Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Hard Automation Trends in Australian Underground Coal Mines

    By Stephen van Duin

    As productivity in coal extraction demands increase in underground coal mines, the industry is faced with finding new ways to support production without jeopardising safety. In modern mines the capaci

    Aug 1, 2013

  • CIM
    Raise Boring at The International Nickel Company of Canada,• Limited, Ontario Division

    By W. J. Taylor, T. D. Parris

    "Over 90,000 feet of raise have been bored at International Nickel underground mining operations throughout the Sudbury District since the advent of raise boring in the early part of July, 1964. With

    Jan 1, 1972

  • CIM
    Consideration of Post-Peak Response of the Pillar-Rock System in Sill Pillar Design

    By Omkar N. S. Beruar

    Extraction of sill pillars has always been problematic because of high risk of seismicity and rockburst. Depending on a number of factors, a sill pillar can undergo different failure modes and cause p

    Aug 1, 2013

  • CIM
    Natural Gas in Canada and Its Uses

    By R. T. Elworthy

    Canada ranks second in the list of world consumers of natural gas. In 1923 our production was nearly fifteen million thousand cubic feet valued at $5,800,000. Our output, however, appears very small c

    Jan 1, 1925

  • CIM
    Simulation of possible Bronze Age copper-iron alloy production by smelting dead-roasted ferruginous sulphidic copper ores

    By A. Paulin, J. Roth, S. Spaic

    This experiment was carried out to see whether copper-iron ingots from Late Bronze Age hoards could have been produced by smelting ferruginous copper ores. Since ferruginous copper-ores are chalcopyri

    Jan 1, 2001

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • CIM
    ISO 26000 Does It Make a Difference

    By Joanne G. Petrini

    ISO 26000 Unique Process Unique Personality ?Almost 10 years in the making ?What type of standard is this? Different type of ISO Standard ISO 26000 Structure and Substance ?Principles ?Core Su

    May 1, 2011

  • CIM
    A time-value framework for reporting mineral assets

    By E. J. Sides

    In this paper, the argument is put forth that the codes used for public reporting of mineral resources and mineral reserves have some significant limitations with regard to the information provided to

    Jan 1, 2010

  • CIM
    Western Canada Lower Cretaceous Heavy Oil Accumulations

    "The Upper Mannville unit commonly consists of interbedded marine and non-marine sands and shales, but in northwestern Alberta the unit consists of marine shales of the Spirit River Formation. A thick

    Jan 1, 1966

  • CIM
    Iron Operations of the Quebec Iron and Titanium Corporation

    By G. G. Hatch

    FOLLOWING World War II there was an urgent need for the development of domestic sources of ilmenite to take care of the expanding needs of the titanium dioxide pigment industry. In addition, there was

    Jan 1, 1956

  • CIM
    Coal-Cutter Chains and Picks

    By O`Donnell. P. J.

    THE modern coal cutter is a highly developed, and to a certain extent a somewhat complicated, machine. The requisite power to cope with conditions as found must be generated by the motor with due rega

    Jan 1, 1936

  • CIM
    Banking/Financing Viewpoint: Beyond the Feasibility Study

    By David Laing

    Completion of a Feasibility Study represents a major milestone in the development path of a mine, and one which typically triggers a need for project financing. Obtaining funding for construction reli

    May 1, 2010

  • CIM
    The development of new exploration technologies at Noranda: Seeing more with hyperspectral and deeper with 3-D seismic

    By M. Peshko, J. C. Gingerich, L. W. Matthews

    "Noranda has successfully developed and implemented two leading-edge mineral exploration technologies — hyperspectral remote sensing and 3-D seismic surveying. Airborne hyperspectral imaging provides

    Jan 1, 2002

  • CIM
    Converting using Isasmelt? Technology

    By J. S. Edwards

    The ISASMELT? process is recognized worldwide as a modem, flexible, environmentally-friendly and low capital cost smelting technology. Due to the inherent simplicity, and the advanced process control

    Jan 1, 2007

  • CIM
    Characterization and Reduction of Filter Dusts in the Liquid Phase

    By S. Steinlechner, G. Schneeberger, J. Antrekowitsch

    The recycling of steel mill dusts is getting more and more important. The costs and requirements of land filling are rising and companies are interested in new recycling strategies. The rising of sust

    Jan 1, 2011

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • CIM
    Review of Coal Beneficiation Practices in Canada

    By T. A. Lloyd

    "This paper indicates the extent to which Canadian coal mine operators have taken advantage of developments in the science and technology of coal that would allow them to better satisfy changing marke

    Jan 1, 1968

  • CIM
    Televigile - An Automated System for Remote Surveillance and Information Gathering in Mines

    By R. Tervo, G. Ellie

    "Automated information systems are being developed very rapidly in Europe. In France, Belgium and West Germany, more than 70% of the coal production is controlled by these installations. Information o

    Jan 1, 1973

  • CIM
    The Ecstall Story: The Open-Pit Mine

    By George C. Coupland

    "THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc

    Jan 1, 1974

  • CIM
    Fracture Control on the Tertiary Epithermal-Mesothermal Gold Deposits Northern Black Hills, South Dakota

    By Alvis L. Lisenbee, Colin J. Paterson, Mustafa M. Hariri

    "Abstract-The schist-, sediment-, and intrusion-hosted Tertiary Au-Ag hydrothermal deposits of the northern Black Hills, South Dakota are localized and controlled by various types of fractures. This s

    Jan 1, 1995