Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Capturing unrealized capacity

    By M. W. Lewis, B. Sambirsky, J. Werner

    A mine’s inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. The inh

    Jan 1, 2004

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    Participative Management at the Golden Giant Mill, A Co-Ordinators Perspective

    By K. Barr, F. Grenier, J. Hettinger

    "To reach the Hemlo Gold Inc. objective of becoming the lowest cost, safest Canadian gold producer while causing no environmental damage, management embarked from its inception on a strategy to build

    Jan 1, 1988

  • CIM
    Hydraulic Hoisting & Long Distance Pumping of Coal

    By R. E. McElvain

    "Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.

    Jan 1, 1978

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    An Economic and Environmental Case for Re-processing Gold Tailings in South Africa

    By James A. Brown, Marius Botha, Christopher A. Fleming

    "The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig

    Jan 1, 2010

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    A History of Improvements at the Kemess Concentrator

    By Paul Grady, Martin Froehling, Curtis Mohns, Eliab Roman

    "Since the idea of processing rock to unlock the valuable minerals inside was put into practice, efforts to improve production began. Methods have been learned that allow for operation in environments

    Jan 1, 2005

  • CIM
    Fine Grinding Applications Using the Metso Vertimill® Grinding Mill and the Metso Stirred Media Detritor (SMD) in Gold Processing

    By Graham Davey

    "Low speed stirred milling has been employed for many years in the metalliferous and industrial minerals industries. High speed stirred milling is a relatively new method of grinding in the metallifer

    Jan 1, 2006

  • CIM
    Mining the Retreat Zone Between Two Converging Pyramids at Noranda?s Bell-Allard Mine

    By Véronique Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modeling

    May 1, 2003

  • CIM
    Dynamic hydraulic shovel simulator for improved machine performance

    By S. Frimpong

    Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency

    Jan 1, 2005

  • CIM
    Modelling and Resource Estimation of a Thin-Layered Lignite Deposit

    By Ioannis K. Kapageridis

    The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging

    Oct 1, 2009

  • CIM
    Monitoring the Burner Emission Spectrum in a Commercial Flash Furnace Using a Novel Optical Probe

    By G. Stokreef, B. R. Davis, M. Kadiyski, Alvear Montenegro, H-P. Loock, V. Montenegro

    An optical probe for burner monitoring in copper flash smelting, first developed at the University of Concepcion, is being industrially tested in a collaboration between Kingston Process Metallurgy, A

    Jan 1, 2019

  • CIM
    Continuous Vat Bio-Oxidation of a Refractory Arsenical Sulphide Concentrate

    By P. Brad Marchant

    "To properly evaluate bioleaching as a commercial alternative for sulphide concentrate oxidation, to enhance cyanidation response, it was necessary to define and optimize critical operating variables

    Jan 1, 1985

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004