mine Access Tunnel, BC, Canada
By Dean Brox, Jason Morrison, Peter Procter
The Galore Creek Mine project is one of the newest major mining projects underdevelopment in Canada. The project is located in a very remote area of northwester British Columbia and is being developed
Jan 1, 2007
-
Cellular Acclimation Of Acidithiobacillus Ferrooxidans To Sulfur Biooxidation
By C. -G. Zhang
This paper presents the results of a study on cellular acclimation of Acidithiobacillus ferrooxidans to sulfur biooxidation in terms of cells growth and changes in surface properties and morphologies
Jan 1, 2009
-
2010 Permeation Test Results For Grouts Made With Ultrafine Cement
By Raymond W. Henn
The 31th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, in Golden, CO June 7-11, 2010. The field demonstration portion of the course was con
Jan 1, 2010
-
Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000
By Andy Mille
The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d
Jan 1, 2001
-
Operators Use First-Out Fault Detection To Dramatically Reduce Equipment Downtime
By R. Schulz, K. King
Concentrating Line 6 just went down again. The control room operator checks the graphic display. Only one piece of equipment shows an alarm. Clicking on the ball mill icon, he discovers the culprit wa
Jan 1, 2001
-
The Potential Of GPS Guidance In The Mining Industry
Recent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad
Jan 1, 2004
-
Overcoming Challenges in the Construction of the Dublin Port Tunnel
By Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan
The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a
Jan 1, 2007
-
Seismic Upgrades of the Claremont Tunnel
By Bill Cain, R. John Caulfield, D. Scott Kieffer
The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl
Jan 1, 2001
-
Reflections on ilmenite roasting and magnetic separation
By N. R. Allen, J. D. Steenkamp
Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of
Jan 1, 2005
-
Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels
By Richard A. Cubeta
Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and
Jan 1, 2008
-
How To Deliver Your Project On Time: An Owners? Procurement Strategy
By Wayne Green
The Regional Municipality of York, located north of the City of Toronto in Ontario, Canada, has experienced unprecedented growth during the past decade, with new home construction averaging 15,000 uni
Jan 1, 2010
-
Processing researchers continue efforts to streamline US mining
By P. Rosten
US mine production of iron ore in 1984 showed some improvements compared to 1983. But reduced demand from the iron and steel industry caused temporary shutdowns of many iron ore mines and pelletizing
Jan 5, 1985
-
Characteristics Of Chimney Subsidence Sinkhole Development From Abandoned Underground Coal Mines Along The Colorado Front Range
By Gordon M. Matheson
The factors which control chimney subsidence sinkhole development in weak rock were assessed by analyzing the characteristics of approximately 3000 chimney subsidence features along the Colorado Front
Jan 1, 1986
-
No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New Tunnels
By Aram Grigoryan
This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the