Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Impartiality and Fairness in Stakeholder Engagement Through Triangular Value Analysis

    By J L. Stacey

    The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati

    Jan 1, 2009

  • AUSIMM
    Conditions and Design Considerations for Maximising Recoverable Gold in Roasting of Refractory Gold Ores

    By M G. Aylmore, L W. de Klerk

    Roasting of refractory gold ores has been a commercial process for many years. Improvements in design of fluidised bed roasting technologies and low capital and operating costs compared with other ref

    Sep 26, 2013

  • AUSIMM
    Development of a Dynamic Blasting Simulation

    Blasting, particularly bench blasting, uses finite length cylinders of explosive close to two free faces. The rock to be blasted is usually intersected by a complex 3-D system of joints. To fully si

    Jan 1, 1990

  • AUSIMM
    Fluid Pressure, Geomechanical Evolution and Predictive Targeting of the Sunrise Dam Gold Deposit, Western Australia

    By M J. Nugus, J G. McLellan, T G. Blenkinsop

    High fluid pressures and deformation have been instrumental in the formation of high-grade gold lodes at the Archaean granite greenstone 12 Moz Sunrise Dam gold deposit in Western Australia. Historica

    Sep 26, 2013

  • AUSIMM
    Advancing Near-Mine Exploration with an Updated Geological Model for the Mount Wright Gold Deposit, Queensland

    By K Johnson, G Morrison, N Lisowiec

    The Mount Wright gold deposit is located near the town of Ravenswood, ~90 km south of Townsville, in north Queensland. The deposit has been mined by underground methods since 2006. It produced approxi

    Sep 26, 2013

  • AUSIMM
    Fine grinding circuit process improvement at the Karara mine concentrator

    By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy

    The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag

    Sep 11, 2017

  • AUSIMM
    High Resolution Soil Geochemistry for Gold Exploration at the Continental, Regional and Prospect Scale

    By P de Caritat, A Davidson, A Mann

    Top outlet sediments from the National Geochemical Survey of Australia have been extracted by a partial extraction method for over 50 elements including gold. The partial extraction results from this

    Sep 26, 2013

  • AUSIMM
    Grinding Circuit Practices at Newmont

    By A Giblett, S Hart

    "In 2015 operations under the ownership and/or management of all Newmont Mining Corporation subsidiaries (Newmont) produced 5.7 Moz of gold and 619 Mlb of copper from mining operations in five countri

    Oct 10, 2016

  • AUSIMM
    Computer Modelling Techniques and their Application to mine Evaluation and Operation

    By Stokes WPC

    The capital requirements to develop a new mining venture are becoming very large; amounts of the order of US$1,000 million are not now unusual among estimates to bring new mining complexes into pr

    Jan 1, 1980

  • AUSIMM
    A Study of the Electro-Kinetic Properties of Activated Carbon Used as a Tool for Gold Extraction

    Attempt has been made to determine the nature of charge on activated carbon surface by studying the electro-kinetic properties of the carbon in the presence of cations, anions and aurocyanide solut

    Jan 1, 1982

  • AUSIMM
    The evolution of the Cadia 40-foot SAG mill to treat the Cadia East orebody: a case study of incremental change leading to operational stability

    By J Seppelt, B Akerstrom, A Rice, J Bubnich, T Waters

    The Concentrator 1 plant at Cadia transitioned from Cadia Hill open pit to the Cadia East block cave ore body in 2013. As a result of this change, major plant upgrades were required to achieve the des

    Aug 29, 2018

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    A Preliminary Investigation into Electro-Strengthening of Tailings for Surface and Underground Disposal

    By Chappell B

    Backfill in the form of mine waste tailings has inherent problems associated with attaining adequate strengths upon placement. Fines are usually removed to ensure adequate drainage, which lowers the

    Jan 1, 1998

  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    A Review of the Influence of Gas Pressure on Block Stability during Rock Blasting

    Blasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there

    Jan 1, 1999

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013

  • AUSIMM
    Methods of Increasing Production in A Travelling Grate Pellet Plant Limited by Drying Capacity

    By Thomas CG, Armstrong GJ, Lynch KS

    A small glass walled pot grate has been used to simulate drying of iron ore pellets in a travelling grate plant. This equipment has enabled the effect of decreasing grind and de- creasing pellet bu

    Jan 1, 1972

  • AUSIMM
    Towards an understanding of production costs at Australia’s underground gold mines

    By A Trench, S Ulrich, S Hagemann

    A synthesis of reported All-In Sustaining Costs (AISC) for 57 Australian gold mines in the period 2014–2016 reveals for the first time the clear influence of grade upon cost performance, most evident

    Oct 16, 2017

  • AUSIMM
    Computer Assessment of Grades and Tonnages in an Operating Open-Pit Mine

    Digital computers, by virtue of their capacity for high speed repetitive calculation at low cost, are finding increasing application to routine calcula- tions in the mining industry. In this paper te

    Jan 1, 1971

  • AUSIMM
    Direct reduced iron (DRI) – value of process monitoring using X-ray diffraction

    By M Pernechele, U König

    Most of the operating steelmaking capacity currently relies on conventional, coal-based steelmaking processes. Currently, direct reduced iron (DRI) is only produced in regions where energy is availabl

    Sep 18, 2023