Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ventilation and atmosphere control inside a 3-bar compressed air TBM heading

    By B. R. Zernich

    Advances in tunneling technology, such as Earth Pressure Balance and Slurry Shield methods, have allowed the tunneling industry to construct tunnels in increasingly difficult ground conditions. In rec

    Jan 1, 2009

  • SME
    Haul Truck Fuel Consumption And CO2 Emission Under Various Engine Load Conditions

    By V. Kecojevic

    Environmental and economic costs related to equipment fuel consumption and carbon dioxide (CO2) emission present a substantial challenge to the mining industry. Haul trucks are an integral part of the

    Jan 1, 2011

  • SME
    M5 East Tunnels: A Flat Roofed, Bolt and Shotcrete-Lined Highway

    By Isabelle Lamb, Manfred K. Lechner, Daniel N. Adams

    Sydney Australia’s M5 East Motorway connects southwestern suburbs to the airport. Central to the project are twin 3.8 km roadway tunnels which are mostly driven through rock. In order to come up with

    Jan 1, 2001

  • SME
    A Snapshot Of Noise And Worker Exposures In Sand & Gravel Operations

    By E. R. Bauer

    Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min

    Jan 1, 2008

  • SME
    Tailings Paste Disposal ? More Than Water Recovery

    By S. Slottee

    The technology of making and using ?paste? from mine tailings is increasingly well known by the minerals industry. The primary applications are water recovery and ?stacking? of tailings with minimal

    Jan 1, 2011

  • SME
    The Effectiveness Of Several Enclosed Cab Filters And Systems For Reducing Diesel Particulate Matter

    By J. Noll

    Many underground metal/nonmetal mines are using enclosed cabs on mining equipment to reduce the exposure of miners to diesel particulate matter (DPM). However, some enclosed cab systems may not be me

    Jan 1, 2011

  • SME
    Whither Mining Engineering Education?

    By J. J. K. Daemen

    Mining Engineering education is in trouble, if not in crisis. The most visible signs are the decrease in the number of programs that offer the degree, and the continued difficulties in attracting stud

    Jan 1, 2004

  • SME
    Finding Added Value At Newmont Through Large-Scale Mining Sequence, Cutoff Grade And Process Optimization Using Mixed Integer Linear Programming

    By L. Clark

    Despite near-record commodity prices, the mining industry continues to search for ways to maintain profits in these times of steadily increasing energy prices and steadily decreasing grades. The pres

    Jan 1, 2007

  • SME
    A Practical Approach For Precast Concrete Segmental Ring Selection

    By Steve Skelhorn

    Over the recent years, major advances have been made in design of precast concrete segmental tunnel liner. Starting from basic, parallel sided rings, we now have state of the art, universal rings inco

  • SME
    The Mine Central Control Room: From Concept To Reality

    By K. Short

    Today?s modern mining operations have literally dozens of applications and systems generating data whose information very often, are not crossed or centralized for operational decisions. In remote lo

    Feb 27, 2013

  • SME
    A preliminary study of the unsteady states of the ventilation parameters at the longwall face during the shearer operation

    The ventilation conditions at the underground coal mines are influenced; first: by the disturbances of the natural nature (barometric pressure, methane liberation, etc.), and second: by the disturbanc

    Jan 1, 2009

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • SME
    Relationship Between Bond Work Index And Textures And Cooling Method Of Granulated And Cooled Ferronickel Refining Slags

    By D. Richter

    The Pyrometallurgical refining stage of ferronickel manufacturing produces a slag rich in iron and nickel, which is usually further processed for metal recovery. The recovered material is returned to

    Jan 1, 2011

  • SME
    Coal Pillar Strength Based On The Ground Reaction Curve ? A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME
    Effects Of Water Sprays Used With A Machine-Mounted Scrubber On Face Methane Concentrations

    This study was conducted to determine the effects of a machine-mounted scrubber and water sprays on face methane levels. Testing was conducted in the NIOSH ventilation test gallery which was designed

    Jan 1, 2001

  • SME
    Chemical Demineralization Of Three Different Graphite Ores From Turkey

    By Ö. Kaya

    The removal of gangue minerals from three different graphite ores (Inebolu, Akdag?madeni and Çoraklidere) from Turkey by acid leaching was studied. Acid leaching experiments were applied to the flotat

    Jan 1, 2009

  • SME
    Northern Ontario Pushes to Expand Mining Investment

    By Steve Kral

    The mining industry in northern Ontario is known mostly for its huge nickel deposits. Inco’s and Falconbridge’s nickel mines in the Sudbury Basin are the best known. And with nickel prices being wha

    Jan 1, 2006

  • SME
    Haile Gold Mine Metallrgy And Flowsheet Review

    By J. Wickens

    Haile Gold Mine is located near Kershaw, South Carolina, approximately 50 miles south of Charlotte, North Carolina. Gold was first discovered at the site in 1827, and the property has been through sev

    Feb 27, 2013

  • SME
    Regrind Mills: Scaleup Or Screwup

    As ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind

    Jan 1, 2011

  • SME
    Quantitative inventories of single THM (total heavy mineral) products using combined mineralogical methods

    By C. C. Hamilton, G. R. Lane

    Traditionally, mineral sands are evaluated by preparing several mineral products using a combination of heavy liquid-, magnetic-, and electrostatic methods. Whole-rock assays (WRA) are then conducted

    Jan 1, 2005