Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Surface and groundwater monitoring and seepage control at the Sungun Copper Mine

    By N Pirouznia, F Rashidi Nejad, S Naraghi

    Sungun Copper Mine, which is the second largest copper mining operation in Iran has a large tailings storage facility with a seepage control dam located downstream of the main dam. Surface and groundw

    Jul 23, 2018

  • AUSIMM
    Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam Expansion

    By H Bateman, I Cawrse, G Carnes, S Cawrse

    In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro

    Jan 1, 2009

  • AUSIMM
    Alternative Access, Mining and Hoisting for Underground Deposits

    It is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam

    Jan 1, 2000

  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    Characterisation of Gold Ores by X-Ray Computed Tomography – Part 2: Applications to the Determination of Gold Particle Size and Distribution

    By S C. Dominy

    For any gold deposit-based geometallurgical study, the collection and processing of representative samples for gold grade and recovery tests is critical. Sampling protocols should be designed to suit

    Sep 5, 2011

  • AUSIMM
    Cardox Blasting Trials at Waihi Gold Mining

    By A Van Kersen, J Hodson

    Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t

    Jan 1, 2001

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Can robots break the drill and blast bottleneck in underground roadway development in hard rock?

    By M Berner, N A. Sifferlinger, E Fimbinger

    Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p

    Sep 1, 2024

  • AUSIMM
    Swedish Slot Raise Drilling Method at the Louvicourt Mine

    The Louvicourt Mine is located 600 km north of Montreal in the province of Quebec, Canada. The owners are Aur Resources Inc (30 per cent), mine operator, Novicourt Inc (45 per cent) and Teck Corporati

    Jan 1, 2002

  • AUSIMM
    Carbonate in Synthetic and Biological Apatites

    By X Liu

    The crystal chemistry of carbonate in Ca apatites, including Na-free and Na-bearing hydroxylapatite (CHAP) and Na-bearing fluorapatite (CFAP) and chlorapatite (CCLAP), has been investigated by Fourier

    Jan 1, 2008

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Oxygen Pressure Leaching of a Bulk Flotation Concentrate form a Complex Cu-Pb-Zn Sulphide Ore

    By Canterford J. H, Sparrow G. J, Dyson N. F

    Pressure leaching of a bulk flotation concentrate prepared from a complex Cu-Pb-Zn sulphide ore was carried out at 150 and 190¦C under 1050 kPa oxygen overpressure in 1 L and 4 L titanium autoclave

    Jan 1, 1989

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    Modern mining – why bandwidth matters

    By D Kent

    "There has been a revolution occurring in underground mining over the last several years, where big headline items such as the Internet of Things (IoT), optimisation, managing data, data mining etc –

    Oct 16, 2017

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, Canada

    By J Millard, K Sexsmith

    BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb

    Jan 1, 2003

  • AUSIMM
    Investigations on Lead Roasting at the Sulphide Corporation's Works at Cockle Creek, N.S.W.

    THE paper is principally eoncerncd with experimental work carried out the author whilst a number of the metallurgical staff at the Cockle Creek works. The metallurgical has been discussed sufficiently

    Jan 1, 1924