Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Soil Profiles Along The Alignment Of The I-880 Replacement Project

    By Mark A. Willian

    The purpose of this short paper is to present soil profiles and basic soils information for the portion of the I-880 Replacement Project alignment where highway structures are to be built. The informa

    Jan 1, 1996

  • DFI
    Brightman Street Bridge Replacement Project

    By Arturo Ressi di Cervia

    Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, conc

    Jan 1, 2003

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    Deep Caisson Foundations In China ? Synopsis

    By C. Y. Liu

    This paper principally deals with the application of caisson foundation in the Chinese bridge building industry, the different types of caisson foundation adopted, and their spheres of application. Ca

    Jan 1, 2010

  • DFI
    Axial Cyclic Degradation of Marine Piles: A Strain-Based Fatigue Limit

    By Aaron S. Bradshaw, Ryan M. Coulson

    The offshore wind industry in the United States is slowly emerging with the recent construction of the first offshore wind farm located off the coast of Rhode Island. The turbines at the Block Island

    Jan 1, 2018

  • DFI
    Concrete Overbreak Estimation and Analysis Errors in Bored Piles

    By Nuno Cruz

    "The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before

    Jan 1, 2017

  • DFI
    Acrylamide Grouting: Successfully Controlling Groundwater From Canada To South America

    By Jom Gentry

    Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr

  • DFI
    Foundations For Offshore Wind Energy Converters - A Review Of Some Current Scadinavian Development Projects

    By K. Viking

    This article deals with some of the civil engineering related problems to be encountered when offshore wind energy projects transform from prototype offshore wind energy converter farms, developed and

    Jan 1, 2005

  • DFI
    Working Platforms In Geotechnical Jobs: Recommendations For Execution And Maintenance

    By Gustavo Armijo

    Slippery and unstable working platforms spoiled not only by natural weather conditions but also by the effects of the construction process (drilling mud, grout slurry) are among the main sources of ha

    Jan 1, 2006

  • DFI
    Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?

    By J. A. Hayes

    For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d

    Jan 1, 2003

  • DFI
    The Contest On The Prediction Of Capacity Of A Bored Pile Constructed Under Polymer-Based Slurry In Bangkok Subsoil

    By Narong Thasnanipan

    This paper presents the outcome of the contest on the prediction of the static axial load capacity of diameter 1.20m bored pile founded at 46m below existing ground. The test pile was constructed by w

    Jan 1, 2006

  • DFI
    Performance Of A Large Diameter Drilled Pier (f4c3f0c8-a45b-48d0-8d0a-138a34a08ce3)

    By A. J. Partos

    The figures and tables referred to herein are presented in the Proceedings; Volume I, Pages 309 through 316. The 61-story One Liberty Place, at 315 m., is the tallest building 1n Philadelphia and

    Jan 1, 1991

  • DFI
    Understanding Soils Reports - Presented At A Structural Engineers Association Of Northern California Continuing Education Seminar On Foundations/Excavations, March 1984

    By Loring A. Wyllie

    Preparation, understanding and use of soils reports must be a team effort to be fully effective. The soils engineer must know what is to be built and exactly where. The structural engineer and owner m

    Jan 1, 1986

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • DFI
    Rapid Vibratory Pile Driving Hammer For Deep Foundation

    By Li Tiemin

    It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera

    Jan 1, 1991

  • DFI
    Issues In The Performance-Based Seismic Evaluation Of Sheet Pile Quay Walls

    By Dimitris Pachakis

    In this paper, the authors give a brief overview of the current practice guidelines and tools for the seismic design of sheet pile quay walls, emphasizing how the design guidelines are lacking when th

    Jan 1, 2011

  • DFI
    Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis

    By M. A. El-Sohby

    The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin

    Jan 1, 2010

  • DFI
    Skilled Operative Training For The Foundation Industry - Summary

    By Geoffrey Birch

    A skilled and efficient workforce is a pre-requisite for the success of modern construction companies. The drive for improved performance, innovation and best value must be matched by the enhanced ski

    Jan 1, 2000

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002